What earned value management (EVM) variable captures cost variance?

Answers

Answer 1

Answer:

The cost variance is captured by the EVM variable known as CV, which measures the difference between the earned value and actual cost of work performed. This variable is a key indicator of project performance and can help identify areas where corrective action may be needed to keep the project on track.

Explanation:


Related Questions

Is the array parameter to your getaline method in hw2 an input or an output parameter or both?

Answers

In the context of the getaline method in hw2, the array parameter is an input parameter.

An input parameter is a value passed to a method or function that is used by the method to perform a computation. In this case, the array parameter is used by the getaline method to read a line of input from the user and store it in the array. However, it is important to note that the output of the getaline method is also stored in the array parameter. In other words, the array parameter is both an input and output parameter. After the getaline method is called, the array parameter will contain the user's input, which can then be used by the program in further computations.

It is common for parameters to serve as both input and output parameters in programming. This allows methods to modify the values of variables outside of their own scope, which can be useful in many different applications. In the case of the getaline method, the use of an input/output parameter allows the method to read user input and store it in a variable accessible to the rest of the program.

Learn more about array here: https://brainly.com/question/14375939

#SPJ11

OkkKkkkkkEYEYYEYEYEY BYEYYEYEYEyeeyeyyeEYEy if you know you know

Answers

Answer:

okkkkkkkkkkeyyyyyyy

Explanation:

byeeeee

Given the following AHDL code, explain how this code "debounces" a pushbutton. If a key is pressed, input key_pressed is high; if no key is pressed, key_pressed is low. What happens when the key is not pressed? What happens when the key is pressed? Refer to parts of the code and be specific in your answer. SUBDESIGN debounce { clk, key_pressed: INPUT; strobe: OUTPUT; count [6..0]: DFF; count [].clk = clk; count [].clrn = key_pressed; IF (count [].q <= 126) & key_pressed THEN count [].d = count [].q+1; IF count [].q == 126 THEN strobe VCC; = ELSE strobe = GND; END IF; } VARIABLE BEGIN END;

Answers

When the key is not pressed, the code keeps the debounce counter in a reset state. When the key is pressed, the code increments the counter and checks if the debounce process is complete. Once the debounce process is complete, the strobe signal is set high to indicate a valid key press, otherwise, it remains low. This debounce mechanism helps in eliminating or reducing the effects of any noise or rapid transitions in the pushbutton input, ensuring accurate and reliable detection of key presses.

The given AHDL code implements a debounce mechanism for a pushbutton input. Debouncing is a technique used to eliminate or reduce the effect of rapid transitions or noise in the input signal when a pushbutton is pressed or released. It ensures that the output reflects the stable state of the input after it has settled.

The code defines a subdesign called "debounce" which takes the clock signal (clk) and the input signal from the pushbutton (key_pressed). It also has an output signal called "strobe" and a 7-bit register called "count" which serves as a debounce counter.

When the key is not pressed, the input signal key_pressed is low, which means the pushbutton is in an idle or released state. In this case, the code sets the clear input (clrn) of the count register to key_pressed, which clears the counter and keeps it in a reset state.

When the key is pressed, the input signal key_pressed becomes high. The code then increments the value stored in the count register by 1. The condition `IF (count[].q <= 126) & key_pressed` checks if the count value is less than or equal to 126 (indicating that the debounce process is ongoing) and if the key is still pressed. If this condition is true, the code assigns `count[].d = count[].q+1` to increment the count value by 1.

If the count value reaches 126 (indicating that the debounce process is complete), the code sets the strobe signal to VCC (high) to indicate a stable and valid key press. Otherwise, when the count value is less than 126, the strobe signal is set to GND (low) to indicate that the debounce process is still ongoing and the key press is not yet considered stable.

In summary, when the key is not pressed, the code keeps the debounce counter in a reset state. When the key is pressed, the code increments the counter and checks if the debounce process is complete. Once the debounce process is complete, the strobe signal is set high to indicate a valid key press, otherwise, it remains low. This debounce mechanism helps in eliminating or reducing the effects of any noise or rapid transitions in the pushbutton input, ensuring accurate and reliable detection of key presses.

Learn more about Output here,

https://brainly.com/question/27646651

#SPJ11

how many tor relays are being operated by mit?

Answers

An exact number cannot be provided. However, these relays are operated by individuals or organizations who want to contribute to the network's privacy and anonymity features.

