Which characteristics must a project have for critical path scheduling to be applicable? Which types of projects have been subjected to critical path analysis? 2. Explain why "Project control should always focus on critical path" 3.Explain the term material handling. What are the advantages of a well-planned and integrated system of material handling? 4 Discuss project type layout, where are it in use? Discuss it's advantages and disadvantages 5. Will the use of a decision tree analysis guarantee the best decision for a firm? Why or why not? If not, why bother using it. 6. What are some of the main advantages and disadvantages of specialization from management perspective? From Worker's perspective? 7. What is ergonomics and why is it important in job design? Explain how it can relate to quality of work life.

Answers

Answer 1

It is essential in job design because it improves the quality of work life by reducing injury rates, decreasing employee absenteeism, and increasing job satisfaction.Ergonomics is the science of designing work environments and work procedures to minimize physical discomfort and improve efficiency.

1.Characteristics that a project must have for critical path scheduling to be applicable are:There must be a well-defined objective that is quantifiable.2. Critical path analysis has been employed in a variety of project types. Construction projects, new product development initiatives, and software development projects are the most common types of projects that use critical path analysis.3. Material handling can be defined as the movement, control, and storage of products in a facility.

The use of decision tree analysis does not ensure the best decision for a company because it depends on the accuracy of the data used in the analysis. If the data is incorrect or misleading, the decision tree analysis will produce the incorrect solution. It is still beneficial to use decision tree analysis because it allows for a more systematic and well-informed decision-making process.

To know more about quality visit:

https://brainly.com/question/32332409

#SPJ11


Related Questions

Select the correct answer Clive wants to write a query that will display the names of the students who scored less than 10 in their final exams. Which numerical function should he use in his query? A. POWER(x,y) B. FLOOR(x) C. SQRT(x) D. MOD(x,y) E. CEILING(x).

Answers

The correct answer is E. CEILING(x). Clive wants to display the names of the students who scored less than 10 in their final exams.

To achieve this, he needs to compare the scores of the students with a threshold value of 10. The CEILING(x) function rounds up a number to the nearest integer greater than or equal to x. By using the CEILING(x) function, Clive can ensure that only scores less than 10 are considered, as any score of 10 or above will be rounded up to the next integer.

Therefore, Clive should use the CEILING(x) function in his query to accomplish his goal.

Learn more about CEILING(x) function here:

https://brainly.com/question/17084926

#SPJ11

wat is 6x6+63+90-331x5

Answers

The Answer is -1466.

Explanation:

Answer:

-1466

Explanation:

Give brainliest and I will do step by step!

Step by step-

6 X 6= 36

-331 X 5= -1655

63 + 90= 153

153 + 36= 189

-1655 + 189= -1466

A durable power of attorney must terminate within a specified period of time once a person becomes incompetent. A) True B) False Question 14 (4 points) Some state statues specifically state what condi

Answers

The statement "A durable power of attorney must terminate within a specified period of time once a person becomes incompetent" is false.

This is because a durable power of attorney is intended to last indefinitely, even after the person granting the power becomes incapacitated or incompetent.What is a durable power of attorney?A durable power of attorney is a legal document that gives a designated person, known as an agent or attorney-in-fact, the power to make legal decisions on behalf of another person, known as the principal. The durable power of attorney remains in effect even if the principal becomes incapacitated or unable to make their own decisions due to illness, injury, or other circumstances.

This makes it a useful tool for estate planning and ensuring that one's affairs are taken care of even in the event of incapacity or incompetence.Do durable powers of attorney expire?Durable powers of attorney can expire under certain circumstances, but the incapacitation or incompetence of the principal is not one of them. Instead, a durable power of attorney may terminate if the principal revokes it, if the agent dies or becomes incapacitated, if the agent resigns or is removed, or if the purpose of the power of attorney has been fulfilled.

Some states may also require that a durable power of attorney be reviewed or renewed after a certain period of time, such as five or ten years, but this does not mean that it automatically terminates upon the principal's incapacity or incompetence.

To learn more about durable power:

https://brainly.com/question/32327842

#SPJ11

A computer programmer turns over all access to
files before leaving a company for retirement.
be fair and honest with customers.
protect sensitive information.
do no harm to a company when leaving.
protect system access of users.

Answers

A computer programmer turns over all access to files before leaving a company for retirement means, we should do no harm to a company when leaving.

