Answer:
The standard deviation of the critical path = 5
Step-by-step explanation:
The formula for the standard deviation of a critical path is given as:
Standard deviation of a path
=√(sum of variances of activities on path)
Variance = (Standard deviation)²
In the above question, we are given:
Standard deviation of 1, 2, 4 and 2 days
Standard deviation of a critical path
=√(sum of variances of activities on path)
= √1² + 2² + 4² + 2²
= √1 + 4 + 16 + 4
= √25
= 5
The ratio of numbers of boys to girls in a class ion is 6 to 5.if there are a total of 48 boys in the classroom.find the number of girls in the classroom?
Find the volume of the sphere:
A. 452.4 cubic meters
B. 904.8 cubic meters
C. 150.8 cubic meters
D. 36 cubic meters
Work Shown:
r = 6 = radius
V = volume of a sphere of radius r
V = (4/3)*pi*r^3
V = (4/3)*pi*6^3
V = 904.77868423386
V = 904.8
I used my calculator's stored version of pi (instead of something like pi = 3.14)
The units "cubic meters" can be abbreviated to m^3 or \(m^3\)
The volume of the given sphere is 904.8 cubic meters. Thus, option B is the answer.
The volume of a sphere can be calculated using the formula:
V = \(4/3 * \pi * r^3\),
Where V is the volume and r is the radius of the sphere.
\(\pi\) = 3.14
The radius of the sphere (r) = 6m
Plugging in the given radius of 6m into the formula, we get:
V = (4/3) * \(\pi\) * (6^3)
V = 1.333 * \(\pi\) * 216
V = 1.333 * 3.14 * 216
V = 4.1866 * 216
V = 904.8 cubic meters
Therefore, when the radius of the sphere is 6m, the volume of the sphere is 904.8 cubic meters.
To practice more problems based on the sphere:
https://brainly.com/question/28228180
If the distance from Haley's house to school is 2.5 cm on the map and the actual distance is 3 miles. What is the scale for the map?
I know the answer but I get confused on what I am comparing. Could you explain step by step.
Answer:
Step-by-step explanation:
so you are trying to find the scale of the map which means you are comparing the distance on the map to the distance in real life. That being said you are trying to find:
For every 1cm on the map how far is that in real life?
so when you make your equation to solve like so (converting the miles to cm for an easy calculation:
2.5x = 48203
in this equation x (your answer) is the scale of map:real life
so x is how far 1cm on the map is in real life
Give the names of two other statistics that have the same value as the 50 th percentile. Choose the correct answer below. A. Second quartile; median B. Second quartile; mean C. Third quartile; mode D. First quartile; midrange
The 50th percentile is a commonly used statistic in data analysis. It represents the value below which 50% of the data falls.
In other words, it divides the data into two equal parts. There are two other statistics that have the same value as the 50th percentile, namely the second quartile and the median. The second quartile is the middle value of the data when it is arranged in ascending or descending order.
It is also known as the 50th percentile or the median. The first quartile is the value below which 25% of the data falls, and the third quartile is the value below which 75% of the data falls.
The mean is another commonly used statistic in data analysis. It is the sum of all the values in the data divided by the total number of values. Unlike the median, the mean is affected by extreme values or outliers in the data. This means that if there are outliers in the data, the mean may not be a good measure of central tendency.
The mode is the value that occurs most frequently in the data. It is another measure of central tendency that can be used in addition to the median and mean.
In summary, the 50th percentile is equivalent to the second quartile and the median. These statistics are all measures of central tendency that help to describe the distribution of data. The choice that best answers the question is option A: Second quartile; median.
To know more about value click here
brainly.com/question/30760879
#SPJ11
consider the set of numbers $\{1, 10, 10^2, 10^3, \dots, 10^{10}\}$. the ratio of the largest element of the set to the sum of the other ten elements of the set is closest to which integer?
The ratio of the largest element of the set to the sum of the other ten elements of the set is closest to which integer.
What is ratio?