However, it is worth noting that Tor relays are nodes that volunteer to pass on traffic for the Tor network. These relays are operated by individuals or organizations who want to contribute to the network's privacy and anonymity features. Tor relays help to make it more difficult for anyone to trace the origin or destination of internet traffic, as well as prevent internet censorship and surveillance.

It is also worth mentioning that the number of Tor relays fluctuates constantly as new nodes are added and others are removed. The Tor network relies on a decentralized network of volunteers to operate these relays, which means that there is no central authority that can provide an exact number of relays being operated at any given time. In summary, while I cannot provide an exact number of Tor relays being operated by MIT, it is important to recognize the importance of these relays in the Tor network's operation and how they contribute to privacy and security online.

Learn more about network here: https://brainly.com/question/13105401

#SPJ11

Which statement describes one of the responsibilities of a computer programmer?

A.
providing remote technical support to users
B.
installing, configuring, and monitoring network systems
C.
using computer-generated software to create special effects
D.
using coding languages to create software for retrieving data
E.
designing and implementing databases

Answers

Answer:

d i think

Explanation:

Create a foreign agent advertisement message using 1672 as the sequence number and a lifetime of 4 h. Select your own values for the bits in the code field. Use at least three care-of addresses of your choice. Calculate and insert the value for the length field.

Answers

Foreign Agent Advertisement message using the provided parameters:

- Sequence Number: 1672
- Lifetime: 4 hours (14400 seconds)
- Code Field: (Assuming: R = 0, B = 1, H = 1, F = 0, M = 1, G = 0, V = 0, T = 0) = 01001000
- Care-of Addresses: 192.168.1.1, 192.168.2.1, 192.168.3.1

To calculate the length field, we must consider the base header size and the additional size added by the care-of addresses. The base header size is 12 bytes (1 byte for Type, 1 byte for Length, 2 bytes for Sequence Number, 2 bytes for Lifetime, 2 bytes for Registration Lifetime, and 4 bytes for each care-of address). Since there are three care-of addresses, this will add an additional 3 x 4 = 12 bytes. Therefore, the total length will be 12 + 12 = 24 bytes.

Foreign Agent Advertisement message:
- Type: 2 (Foreign Agent Advertisement)
- Length: 24 bytes
- Sequence Number: 1672
- Lifetime: 14400 seconds
- Code Field: 01001000
- Care-of Addresses: 192.168.1.1, 192.168.2.1, 192.168.3.1

To know more about Foreign Agent Advertisement visit:-

https://brainly.com/question/30727249

#SPJ11

What are your strongest competencies? What will you do them?
❌NONSENSE ANSWER

Answers

Answer:

1. Teamwork

2. Responsibility

3. Commercial Awareness

4. Decision Making

5. Communication

6. Leadership

7. Trustworthiness & Ethics

8. Results Orientation

9. Problem Solving

10. Organisational skills

The ice starts on most hybrid electric vehicles when the state-of-charge of the hv battery drops to:
a. 40%
b. 50%
c. 60%
d. 70%

Answers

b. 50%


Hybrid Electric
Vehicles (HEVs) and Electric Vehicles (EVs) rely on batteries to power the 12-volt electrical system. Rather than using the High Voltage (HV) battery to power these accessories, the auxiliary battery enables systems that require a constant voltage supply to remain operational.        

Important Plug-In Hybrid Electric Car Charge Port Components:

DC-to-DC converter.Electric generator powered by a battery.Traction motor powered by electricity.The exhaust system.Fuel dispenserTank of gasoline:Engine with internal combustionIntegrated chargerController for power electronics:Controller for power electronics:   Thermoelectric system (cooling)Battery pack for traction:
             
Transmission: The transmission is responsible for transferring mechanical power from the engine and/or electric traction motor to the wheels.  

To learn more about hybrid electric vehicles, click here
https://brainly.com/question/8971780
#SPJ4
       


Select the correct navigational path to create a PivotTable.
Select the range of cells.

Click the
tab on the ribbon and look in the
group.

Select the PivotTable option, make adjustments as needed, and click OK.

Answers

Answer:

insert and tables

Explanation:

took the test on edge

The correct navigational path for making a Pivot Table would be:

- Insert and Tables.

The appropriate way for creating a pivot table begins with a click made on the range table. This step is followed by moving to the insert option which will include the option of create. This create option would include selection of range and name of the table that is opted.