Who is a computer programmer?

This refers to the person that performs the process of computation usually by designing and building an executable computer program.

Hence, when he/she turns over all access to files before leaving a company for retirement means, we should do no harm to a company when leaving.

Read more about computer programmer

brainly.com/question/797477

#SPJ1

Answer:

C). Do no harm to a company when leaving.

Explanation:

I just did the Assignment on EDGE2020 and it's 200% correct!  

Also, heart and rate if you found this answer helpful!! :) (P.S It makes me feel good to know I helped someone today!!)  :)

A computer programmer turns over all access to files before leaving a company for retirement. be fair

Employers must provide a stairway or ladder if the elevation between two surfaces on a site is.

Answers

Employers are required to provide a stairway or ladder at all worker points of access if there is an elevation change of 19 inches (48 cm) or more and no ramp, runway, embankment, or personnel hoist is provided.

What are the elevated work surfaces OSHA regulations?

The final rule codifies OSHA's guidance for companies using RDS for elevated work. Employers are not allowed to utilize RDS over 300 feet above grade unless they can show that doing so would be impractical or provide a greater risk than utilizing another system.

OSHA, how tall may a platform be without a step?

Now that we are clear on how OSHA defines a platform and that any exposed side or edge that is four feet or higher than a lower level need fall protection to prevent employees from falling, let's talk about guardrail specifications for work platforms.

To know more about OSHA visit:

https://brainly.com/question/9178716

#SPJ4

Explain how the CM and SM are used in management decision-making

Answers

CM (Contribution Margin) and SM (Segment Margin) are important financial metrics that are used in management decision-making to analyze and evaluate the profitability and performance of products, services, or business segments. Here's how CM and SM are used: Contribution Margin (CM): CM represents the amount of revenue remaining after deducting variable costs directly associated with the production or sale of a product or service.

It is calculated as the difference between total sales revenue and total variable costs. CM helps management understand the profitability of individual products or services, as well as their overall contribution to covering fixed costs and generating profits. By calculating CM per unit or as a percentage, managers can compare different products or services and make informed decisions about pricing, production volumes, and resource allocation. Segment Margin (SM): SM is similar to CM but focuses on analyzing the profitability of specific business segments or divisions within a company. It calculates the contribution margin for a particular segment by subtracting both variable costs and direct fixed costs associated with that segment from the segment's revenue.

learn more about :- Contribution Margin  here

https://brainly.com/question/32772728

#SPJ11

One cost of starting your own business is
A. Loan payments on a small business loan
B. Escrow
C. Revenue
D. PMI

Answers

the answer is A. loan payments on a small business loan

Answer:

A. Loan payments on a small business loan

Explanation:

One cost of starting your own business is loan payments on a small business loan.

what challenges do you think will face in the future regarding customer loyalty? how must it apply core competencies to remain successful?

Answers

You gain a customer's loyalty by consistently delivering value, engagement, and attention. The activities that genuinely draw a consumer who is loyal, however, don't always match up with what marketers feel it takes to foster loyalty.

It's easy for marketers to get caught up in the brand's excitement and narrative. Making others feel important and dedicated to your values is unquestionably a great method for lighting that initial flame. Loyalty is eventually drawn to consistency and ease, though.

In 2008, John Gattorna conducted a poll that found that 68% of consumers were inclined to leave a company because of their "perceived indifference." How can companies provide their customers with a trustworthy, easy experience that makes them feel valued?

Where a business struggles with client loyalty is in its ability to consistently and excellently adapt the consumer experience. This has frequently been a problem since personalization wasn't a scalable concept.

learn more about customer's loyalty here

https://brainly.com/question/30160571

#SPJ4

What is entrepreneur?

Answers

Answer:

someone who is willing to take the necessary risk and uncertainties associated with setting up and managing a business or enterprise

Answer:

Someone who has they're own business. For example, my dad, he made a small company after he left the military called Triple L and he does different things like land work

Explanation:

paolo wrote a draft of the report ___ then a team member proofread it for him.
a) and,
b) , and
c) and

Answers

The correct comma placement in the sentence "Paolo wrote a draft of the report ___ then a team member proofread it for him," is  ", and". Therefore, the correct option is B.

The correct sentence would read as"Paolo wrote a draft of the report, and then a team member proofread it for him."
The reasoning behind this choice is that the comma is used before the coordinating conjunction "and" to separate two independent clauses.

