There are four activities on the critical path, and they have standard deviation of 1, 2, 4, and 2. What is the critical path's standard deviation?
a. 3
b. 9
c. 4
d. 25
e. 5

Answers

Answer 1

Important critical path the important activities of a project are those that have zero float, which means that any delay in completion delays the project as a whole.

The critical path, on the other hand, plots the lengthiest route across all crucial tasks in a project from beginning to end. The project's completion will be delayed by the same amount if any task on the crucial path is postponed. It is the route with the longest overall length. The longest series of tasks that must be completed on schedule for the project to be concluded is known as a critical path in project management. The rest of the project will be delayed if important activities are delayed. The series of project network operations that together make up the critical longest total time, whether or not that longest total length includes float. This establishes the quickest timeframe for the project's completion. The crucial path (or paths) is the longest path from Start to Finish in terms of time; it shows the shortest amount of time required to finish the full project.

Learn more about critical path here :

https://brainly.com/question/19052423

#SPJ4


Related Questions

Which of these words is spelled correctly?

source

soarce

entittled

intitled

Answers

Answer:

Source will be the one that is spelled correctly.

Explanation:

The other answers aren't humorous.

Answer:

source is spelled correctly.

Explanation:

its right

lark and louise have had difficulties conceiving a child. they have experienced multiple miscarriages. they have also tried in vitro fertilization in order to have a baby. they have gone to genetic counseling and undergone many tests to get to the bottom of their fertility issues. it has been determined that it would be very difficult and expensive for louise to conceive a child and carry it to term. which of these may be the best option for them?

Answers

The best option for Clark and Louise to have a baby is adoption.

Through the process of adoption, a person takes over the parental responsibilities of another, typically a kid, from that person's biological or legal parent or parents. Legal adoptions transfer all rights, obligations, and filiation from the biological parents to the adoptive parents forever. Adoption, as opposed to guardianship or other institutions created for the care of the young, aims to bring about a permanent change in status and as such needs society acknowledgment, either through legal or religious permission. In the past, certain civilizations have passed laws specifically controlling adoption, while others have used less official methods, most notably contracts that set forth inheritance rights and parental responsibilities without a corresponding transfer of filiation. The 20th century saw the emergence of modern adoption systems, which are typically governed by extensive laws and rules.

To learn more about adoption click here

brainly.com/question/28098524

#SPJ4

Question

Clark and Louise have had difficulties conceiving a child. They have experienced multiple miscarriages. They have also tried in vitro fertilization in order to have a baby. They have gone to genetic counseling and undergone many tests to get to the bottom of their fertility issues. It has been determined that it would be very difficult and expensive for Louise to conceive a child and carry it to term. Which of these may be the best option for them?

Which of these best describes the attack on Pearl Harbor?
a false alarm

B
an ineffective strike

C
a catastrophic ambush

D
a setback to America’s war efforts

Answers

Answer:

C

Explanation:

Which of these best describes the attack on Pearl Harbor? a false alarmBan ineffective strikeCa catastrophic

How did the Nomadic people find food?

Question 1 options:

A)They farmed different areas.


B) The raised animals.


C) They hunted, gathered, and moved from place to place following animals and searching for water.


D) They settled and found food in the northeast rain forests.

Answers

Answer:

The answer is C) They hunted, gathered, and moved from place to place following animals and searching for water.

Explanation:

Nomadic people relied on hunting and gathering for their food needs. They would move from place to place in search of animals to hunt and edible plants to gather. This lifestyle required them to be mobile and adaptable to changing environmental conditions, and they would often follow animal herds or seasonal migration patterns to ensure a steady food supply.

HELP PLEASEEEEE ASAP!!

HELP PLEASEEEEE ASAP!!

Answers

Answer:

B

Explanation:

Answer is B I got you

What was Rome like when the romans left in 410?

Answers

On August 24, 410, the Visigoths entered Rome through its Salarian Gate, according to some opened by treachery, according to others by want of food, and pillaged the city for three days. ... The city's citizens were devastated. Many Romans were taken captive, including the Emperor's sister, Galla Placidia.