A ratio in mathematics describes how many times one number is contained in another. For instance, the ratio of oranges to lemons in a dish of fruit is eight to six if there are eight oranges and six lemons (that is, 8:6, which is equivalent to the ratio 4:3). Similarly, the ratio of oranges to the total amount of fruit is 8:14, while the ratio of lemons to oranges is 6:8 (or 3:4). (or 4:7).
The quantities in a ratio can be of any kind, such as counts of people or things, measures of lengths, weights, or times, etc. Both numbers must be positive in the majority of situations.
Explanation:
The requested ratio is\(\[\dfrac{10^{10}}{10^9 + 10^8 + \ldots + 10 + 1}.\]\)
Using the formula for a geometric series, we have\(\[10^9 + 10^8 + \ldots + 10 + 1 = \dfrac{10^{10} - 1}{10 - 1} = \dfrac{10^{10} - 1}{9},\]\)
which is very close to \($\dfrac{10^{10}}{9},$\) so the ratio is very close to 9.
To learn more about ratio ,visit:
https://brainly.com/question/1504221
#SPJ4
can you please help me with this problem
what is the simplified form of x+6/x+4 +x-3/3
Answer:
3x+2
Step-by-step explanation:
x+6/x+4+x-3/3
3x+6/4-3/3
3x+6/1/3
3x+6/3
3x+2
A coffee distributor needs to mix a(n) House coffee blend that normally sells for $9.50 per pound with a Terraza coffee blend that normally sells for $14.70 per pound to create 20 pounds of a coffee that can sell for $10.54 per pound. How many pounds of each kind of coffee should they mix
The coffee distributor should mix 16 pounds of House coffee blend with 4 pounds of Terraza coffee blend to create a 20-pound mixture that can sell for $10.54 per pound.
Let's assume x represents the number of pounds of House coffee blend to be mixed and y represents the number of pounds of Terraza coffee blend to be mixed.
We are given the following information:
House coffee blend cost per pound: $9.50
Terraza coffee blend cost per pound: $14.70
Desired selling price per pound of the mixture: $10.54
Total weight of the mixture: 20 pounds
To solve this problem, we can set up a system of equations based on the cost and weight of the coffee blends:
Equation 1: x + y = 20 (Total weight of the mixture is 20 pounds)
Equation 2: (9.50x + 14.70y) / 20 = 10.54 (Average cost of the mixture is $10.54 per pound)
Let's solve this system of equations:
From Equation 1, we can express x in terms of y:
x = 20 - y
Substituting x in Equation 2:
(9.50(20 - y) + 14.70y) / 20 = 10.54
Simplifying and solving for y:
(190 - 9.5y + 14.70y) / 20 = 10.54
(190 + 5.2y) / 20 = 10.54
190 + 5.2y = 210.8
5.2y = 210.8 - 190
5.2y = 20.8
y = 20.8 / 5.2
y = 4
Substituting y = 4 back into Equation 1:
x + 4 = 20
x = 20 - 4
x = 16
Therefore, the coffee distributor should mix 16 pounds of House coffee blend with 4 pounds of Terraza coffee blend to create a 20-pound mixture that can sell for $10.54 per pound.
For more details about mixtures
https://brainly.com/question/29080733
#SPJ4
use the divergence theorem to compute the net outward flux of the vector field f across the boundary of the region d, where d is the region in the first octant between the planes zxy and zxy.
The divergence theorem is used to compute the net outward flux of the vector field across the boundary of a region in the first octant.
The divergence theorem, also known as Gauss's theorem, relates the flux of a vector field across a closed surface to the divergence of the field within the enclosed region.
In this case, we are given a region "d" in the first octant between the planes z = xy and z = xy. To compute the net outward flux of the vector field "f" across the boundary of region "d", we can apply the divergence theorem.
The divergence theorem states that the flux across the boundary is equal to the triple integral of the divergence of the vector field over the volume enclosed by the boundary.
By evaluating this triple integral, we can determine the net outward flux.
The net outward flux represents the total flow of the vector field through the surface boundary, taking into account both the magnitude and direction of the field.