In this case, "Paolo wrote a draft of the report" and "then a team member proofread it for him" are both independent clauses, so a comma is needed before the conjunction "and" to properly connect them. The use of a comma before the coordinating conjunction "and" is necessary to separate the two independent clauses in the sentence. Without the comma, the sentence would be a run-on.

Therefore, the correct sentence should be "Paolo wrote a draft of the report, and then a team member proofread it for him" which corresponds to option B.

Note: The question is incomplete. The complete question probably is: Choose the correct comma placement in the following sentence. Paolo wrote a draft of the report ___ then a team member proofread it for him. a) and, b) , and c) and.

Learn more about Comma:

https://brainly.com/question/27825454

#SPJ11

Which Diagram best illustrates the effects of economic growth on a business?

Which Diagram best illustrates the effects of economic growth on a business?

Answers

Answer: Economic growth increases Productivity increases

Explanation: I like nachos

if the proposed regional comprehensive economic partnership (rcep) is achieved, it will rival the european union (eu) when measured by the number of countries involved and their combined gross domestic product (gdp). the eu is an example of a(n)

Answers

As per the given statement, the European Union is an example of economic union. Hence, Option C is correct.

What is economic union?

An economic union is an arrangement between two or more countries that permits unrestricted trade in commodities, services, money, and labour. To foster this unified market, the nations may also coordinate their social and financial policies. One illustration of an economic union is the European Union (EU).

When it comes to the number of participating nations and their combined gross domestic product, the proposed Regional Comprehensive Economic Partnership will rival the European Union.

Therefore, Option C is correct.

Learn more about economic union from here:

https://brainly.com/question/9900428

#SPJ1

The complete question has been attached in text form:

If the proposed Regional Comprehensive Economic Partnership (RCEP) is achieved, it will rival the European Union (EU) when measured by the number of countries involved and their combined gross domestic product (GDP). The EU is an example of a(n)

A.) CUSTOM UNIONS

B.) FREE TRADE AREA

C.) ECONOMIC UNION

D.) POLITICAL UNION

E.) COMMON MARKET

Does the Federal Reserve pay taxes?

Answers

Answer:

Federal Reserve banks are exempt from paying taxes at the federal, state and local levels, except on real estate holdings. This is because of rules on taxation set forth in Section 7(c) of the Federal Reserve Act.

Explanation:

S&L members do not have voting rights true or false

Answers

S&L members do not have voting rights is a false statement.

Who are Savings and loan association?

A savings and loan association (S&L), or thrift institution, exists as a financial organization that specializes in accepting savings deposits and creating mortgages and other loans.

S&Ls place a stronger focus on residential mortgages, whereas commercial banks tend to focus on working with large companies and on unsecured credit services (such as credit cards). Commercial banks can be chartered at either the condition or federal level. The same stands true for S&Ls.

The terms "S&L" or "thrift" are primarily utilized in the United States; equivalent institutions in the United Kingdom, Ireland, and some Commonwealth countries contain building societies and trustee savings banks. They exist often mutually owned (often named mutual savings banks), indicating that the depositors and borrowers exist as members with voting rights, and can direct the financial and managerial purposes of the association like the members of a credit union or the policyholders of a mutual insurance company.

While it exists possible for an S&L to be a joint-stock company, and even publicly traded, in such instances, it exists no longer a mutual association, and depositors and borrowers no longer maintain membership rights and managerial authority. By law, thrifts can have no more than 20 percent of their lending in commercial loans—their emphasis on the mortgage and consumer loans creates them specifically vulnerable to housing downturns such as the deep one the U.S. experienced in 2007.

Hence, S&L members do not have voting rights is a false statement.

To learn more about Savings and loan association refer to:

https://brainly.com/question/12595025

#SPJ9

Net Purchases + Purchases Returns and Allowances + Purchase Discounts equals:
O A. Gross Profit.
OB. Gross Purchases.
O C. Net Income.
OD. Net Loss.

Answers

Answer:

OB. Gross Purchases.

Explanation:

Gross purchases represent all the purchases a business made in a particular period. It includes returns outwards ( purchases returns),  discounts and allowances received.

Net purchases are calculated by subtracting purchase returns, discounts received, and allowances from gross purchases.