Write a tiny summary about the following internment camps(SEPERATELY) CRYSTAL CITY,DODD FIELD,FORT BLISS,KENEDY, AND SEAGOVILLE. include WHAT CITIES THEY WERE LOCATED NEAR,WHO LIVED THERE,HOW MANY PEOPLE LIVED THERE,and WHAT WERE THE LIVING CONDITIONS

PLEASE FAST ill give brainliest to best answer please hurry

Answers

Answer:

Fort Bliss is an interment camp in Texas and New Mexico, next to El Paso City. It was a place that had a fairly small to medium population; its current population is 12,709. It is a place mainly used for military troops to train. The living conditions at Fort Bliss can be described as a little less desirable as the weather is very hot and dry, and as for housing, it is most desirable for army troops as they are given proper hotels. While for families and others, it is better to live in nearby towns.

Explanation:

I don't know if this is what you wanted but I tried my best lol

Japanese Americans make up around 7,318 of the population of Crystal City, Texas, which is mostly from California. Living quarters were uncomfortable and unpleasant.

The term "internment camps" refers to places or situations where people are held or imprisoned because of their race, ethnicity, religion, or political convictions, frequently against their will.

Dodd Field is a military base in Lubbock, Texas, with a large Japanese American population, predominantly from California. The internees were housed in barracks and tents. Living quarters were uncomfortable and unpleasant.

Learn more about internment camps, here:

https://brainly.com/question/30195793

#SPJ1

briefly discuss the five purposes of assessment and give an example of each while indicating how the particular purpose is served in your example​

Answers

Assessment serves various purposes in educational contexts, and five common purposes are:

Evaluating Learning: Assessments are used to measure students' knowledge, skills, and understanding of a particular subject or topic. For example, a teacher may administer a written test to assess students' understanding of mathematical concepts such as algebraic equations. Promoting Learning: Assessments can be used to promote student learning by providing feedback and identifying areas for improvement. For instance, a teacher might provide formative assessments, such as quizzes or short assignments, to gauge students' understanding throughout a lesson. Guiding Instruction: Assessments can inform instructional decisions by helping teachers identify the most effective teaching strategies and tailor their lessons accordingly.Monitoring Progress: Assessments are used to monitor students' progress over time and track their growth. This purpose involves regular assessments, such as mid-term exams or standardized tests, to measure students' progress toward specific learning goals. Summarizing Achievement: Assessments are used to summarize and report students' overall achievement in a subject or course. For instance, at the end of a grading period, a teacher may administer a comprehensive test that covers multiple topics and skills.

These five purposes of assessment work together to support student learning and inform instructional decisions.

for similar questions on assessment.

https://brainly.com/question/13679533

#SPJ8

Describe Free Enterprise in your own words!

Answers

a financial framework wherein personal business works in rivalry and to a great extent liberated from state control.

Answer:

Free enterprise is a type of economy where products, prices, and services are determined by the market, not the government.

Explanation:

It's capitalism, not communism. Things that are free are unconstrained, and a business is an enterprise.  free enterprise also refers to an economy where businesses are free from government control.

Why might a sociologist look at the amount of fresh fruit and vegetables
available in a neighborhood?
O A. To understand the social issues that affect health
O B. To review the impact of education on lifestyle
O C. To predict the income levels of people
D. To determine if the government should control the economy

Answers

Answer:

A

Explanation:

Because most people suffer from uncertain diseases that they don't know reason being it's important to make sure these resources are available

To understand the social issues that affect health, might a sociologist look at the amount of fresh fruit and vegetables available in a neighborhood. Thus, option (a) is correct.

What is sociologist?

Sociology is the study of social life, social group structure, social group organization, and social group change. Sociologists research how society evolves and operates on both a large and small scale. Sociology is the study of the social life of the society. The sociology are not easy topic to research.

Sociologists can investigate the effects of variables including wealth, race, and geography on access to healthy food because it is a key social predictor of health.

For sociologists researching health and wellbeing, the availability of fresh produce in a community is a key indicator of the social concerns that have an impact on health.

As a result, the significance of the sociologist to look at the amount of fresh fruit and vegetables available in a neighborhood are the aforementioned. Therefore, option (a) is correct.

Learn more about on sociologist, here:

https://brainly.com/question/28499072

#SPJ2

If you called Mao Zedong during the time of the Cultural Revolution, what would his voicemail message say? Create an accurate voicemail message for what Mao Zedong could be doing instead of answering your call. Use information from your notes to help you come up with ideas.

Answers

Answer: Sorry i'm probably discussing some things with the P.R.C, and if you could just leave your name and number I'll get back to you as soon as possible.