It provides valuable information about the behavior and characteristics of the vector field within the given region.
learn more about vector click here:brainly.com/question/13322477
#SPJ11
3 comic books for $6.75FInd the unit rate
Answer:
$2.25 per comic book
Explanation:
To find the unit rate we need to divide the total cost of the comic books by the number of comic books. So,
$6.75/3 = $2.25 per comic book
Therefore, the unit rate is $2.25 per comic book
5. Which of the following could represent the side
lengths of a triangle?
Check all that apply.
19, 11, 17
23, 28, 52
34,9, 25
13, 22, 14
Answer: 19,11,17 and 13,22,14
Step-by-step explanation:
The two smallest numbers (11, 17) added together must be a bigger number than the biggest number (19)...... 11 + 17 = 28
28> 19 :)
help what’s the answer
What’s a good non-binary or male-ish name?
This isn't very mathematical, however, I can suggest Ace.
Answer:
This was almost 2 years ago but a name I really like is Ashton or Ash for short
Step-by-step explanation:
A jet travels 2301 miles against the wind in 3 hours and 2811 miles with the wind in the same amount of time. What is the rate of the jet in still air and what is the rate of the wind
Answer:
The rate of the jet in still air is 852 miles per hour. The rate of the wind is 85 miles per hour.
Step-by-step explanation:
Let suppose that jet travels uniformly, that is, at constant speed, the expressions for its travels against the wind and with the wind are, respectively:
Against the wind
\(v -u = \frac{\Delta x_{1}}{\Delta t_{1}}\)
With the wind
\(v +u = \frac{\Delta x_{2}}{\Delta t_{2}}\)
Where:
\(v\) - Speed of the jet in still air, measured in miles per hour.
\(u\) - Speed of wind, measured in miles per hour.
\(\Delta x_{1}\), \(\Delta x_{2}\) - Distances travelled by jet against the wind and with the wind, measured in miles.
\(\Delta t_{1}\), \(\Delta t_{2}\) - Times against the wind and with the wind, measured in hours.
By adding both expressions:
\(2\cdot v = \frac{\Delta x_{1}}{\Delta t_{1}}+\frac{\Delta x_{2}}{\Delta t_{2}}\)
\(v = \frac{1}{2}\cdot \left(\frac{\Delta x_{1}}{\Delta t_{1}} + \frac{\Delta x_{2}}{\Delta t_{2}} \right)\)
Given that \(\Delta x_{1} = 2301\,mi\), \(\Delta t_{1} = 3\,h\), \(\Delta x_{2} = 2811\,mi\) and \(\Delta t_{2} = 3\,h\), the speed of the jet is:
\(v = \frac{1}{2}\cdot \left(\frac{2301\,mi}{3\,h}+\frac{2811\,mi}{3\,h} \right)\)
\(v = 852\,\frac{mi}{h}\)
The rate of the jet in still air is 852 miles per hour.
Lastly, the rate of the wind is:
\(u = \frac{\Delta x_{2}}{\Delta t_{2}}-v\)
\(u = \frac{2811\,mi}{3\,h}-852\,\frac{mi}{h}\)
\(u = 85\,\frac{mi}{h}\)
The rate of the wind is 85 miles per hour.
Plz help due tomorrow
Answer:
option 1
Step-by-step explanation:
Combine like terms
\(1 + 4.25n + \frac{3}{2}p - 3 + (-2p) + \frac{5}{4}n=1 - 3 + 4.25n +\frac{5}{4}n+\frac{3}{2}p+(-2p)\\\)
\(= -2 + 4.25n + 1.25n + \frac{3}{2}p-\frac{2*2}{1*2}p\\\\= - 2 + 5.5n +\frac{3}{2}p+\frac{4}{2}p\\\\= -2 + 5.5n +\frac{3-4}{2}p\\\\= - 2 + 5.5n -\frac{1}{2}p\\\\= 5.5n - \frac{1}{2}p - 2\)
there are 6 students in the class. one of them is to be selected as the best student and another student is to be selected as a runner-up. how many different ways can this be done?
If there are 6 students and one is selected for best student and another is selected for runner up, then 15 different ways that we can arrange the students
Total number of students in the class = 6 students
Number of students for best student = 1 student
Number of students for runner up = 1 students
Total number of students needed = 2
Here we have to use the combination
6\(C_2\) = 6! / 2!(6 - 2)!