Thus, 'insert and tables' is the correct answer.

Learn more about "PivotTable" here:

brainly.com/question/18907447

Which of the below would provide information using data-collection technology?

Buying a new shirt on an e-commerce site
Visiting a local art museum
Attending your friend's baseball game
Taking photos for the school's yearbook

Answers

The following statement would provide the information by utilising data-collection technology: Buying a new shirt on an e-commerce site.

What is data collection?
The process of obtaining and analysing data on certain variables in an established system is known as data collection or data gathering. This procedure allows one to analyse outcomes and provide answers to pertinent queries. In all academic disciplines, including the physical and social sciences, the humanities, and business, data collecting is a necessary component of research. Although techniques differ depending on the profession, the importance of ensuring accurate and truthful collection does not change. All data gathering efforts should aim to gather high-caliber information that will enable analysis to result in the creation of arguments that are believable and convincing in response to the issues that have been addressed. When conducting a census, data collection and validation takes four processes, while sampling requires seven steps.

To learn more about data collection
https://brainly.com/question/25836560
#SPJ13

what is WiFi and MIFI in full​

Answers

MiFi is a brand name used to describe a wireless router that acts as mobile Wi-Fi hotspot. ... Novatel Wireless has never offered an official explanation for the origin of the name "MiFi"; it is believed to be short for "My Wi-Fi".

Answer:

Explanation:

WiFi ----- Wireless Fidelity

Mifi ------ My WiFi or Mobile WiFi

Hope this helps

plz mark as brainliest!!!!!!

Which statement will result in a compile-time error?

A. System.out.println(2/0*0);
B. System.out.println(2/0);
C. System.out.println(2+5);
D. System.out.println(0/0);

Answers

Answer:

A. System. out. println(2/0*0);

hope it help

please mark as brainliest

explain the core functions of a computer​

Answers

Answer:

There are four predominant functions of a computer. Inputting data and or instructions, processing, output, or grabbing data and or information, storing data and or information.

hope this helps :D

+10 points~~~Which option is used in emails to inform the recipient that they should exercise discretion in accordance with sharing the content of the message?

priority levels
sensitivity levels
follow-up flags
attachment icons

Answers

Answer:

Sensitivity Levels

Explanation:

Sensitivity Level is option use in email to inform the recipient that they should exercise discretion in accordance with sharing the content of the message.

Answer:

its sensitivity levels on edge 2020

Explanation:

Which specialized administrator would be responsible for the design, development, and support of DBMSs?
1. web administrator
2. security administrator
3. database administrator
4. system administrator

Answers

The specialized administrator responsible for the design, development, and support of DBMSs is the database administrator. Option 3 is the correct answer.

A database administrator (DBA) is responsible for managing and maintaining the database management systems (DBMSs) used in an organization. They play a crucial role in the design, development, and support of databases. DBAs handle tasks such as database design, data modeling, performance tuning, security management, backup and recovery, and ensuring data integrity. They work closely with developers, system administrators, and other stakeholders to ensure efficient and effective database operations.

Option 3 is the correct answer.

You can learn more about DBMSs at

https://brainly.com/question/13485235

#SPJ11

Which of the following actions is most likely to raise legal or ethical concerns?

Answers

Answer:

arson, kidnapping, gun fighting

Explanation:

Which of the following is a country that cruise ships commonly sail under the flag of?
O United States
O Canada
O Panama
O South Africa
< Previous

Answers

Answer:

Panama

hope this helps!

2 points
1. Which characters are normally used to represent the root of the Floppy
disk drive? *
a) C1
b) A:
c) B:
d) D:
points

Answers

Answer:

B) A:

Explanation:

Formatting codes can be added to documents using a(n)_____, such as slashes // and angle brackets < >.

Answers

Using a delimiter like slashes or angle brackets, formatting codes can be applied to documents.

What are boundaries and shading mean?

Word documents often utilize borders and shading to highlight specific passages of text and make them the reader's initial impression.

We can use Borders and Shading in MS Word to make written text, paragraphs, and other elements appear lovely and attractive.

Formatting codes can be used to apply formatting to documents using a delimiter like slashes or angle brackets.

In order to add formatting codes to documents, a delimiter like slashes or angle brackets can be used.