Explanation:

4. The main function of the muscular system is-
support of the body
break down of food
movement of the body
removal of waste
Help!!!!

Answers

Answer:

A

Explanation:

took a quiz

actions to take to oppose discrimination at your school and in your community​

Answers

Answer:

You could make an informed pamphlet, make copies, and pass them out. You could also talk to your teachers and principal. Ask them if they will allow you to put together a discussion group for the students. Ask if posters can be hung up in the halls or doors. Ask others to join you. Most importantly, research and be informed on the topic. You can do the same in your community.

Explanation:

Hope this helps

U.S. and Soviet Union competed for world influence?
A: settings B: cold war C: judicial review D : industrial reverlustain

Answers

Answer: B. Cold War

Explanation:

Which lines from the poem provide the clearest evidence for the summary in part a

Answers

Answer:

The poet raises some rhetorical questions regarding a dream that has already been delayed and is yet to come true.

Explanation:

2. In your own words, what is a product market?

Answers

A product market is a market where goods and services are bought and sold. This can include a wide range of products, from basic necessities like food and clothing, to luxury items like cars and jewelry. In a product market, buyers and sellers interact to determine the prices of the products being exchanged, and this market competition helps ensure that prices are fair and reflect the supply and demand for the products being sold. As a student, you may be familiar with product markets through your experiences shopping for goods and services, or through your studies of economics and business.

1. Describe the historical context surrounding the community resistance and how the muralists sought inspiration.








2. Discuss the use of magical realism in Chicano muralism.






3. When is Chicano Park day celebrated, and why is it a big deal to some Chicanos?


4. Elaborate on how you feel about Gentrification. (Please be respectful of others' opinions regarding this sensitive topic. Knowledge comes from patience, and patience brings about understanding.)

Answers

Answer:2 :) i did it alredy

Explanation:

i saw the correct answer already

Exploring the influence of the university of Georgia on the history of Georgia is an example of using the theme

Answers

The University of Georgia's influence on Georgian history is an example of the country's development, as the university was founded in 1785, being the first US university founded by a state government.

How important are universities to a country?

Higher education corresponds to a way of enabling individuals to choose their profession, develop critical and scientific thinking, seeking measures to develop society through innovation, creativity and knowledge.

Therefore, the university of georgia is a landmark in the history of america, as it was the first public college in the country, which established guidelines for the development of public education in the country.

Find out more about University of Georgia here:

https://brainly.com/question/13598536

#SPJ1

11
Select the correct answer.
Which is NOT a factor that affects teenagers' ability to resist peer pressure and stand up for their own values?
A.
B.
C.
O D.
how high or low their self-esteem is
the nature of their family background
the number of friends they have
the role models they look up to
Reset
Next

Answers

The factor that is NOT known to affect teenagers' ability to resist peer pressure and stand up for their own values is Option C. The number of friends they have.

While it is commonly believed that the number of friends a teenager has can influence their ability to resist peer pressure, research suggests otherwise. Instead, the quality of the friendships appears to be more important than the quantity.

A. How high or low their self-esteem is: Self-esteem plays a significant role in resisting peer pressure. Teenagers with higher self-esteem are more likely to have confidence in their own values and are less influenced by the opinions of others.

B. The nature of their family background: Family background can strongly influence a teenager's ability to resist peer pressure. Factors such as parental support, communication, and the presence of strong family values can provide a foundation for teenagers to develop their own values and resist negative peer influence.

D. The role models they look up to Role models have a considerable impact on a teenager's ability to resist peer pressure. Positive role models can provide guidance and inspire teenagers to stand up for their own values, while negative role models can encourage conformity and undermine their ability to resist peer pressure.

In conclusion, while the number of friends a teenager has may be influential in other aspects of their life, it is not a significant factor in their ability to resist peer pressure and stand up for their own values. Instead, factors such as self-esteem, family background, and role models play more significant roles in shaping a teenager's ability to resist negative peer influence. Therefore, the correct option is C.

Know more about Peer pressure here:

https://brainly.com/question/933571

#SPJ8

The question was incomplete, Find the full content below:

11 Select the correct answer.

Which is NOT a factor that affects teenagers' ability to resist peer pressure and stand up for their own values?

A. how high or low their self-esteem is

B. the nature of their family background

C. the number of friends they have

D. the role models they look up to

Why do you think Han Emperor Wudi wants to build connections with the Yuezhi (Kushans) What do you think his plan might be?