= 6! / 2! × 4!
Split the terms and cancel it
= 6 × 5 / 2 × 1
Multiply the terms
= 30 / 2
Divide the numbers
= 15 combinations
Therefore, there are 15 combinations
Learn more about combination here
brainly.com/question/28720645
#SPJ4
1. What is the area of ABCD?
2.What is the length of diagonal BD?
Answer:
1. 28.88
2. 7.6
Step-by-step explanation: Not sure if these answers are correct, but this is what I got.
Step-by-step explanation:
so, I understand this is a rhombus, yes ?
I will base my answer on that assumption.
the area of a rhombus is
p×q/2
p, q being the diagonals.
so, all 4 sides are equally long (5 cm).
the angle(s) between the diagonals is (are) 90°.
opposing angles are equally sized (B = D, A = C), and they are split in half by the diagonals.
and always remember : the sum of all angles in a triangle is always 180°.
so,
b1 = b2 = d1 = 50°.
a1 = a2 = c1 = c2 = 180 - 90 - 50 = 40°.
law of cosine :
c² = a² + b² - 2ab×cos(C)
with c being the side opposite of angle C. a, b are the kthe 2 sides.
that applies to all 3 sides and angles.
BD² = 5² + 5² - 2×5×5×cos(c1 + c2) =
= 25 + 25 - 50×cos(80) = 50 - 50×cos(80) =
= 41.31759112....
BD = 6.427876097... cm ≈ 6.43 cm
AC² = 5² + 5² - 2×5×5×cos(b1 + b2) =
= 25 + 25 - 50×cos(100) = 50 - 50×cos(100) =
= 58.68240888...
AC = 7.660444431... cm ≈ 7.66 cm
the area of ABCD is a described
AC × BD / 2 = 24.62019383... cm² ≈ 24.62 cm²
these are my last points that im using please help :(
Answer:
8 pencils per student.
Step-by-step explanation:
Since there are 4000 pencils and 500 students we can do 500 divided by 4000 to get our rate, 8 pencils for every student.
Determine the minimum sample size required when you want to be 95% confident that the sample mean is within two units of the population mean. assume a population standard deviation of 3.8 in a normally distributed population.
Minimum sample size (n) = 15
To determine the minimum sample size required, we can use the formula:
n = (Zα/2 * σ / E)^2
Where:
- n is the minimum sample size
- Zα/2 is the z-score at the 95% confidence level, which is 1.96
- σ is the population standard deviation, which is given as 3.8
- E is the maximum error we can tolerate, which is 2 units in this case
Substituting the values, we get:
n = (1.96 * 3.8 / 2)^2
n = 27.44
Rounding up to the nearest whole number, we get a minimum sample size of 28.
Therefore, we need to sample at least 28 individuals from the normally distributed population to be 95% confident that the sample mean is within two units of the population mean, assuming a population standard deviation of 3.8.
To determine the minimum sample size required for a 95% confidence level, we'll need to use the following formula:
n = (Z * σ / E)^2
where:
- n is the minimum sample size
- Z is the Z-score corresponding to the desired confidence level (1.96 for a 95% confidence level)
- σ is the population standard deviation (3.8 in this case)
- E is the margin of error (2 units in this case)
Step 1: Identify the values
Z = 1.96 (from the 95% confidence level)
σ = 3.8
E = 2
Step 2: Plug the values into the formula
n = (1.96 * 3.8 / 2)^2
Step 3: Calculate the result
n = (7.528 / 2)^2
n = (3.764)^2
n ≈ 14.15
Since the sample size must be a whole number, round up to the nearest whole number to ensure the desired level of confidence is achieved.
Minimum sample size (n) = 15
Learn more about standard deviation at: brainly.com/question/23907081
#SPJ11
Ivan in inventory has a whole bunch of numbers just sitting around. He wants to build a “Multiples of 2” set in his free time. How can he tell which numbers belong in this set?