The complete question is:

Formatting codes can be added to documents using a ___ such as slashes and angle brackets

Learn more about the borders and Shading here:

https://brainly.com/question/1553849?

#SPJ1

UTP is a ________. Group of answer choices type of translation network interface card type of wiring type of router

Answers

UTP is a type of wiring.UTP refers to unshielded twisted pair and is a type of wiring.UTP (Unshielded Twisted Pair) is a type of cabling made up of pairs of twisted wires that are not shielded.

It is often used in Ethernet networks and is regarded as the most common type of networking cable. It is capable of transmitting both data and voice messages.UTP cabling is classified into different categories, with Cat 5, Cat 5e, and Cat 6 being the most common. This refers to the quality of the cable and its ability to carry data.UTP cabling is also advantageous in that it is inexpensive, easy to install, and has a high level of performance.

It is often used in small and medium-sized businesses' LANs because it is both cost-effective and dependable.UTP cabling is ideal for network connections because it allows for reliable data transmission with minimal interference. It also has a lower probability of being affected by electromagnetic interference (EMI) and radio frequency interference (RFI) because it is not shielded.

Learn more about Cabling here,List some of the key benefits of a structured cabling plan.

https://brainly.com/question/29235583

#SPJ11

Unit 4: Lesson 2 - Coding Activity 1
Ask the user for two numbers. Print only the even numbers between them. You should also print the two numbers if they are even.

Starter code:
import java.util.Scanner;

public class U4_L2_Activity_One{
public static void main(String[] args){

Scanner scan = new
Scanner(System.in);
System.out.println("Enter two numbers:");
int num1 = scan.nextlnt();
int num2 = scan.nextlnt();
while (num1 <= num2){
if (num1 %2==0){
system.out.print(num1="");
}
num+=1;
}
}
}

Answers

The program illustrates the use of loops.

Loops are used to perform repetitive and iterative operations.

Aside few errors that can easily be corrected, the starter code you added to the question is not totally incorrect.

So, the corrected code is:

import java.util.Scanner;

public class U4_L2_Activity_One{

   public static void main(String[] args){

       Scanner scan = new Scanner(System.in);

       System.out.println("Enter two numbers:");

       int num1 = scan.nextInt();

       int num2 = scan.nextInt();

       while (num1 <= num2){

           if (num1 %2==0){

               System.out.print(num1+" ");

           }

           num1+=1;

       }

}

}

The above program is the same as the starter code, you included.

I only made corrections to lines 6, 7, 9, 10 and 15

Read more about similar programs at:

https://brainly.com/question/19270993

Presentation slides should not have more than _____ bullet points.

Answers

Answer:

The answer is four

Explanation:

don't use more than four bullet points on any slide and will avoid using single bullet points on a slide.

What type of access controls allow the owner of a file to grant other users access to it using an access control list

Answers

Answer:

Discretionary Access Control

Explanation:

The type of access controls allow the owner of a file to grant other users access to it using an access control list is Discretionary Access control.

What is discretionary access control?

This is known to be a type of control that gives one a specific amount of access control to the use of the object's owner, or any other person.

Note that The type of access controls allow the owner of a file to grant other users access to it using an access control list is Discretionary Access control as it only gives a little access.

Learn more about Discretionary Access from

https://brainly.com/question/20038736

#SPJ2

What is the HTML code symbol to the !nstagram Facts Part 2?

FIRST ONE GETS BRAINEST!!

What is the HTML code symbol to the !nstagram Facts Part 2?FIRST ONE GETS BRAINEST!!

Answers

¶^↑↓→← html code symbol

For context-free grammar G4, E + E +T|T T → TxFF F → (E)|a Give BOTH parse trees and derivations for each string: a. a b. αXαXα +α C. a + a d. ((a))

Answers

The parse tree and leftmost derivation for each of the given statements. Here are the explanations for each:

a. A = (A + B) + C

Parse tree:

    A

    |

   "="

    |

   "+"--C

   |

  "("

   |

   "+"

  /   \

 A     B

Leftmost derivation:

A -> "=" -> "+" -> (A + B) + C

b. A = B + C + A

Parse tree:

    A

    |

   "="

    |

   "+"

  /   \

 "+"   A

/   \

B     C

Leftmost derivation:

A -> "=" -> "+" -> B + C + A

c. A = A*(B + C)

Parse tree:

    A

    |

   "="

    |

   "*"

  /   \

 A     "+"