Answers

Answer:

The Han Emperor Wudi, who reigned from 141 BCE to 87 BCE, likely wanted to build connections with the Yuezhi (also known as the Kushans) for a number of reasons.

Firstly, the Yuezhi controlled the important trade routes that linked China to Central Asia and the Mediterranean. By building connections with them, Emperor Wudi could have hoped to secure access to these trade routes and the valuable goods that were transported along them, such as silk, horses, and precious metals.

Secondly, the Yuezhi were a powerful nomadic confederation and building connections with them would have provided the Han Empire with a powerful ally in the region, which could have helped to counterbalance the power of other neighboring nomadic groups and protect the empire's northern borders.

Lastly, Emperor Wudi may have been interested in expanding the reach of Chinese culture and influence to the western regions, and building connections with the Yuezhi would have allowed him to do so. The Yuezhi were known to have adopted elements of Chinese culture, such as the use of Chinese script, and this could have served as a way to spread Chinese culture and influence to the Western regions.

Overall, Emperor Wudi's plan might have been to gain access to the important trade routes, secure a powerful ally in the region and expand the reach of Chinese culture and influence to the western regions.

Drag the tiles to the correct boxes to complete the pairs.

1. US Department
of Education

2. local board
of education

1. makes specific decisions such as setting standards
for curriculum
arrowRight

2. makes decisions about general issues such as
identifying educational gaps between states

Answers

US Department of Education - makes decisions about general issues such as identifying educational gaps between states. Local board of education - makes specific decisions such as setting standards for curriculum.

What is the role of local government in education?

By monitoring and managing educational policies and programmes in their respective jurisdictions, local governments play a crucial role in education. The infrastructure of schools, including the buildings, furnishings, and supplies, must be provided and maintained by the local government. They also work to make sure that educational standards are met and that schools have the right mix of qualified teachers. Local governments are also in charge of creating and implementing educational policies and plans that are specifically suited to the requirements of the communities they serve. They make an effort to guarantee that pupils have access to a top-notch education that will equip them for success in their future endeavours. To provide more resources and support for students and educators, local governments may collaborate with other governmental bodies and community organisations.

To Know more about US Government Visit:

brainly.com/question/9557002

#SPJ1


Explain and differentiate between concepts of reflected appraisal and social comparison.

Answers

Answer:

Explanation:

social comparison states that individuals determine their own social and personal worth based on how they stack up against others; reflected appraisal describes a person's perception of how others see and evaluate him or her

Looking at the above image, which type of wave has more energy? How do you know? Which type has less energy? How do you know?

Answers

Answer:

the answer is not what you think but it's also as simple as you think it is!, you can do it I know you are special

whqta is 2+2 raised to the power of 2 then you will multiply it

Answers

The expression "2+2 raised to the power of 2 then multiplied" can be solved using the order of operations. We first solve the exponent and then perform the multiplication. The answer is 12.

The expression "2+2 raised to the power of 2 then multiplied" can be solved by using the order of operations. The order of operations is a set of rules for performing calculations in a specific order.

The order is as follows: Parentheses, Exponents, Multiplication and Division (from left to right), Addition and Subtraction (from left to right).

So, let's solve the given expression step by step: Step 1: First, we have to solve the exponent.2 + 2 raised to the power of 2 = 2 + 4 (2 raised to the power of 2 = 4)Step 2:

Next, we have to multiply 2 + 4 with 2.(2 + 4) x 2 = 6 x 2Step 3: Finally, we have to multiply 6 with 2.6 x 2 = 12Therefore, the result of "2+2 raised to the power of 2 then multiplied" is 12. We can also simplify this expression as follows:(2+2)^2 x 2 = 4^2 x 2 = 16 x 2 = 32

For more such questions on multiplication, click on:

https://brainly.com/question/29793687

#SPJ8

What is my purpose? and who am I?

Answers

Answer:

.Ur purpose is to propose a woman and u r a husband

this is a description of what type of government system? no clear separation of governmental powers, head of government is usually a prime minister, head of state is often a king or queen and examples are the united kingdom, belgium and australia

Answers

The monarchy type of government system has no clear separation of governmental powers, the head of government is usually a prime minister, head of state is often a king or queen examples are the united kingdom.

What is a monarchy called?