Therefore, Net Purchases + Purchases Returns and Allowances + Purchase Discounts= gross purchases.

what is a business plan

Answers

Answer:

a document setting out a business's future objectives and strategies for achieving them

Explanation:

Should copyright laws still be around and protected?

Answers

Answer: yes

Explanation: people can make money off stealing other peoples stuff for eg music etc…

Have a clearance of how many inches in the left side of a vehicle

Answers

5-9 inches is optimal for most cars and trucks

High-profile accounting scandals and the global financial crisis are examples of ___.

Answers

High-profile accounting scandals and the global financial crisis are examples of companies and industries that did not conform to business ethics.

What is business ethics?

The rules for ethically correct and wrong behavior in company are referred to as business ethics. However, "legal" and "ethical" are not always identical. Law in part defines behavior. By defining permissible practices outside of the purview of the state, business ethics strengthen the law.

What is the business ethics tenet?

The field includes loyalty, fairness, respect, trustworthiness, and technological ethics. It also includes corporate responsibility, personal responsibility, and social responsibility. It places a strong emphasis on employee retention, brand image, and consumer loyalty.

How can business ethics be improved?

Engage, talk to, and educate your staff. Utilize effective and educational communication to involve employees as well as other stakeholders, including suppliers, investors, regulators, and customer groups. An ethical culture will be ingrained thanks to effective, consistent, and regular communication and training.

Learn more about business ethics: https://brainly.com/question/14971689

#SPJ4

Which of the following is an example of promotion?
A The quality of a product
B. The price of a product
C. An advertisement
D. An employee who works for your company

Answers

Answer:

A. An advertisement

Explanation:

Answer:

it is c

Explanation:

on edg 2021

Steven smith paid his ex-wife alimony of $22,000 in 2021. his marriage settlement agreement was signed on february 1, 2019. how are his alimony payments reported on his federal return?

Answers

Alimony payments are never deductible and are no longer included on the federal return.

The Internal Revenue Service (IRS) imposes a tax on the yearly income of people, businesses, trusts, and other legal organisations. This tax is known as the federal income tax in the United States. All sources of income, including wages, salaries, commissions, bonuses, gratuities, investment income, and other forms of unearned income, that are included in a taxpayer's taxable income federal return are subject to federal income taxes. Federal income tax rates for individuals are progressive in the United States, which means that they rise in proportion to an individual's taxable income. There are several income levels at which the federal income tax rates, which vary from 10% to 37%, take effect. Tax brackets are the different income levels that the rates apply to. Each tax bracket has its own rate of taxation, which is applied to income that falls inside it.

learn more about federal return here

https://brainly.com/question/17088488

#SPJ4

You make an initial deposit of $46.82 into your checking account. A week later you deposit your paycheck of $78.36. You write checks for $16.93, $26.25 and use your debit card to purchase items totaling $9.27 and $6.95. How much money do you have in your account now? *

Answers

Answer:

$65.78

Explanation:

The deposits to the accounts are

initial deposit   $46.82

paycheck   $78.36

Total deposits = $125.18

Withdrawals

checks    $16.93,

   $26.25

purchases    $9.27

    $6.95.

   $59.4

Balance will be $125.18- $59.4

=$65.78

what are rock layers​

Answers

Answer:

the answer is isStratum

3.
How is net profit determined ?
han

Answers

Answer:

Net profit: Calculate the net profit (aka net income) by subtracting total expenses from total revenue to see exactly how much a company profits (a new profit) or loses (a net loss). A company's net income over time is a great indicator of how well or poorly its management team runs the company.

Explanation:

hope it is helpful for you

have nice day

An investor thought that market interest rates were going to decline. He paid $19,000 fora corporate bond with a face value of $20,000. The bond has an interest rate of 10% per year payable annually. If the investor plans to sell the bond immediately after receiving the 4th interest payment, how much will he have to receive (sell it for) in order to make a return of 14% per year?

Answers

Answer:

$22,251

Explanation:

Coupon rate = $2,000

Now, we calculate the seired sale price of the bonds:

19,000 = 2,000[P/A, 14%, 4] + S[P/F. 14%, 4]

19,000 = 2,000(2.9137) + S(0.592)

S = (19,000 - 5,827.4) / 0.592

S = 22251.01351351351

S = $22,251

So, he have to receive $22,251.

1. Give one example of professional behavior in a salon and how a cosmetologist could
demonstrate it."

Answers

Answer:

Appropriate language, a cosmetologist can demonstrate this by always speaking in a tone and at a volume that is appropriate for the setting, and never using foul language no matter what.