      /   \

     B     C

Leftmost derivation:

A -> "=" -> "*" -> A*(B + C)

d. A = B * (C + (A + B))

Parse tree:

    A

    |

   "="

    |

   "*"

  /   \

 B     "+"

      /   \

     C     "("

           |

           "+"

          /   \

         A     B

Leftmost derivation:

A -> "=" -> "*" -> B * (C + (A + B))

To know more about parse tree visit :

brainly.com/question/12975724

#SPJ4

Give 3 reasons why it is believed that smart phones precent us from communicating face to face.give three reasons why it is believed that smartphones prevent us from communicating face to face ​

Answers

Answer:

yes

Explanation:

because the people will be lazy to go and talk to that person instead They will call each other and discuss

which camera effect is used to shoot tall buildings from close by without distortion

Answers

Answer:

the answer is ligma

Explanation:

Answer:

Tilt-shift lenses are a popular type of architecture photography lens

Explanation:

hope it helps

mark me brainliest

In binary signaling, there is (are) ________ state(s). A. two B. between three and ten C. one D. an infinite number of

Answers

Your answer is letter A. 2.

Explanation: I have personal experience.

what is the extension of a Microsoft access database 2013​

Answers

Answer:

Access Database (2007, 2010, 2013, 2016)..accdb

Answer:

.accdb

Explanation:

.accdb is the extension of Microsoft Access Database 2013

unable to establish secure connection to zoom, what can do for case

Answers

Explanation:

1. check router

2.check app.

2.check subscription availability

Answer:

1. check router

2.check app.

2.check subscription availability

Other Questions
Which of the following commands would you use to quickly identify live targets on a subnet? (Choose all that apply)A. nmap -A 172.17.24.17B. nmap -O 172.17.24.0/24C. nmap -sn 172.17.24.0/24D. namp -PI 172.17.24.0/24 Sallys budget for food is 1/8 of her yearly salary. Sallys total food bill for the year is $12,5000. Whats Sallys yearly salary? Are the steps of enzyme action in correct order? In our brains, we try to have abalance between what two things?A. stimulation and incitationB. deprivation and depressionC. excitation and inhibition Question #5Multiple ChoiceWhat is the contrast ratio of blue-60 text on a yellow-30 background?3 to 10 60 to 130 to 1 i need help acellus......................... While discussing PCV valve operation: Technician A says that the PCV valve opening is decreased at part-throttle operation compared to idle operation. Technician B says that the PCV valve opening is decreased at wide-open throttle compared to part throttle. Who is correct? Discuss what part of the power of grit has led to success in your life to date. In what ways did the values of social responsibility and personal responsibility guide Elias Hill? The Klan? Which part of a flower develops into a fruit?A. SepalsB. Pollen tubeC. AnthersD. StigmaE. Ovary Which legal systems do you think were most beneficial to the leaders of these societies? Refer to Where Is Niagara Falls? for a complete version of this text. Read the main ideas and details from Chapter 6. Select Main Idea 1 or Main idea 2 to classify each supporting detail. Can you find the cost for 9 tickets A market penetration strategy involves seeking growth in current markets with current products or services. True False Most organizations find that assessing their is easier than assessing their strengths; weaknesses o weaknesses; strengths O opportunities; threats threats: opportunities Alternative solutions range from the known and well defined to the untried and ambiguous. True False The application of knowledge management has three natural targets: an organization's teams, customers, and workforce True False How were feudalism and the manor system related question 16 options: feudalism involved only war, while the manor system involved farming. feudalism applied only to lords, while the manor system involved the pope. the laws of feudalism were set by the king, and the laws of the manor were set by the church. feudalism was a social order, and the manor system was the economic arrangement that supported it. which of the following statements regarding metabolism is false? group of answer choices adp is formed in anabolic reactions. anabolic reactions are degradative. heat may be released in both anabolic and catabolic reactions. atp is formed in catabolic reactions. when using the hanging method for shell construction, when the shell is flipped are the loads pre- sent in it tensile or compressive? Abdul's average speed is 30 mph in heavy traffic, and his average speed is 60 mph in light traffic. If he was in heavy traffic for 1 hour and light traffic for 3 hours, how far did Abdul travel? A. 48 miles B. 210 miles C. 90 miles D. 270 miles What happens in chapter 5 of Tom Sawyer? What is the ending of Everyday Use by Alice Walker?