A monarchy is a country ruled by a monarch, and a monarchy is the system or form of government that governs it. A king or queen rules over a kingdom or empire as a monarch. A constitution limits the monarch's power in a constitutional monarchy. In an absolute monarchy, however, the monarch has unrestricted power.

The United Kingdom is a constitutional monarchy, which means that the reigning monarch, i.e. the king or queen who is the head of state at any given time, does not make any open political decisions.

Learn more about monarchy here:

https://brainly.com/question/3458331

#SPJ1

The image shows an earthworm. An earthworm has a
digestive tract that moves soil through its body.
Which two types of structures make up the earthworm's digestive tract?
A. Specialized cells
B. Tissues
C. Unicellular organisms
OD. Organ systems

The image shows an earthworm. An earthworm has adigestive tract that moves soil through its body.Which

Answers

Answer:

A. Specialized cells and D. Organ systems

Explanation:

I Think.... I really tried sorry if its wrong

Did some research but couldn't find a clear answer

What's opportunity cost? Provide a hypothetical situation/scenario showing an
understanding of this concept.||

Answers

Answer: See explanation

Explanation:

Opportunity cost is what one forgoes when we choose a different alternative. Due to the scarcity of resources, we all have choices to make.

For example, if one is faced with a choice of either spending a certain amount of money on buying a book or going to the cinema. If the person eventually buys a book, then the opportunity cost is the cost of the movie not seen and the enjoyment that's comes with going to the cinema.

California has 53 U.S. House representatives. How many electoral votes does California have?

Answers

Answer:55

Explanation:

Just look it up

Answer:

California has 55 Electoral college votes

Explanation:

There are a total of 538 electoral votes, and the number of votes each state receives is proportional to its size --- the bigger the state's population the more "votes" it gets. For California, this means that they get 55 votes (2 senators and 53 members of the House of Representatives) --- the most of any state.

Hope this helps ^-^

Which statement accurately describes the relationship between accessible populations and target populations

Answers

Answer: The target population is actually seen as the population

Explanation:

Assessible population are mostly estimates around the main population but not the actual population. They are the population used by researchers for their study. While a target population is the total group of people where the sample of population can be drawn. It is seen that the target population is simply the population.