Which best describes a way people can use personal loans? to buy a house to buy a bicycle to pay for college to pay for groceries

Answers

Answer:

c. to pay for college

Explanation:

just took the test

Answer:

C. to pay for college

Explanation:

I have some questions, here they are:

1. Should I tell my parents I'm adopted?

2. Does it take 18 months for twins to be born? Or 9?

3. If I eat myself will I get twice as big or disappear completely?

4.How am I sure I’m the real mom of my kid?

5.How far of a drive is it from Miami to Florida?

6.Why doesn’t the Earth fall down?

7.Is an egg a fruit or a vegetable?

8.If batman parents are died, then how was he born?

please answer these I really need to know

Answers

Answer: 1. You wouldn’t know that your adopted unless someone told you

2.9

3. Die and disappear

4. DNA test

5. Your in Florida

6. Gravitational cling

7. Neither

8. They died after he was born

Explanation:

In computing the GDP, why is it import spending subtracted from the sum of consumption, investment, government purchases and export spending?
-Economics

Answers

Import spending is subtracted from the sum of consumption, investment, government purchases and export spending in the calculation of GDP because import represents spending on goods and services that are not produced in that economy.

Gross domestic product is the total sum of goods and services produced in a particular economy in a given period. One of the ways that can be used to determine the value of GDP is the expenditure approach.

The expenditure approach to determine GDP = Consumption + investment + government purchases + ( export - import).

To learn more, please check: https://brainly.com/question/14579149

Frank is already taking advantage of his employer benefit package but wants to find
options to save for retirement that offer tax incentives. Which of the following should
Frank explore?
A. Contribution matching
B. Lower interest
C. Opt in or opt out
D. Roth IRA

Answers

I am sure that it’s D. Roth IRA
Other Questions
_____+29 4 = 16Fill in the blank, Please A survey was given where students in a class were asked to state their eye color. What is the level of measurement of thedata?Select the correct answer below:nominalordinalintervalratio In the context of the vertical structure of a firm, a wide span of control builds a __________ organization with few reporting levels.A. FlatB. CentralizedC. TallD. BureaucraticE. Formal In the genetic cross in between two F1 hybrid pea plants for spherical seeds will yield what percent spherical sedded plants in the f2 generation? HELP ASAP EASY5x4^0 The table shows the cost of hiring a plumber for the first 3 hours of a job.Which graph the points in this table? The perceived value of benefits rises when employers introduce choice through a flexible benefits package. True/False Click to review the online content. Then answer the question(s) below, using complete sentences. Scroll down to view additional questions.Online Content: Site 1Fitness LogWhat steps can you take in your everyday life to properly care for your skeletal system? (Site 1) A man is found murdered in his prison cell. The suspects are other prisoners with the prisoner numbers, 56, 49, 37, and 22. The only clues are circles drawn by the victim on a calendar in his cell. The months April, September, March, October, November, and December were circled. Who is the murderer and what is his name? Which one of the following statements about human mitochondria is true?A.Mitochondrial genes are inherited from both maternal and paternal sourcesB.rRNA and tRNA are imported from the cytoplasm and used in mitochondrial protein synthesisC.About 900 mitochondrial proteins are encoded by nuclear genesD.The mitochondrial genome codes for all proteins found in mitochondria If you could change one rule that your family has, what would you change?This is for English. Tyquan uses the greatest common factor and the distributive property to rewrite this sum:75 + 60What expression does Tyquan write?5(15 + 12)3(25 + 20)25(3 + 60)15(5 + 4) how does the dns solve the problem of translating domain names like example.com into ip addresses? this is science but can someone pls help me ill give brainliest PLEASEEEE 10 points Isometric exercises are recommended for an older person or those with high blood pressure, since they involve no heavy lifting.True or False? Write the domain as an inequality. Write the range as an inequality Each month, Kim donates the same amount of money to a charity. If she donates $1,800 in one year, how much does she donate each month? which of the following statements are true of an event listener's callback function? (select all that apply) A.It will be called every time the event listener is triggered B.Idon't know It must always define a parameter for the event object C.It must be passed to the event listener as the second argument D.It can be either an anonymous or a named function If f(x) = 2x 6 and g(x) = x 2^2, find each value.g(3) + 13 a.3 b.8 c.2 d.8