Other Questions
ch 2: which of the following terms is the most encompassing? a. value chain b. transformation process c. general management process d. operating system Highly authoritarian and delegative leaders foster bullying more thandemocratic leaders. when traveling at 55mph, how many feet do you need to stop?approximately 302 feetapproximately 303 feetapproximately 304 feetapproximately 305 feet What is the text structure of the passage ?A. Cause and effectB. DescriptiveC. Problem and solution D. Chronological Which statement BEST describes the common elements of most historical events?O Common elements do not provide the facts of an event.Common elements explain personal bias in primary sources.Common elements involve change, advance, or conflict.O Common elements include political and religious views, and family upbringing. PLS HELP ASAP!!!!!! THANK UUU briefly outline the four basic strategies that interest groups use to try to shape policy. p.e.l.l acronym T/FStorage utilization in a virtual environment requires planning for significant overhead due to the hypervisor's activity between the storage resources and the virtual guests. Find the area of the triangle -The answer [should be] 38.5 but I just cant figure out how to get there Can anyone help me with this question?You Message: It is your fault I failed that homework assignment! You should have helped me with it. Convert to an I Message: which energy source is qvqilqble at any time a municipal bond carries a coupon rate of 5.75% and is trading at par. what would be the equivalent taxable yield of this bond to a taxpayer in a 40% combined tax bracket? Lolly wrote a total of 10 pages over 5 hours. How many hours will Lolly have to spend writing this week in order to have written a total of 20 pages? PLEASE HELP ASAP 1.1235.78119Protein SynthesisDirections: Identify and label the numbered components and processes in the diagram below. (Hint: #5-6 are processes]rRNAPlace Answers HereAmino AcidmRNA#1#3#6Amino Acid Amino AcidtRNASUA#1#2AAA#2-AT-TGCGUUUDNA#3-UTranslationCcGGALDEA4-C#4Ribosome-GC G G45CytoplasmaTranscriptionUA T-T A-to t-86- Nuclear MembraneBonus! What type of RNA is found in#42#5 Josie measured the diameter of the base of her cup if the diameter of her cup measure 12cm what is the measure of the radius O 6cmO 24cmO 36cmO 144cm The species name of the African Elephant is Loxodonta africana, in the species name africana is the ______. Based on the information in the story, what would have happened if Nsue did not have an offering at the Festival of the New Moon? A. Nandi would have shared her honey. B. Father would have been disappointed. C. Nsues name would have remained the same. D. Old Man, Gao would have told stories of birds. 1Silently he crept through jagged thornbushes. Bare feet moved swiftly over hot, arid soil to the edge of a waterhole where the kudu was drinking. The great animal suddenly looked up, spiral horns curving sharply into the endless African sky. Nsue1 did not reach for his pouch of poisoned arrows. He had no heart for killing. This would not be the day he would change his childish boyhood name.2Nsue left the salt pan and climbed the barren hillside to the cool twilight of the rock caves. Tonight would be the Festival of the New Moon, and Nsue had nothing to contribute to the feast. His sister, Nandi, had found four plump tsamma melons to share.3Nsue lay on his back and studied the ancient paintings that lined the rock walls. They reminded him of the many stories that Gao, the Old One, told about the San people of long ago. In this harsh desert climate, everyone must hunt for food to survive. Gaos stories honored the brave hunters. Nsue wanted to hide in the caves until the stories were over. It was there that his father found him.4Nsues father knew the reason for the boys unhappiness. He had often heard the older boys teasing his son about his name. Nsue means ostrich egg. He was given this name because when he was a baby in a sling on his mothers back, his shiny oval head looked just like an ostrich egg gleaming in the sun.5Nsue is a fine name, his father said. Ostrich eggs are of great value to our people. One egg can feed twelve hungry men. The empty shells are used to carry and store water. Even the broken pieces become tools or jewelry. Be proud of your name!6Nsue turned his head away. It is the name of a child, not a hunter, he cried. I will never be a skilled hunter like you, Father. I do not wish to kill the beautiful animals of our desert.7Nsues father squatted on his heels and surveyed the vast Kalahari beyond. The spirit gods did not intend for all men to be hunters, he said softly. Some men tell stories around the cooking fires. Others paint our history on the walls of the rock caves. Men like Nxou are keepers of water. Without water, even the bravest hunters would soon die.8Despite his anxiety, Nsue had to smile as he thought of skinny Nxou pressing a dry reed through the sand in just the right place, drawing water to fill 15 ostrich eggs for tonights celebration. I will find something to share at the Festival of the New Moon, Nsue promised as he left the cave and walked into the shimmering heat.9In time, Nsue grew tired and stopped to rest in the shade of a thornbush. At first he thought the wind was playing tricks on his ears, but there it was again: Nta-nta-nta-nteee!10When he heard the excited cry of the honeyguide bird, Nsue leaped up and began to answer with the grunts and growls of the honey badger. As he ran along, he remembered the stories of Gao, who told of the bird who seeks out other creatures to invade the combs of honeybees.11Nsue ran like the desert wind, and eventually the honeyguide led him to the base of a baobab tree, standing like a lonely giant against the setting sun. The hollow tree revealed an opening, with bees buzzing angrily around the excited bird.12Nsue quickly tore a piece of fibrous bark from the base of the tree and began to climb. Without hesitation, he reached into the hollow center and dipped his scoop into a great comb of golden honey. He returned to the ground so quickly that only a few bees were able to avenge the intrusion with angry stings.13Although Nsue was in a hurry, he remembered Gaos words: If you do not leave a portion of the comb for the honeyguide who brought you to this golden treasure, the next time it will lead you to a hungry lion instead of thick, sweet honey.14It was dark when Nsue returned, and the Dance of the New Moon had already begun. His heart sang more loudly than the beautiful voices of the children. His face and arms were swollen from bee stings, but his lopsided grin was full of pride as he stepped forward and offered to share his golden prize.15As the music ended, his father announced, From this day forward, my son shall be known to all as Ratel, the fierce and clever honey badger.Nsue: pronounced neh-SOO-eeFrom Nsue and the Honeyguide by Sharon Howard, Faces, November 1, 2008 Which military alliance of north american and western european nations pledged in 1949 that all member nations would come to the aid of any member attacked by an outside enemy?. What is the second largest source of state revenue? write a public static method named meterstofeetandinches that will take a single argument of type double and will return a string. when called, and passed a distance value (in meters), this method must compute and return a string value with the equivalent distance in feet and inches.