Answer:
If they are divisible by 2
Step-by-step explanation:
:))
like ex.
2 4 6 8 10 12
The number sentence 4x6=6x4 is an example of the what property
Answer:
commutative property of multiplication
Step-by-step explanation:
The value of the product of the given equation remain the same while the order is reversed
The number sequence 4 × 6 = 6 × 4 is an example of the commutative property of multiplication
Reason:
The given number sentence is 4 × 6 = 6 × 4
Required: The property the number sentence is an example of (represent)
Solution:
The difference between the left and right expression is that the order of the
values being multiplied is changed or reversed (commute)
Therefore, the number sentence states that the value of the multiplication
of two variables remain equal when the places of variables are
interchanged as follows; a × b = b × a
a × b = b × a is an example of commutative property of multiplication
Therefore;
4 × 6 = 6 × 4 is an example of the commutative property of multiplication
Need answers fast help help !!!
Answer:
The answer is 29
Step-by-step explanation:
What is 1.24 x 0.5? Please help me
Answer:
Step-by-step explanation:
0.62
Answer:
Step-by-step explanation:
0.62
Two main categories of physical fitness are endurance-related fitness and skill-related fitness.
Please select the best answer from the choices provided.
Fitness related to endurance and fitness related to skill are the two basic types of physical fitness. Running is most likely the simplest solo sport for fostering both physical and mental fitness.
what is physical fitness ?Jogging, riding, swimming, and brisk walking are among examples. Exercises that build muscle strength are known as resistance training. Using a resistance band and lifting weights are two examples. Walking on uneven ground can be made simpler with balance exercises, which can also assist prevent falls.
Fitness related to endurance and fitness related to skill are the two basic types of physical fitness. Running is most likely the simplest solo sport for fostering both physical and mental fitness.
To know more about physical fitness visit :-
https://brainly.com/question/14338730
#SPJ1
Suppose the pet food company's strategy is to increase the proportion of sales orders from new stores in each region to 25% during the coming year. Consider the data and proportions of sales from new stores for each region in the first month. Do you think additional training is necessary for all of the sales representatives?
Answer:Every year, a pet food company sells its food to stores across the nation. ... In the first month of the new year, the Midwest region secured sales orders from ... Suppose the strategy of the pet food company is to increase the proportion of ... Do you think additional field training is necessary for all of the sales representatives?
Step-by-step explanation:
Yes sales representatives in Midwest and Northeast require more training
Although your question is incomplete attached below is the missing data related to your question
Given that the percentage of new stores in the Midwest and Northeast is below the 25% there will be need for an additional training for the sales representatives in these regions. while the percentage of new stores in the south is above 25% hence there won't be the need for additional sales representative training.
Percentage of new stores for after 1 month
Midwest = ( 66 / 362 ) * 100 = 18.2%
South = ( 115 / 197 ) * 100 = 58.3%
North east = ( 60 / 250 ) * 100 = 24%
Hence we can conclude that to meet up the 25% sales orders from new stores in each region additional training is required for sales representative s in Midwest and North east only.
learn more : https://brainly.com/question/18811795
If Fred is x years old now, and his sister is half as old, how old will be his sister in 5 years? Sorry, im bad at math homework
Sister's age in 5 years = 0.5(20) + 5 = 10 + 5 = 15 years old
The problem gives us two pieces of information: that Fred is currently x years old and that his sister is half as old.
We can use algebra to represent the sister's age in terms of x. Since we know that the sister is half as old as Fred, we can write:
Sister's age = 0.5 * Fred's age
But we also know that Fred's age is x, so we can substitute x in for his age:
Sister's age = 0.5 * x
This equation tells us that the sister's age is half of Fred's age, which is represented by the variable x.
To find out how old the sister will be in 5 years, we need to add 5 years to her current age. We already know from our earlier calculation that her current age is 0.5x, so we can simply add 5 to this expression:
Sister's age in 5 years = 0.5x + 5
This gives us an expression that represents the sister's age in 5 years, based on her current age (represented by 0.5x) and the additional 5 years we are adding on.
In our example, we were given that Fred is currently 20 years old, so we can substitute this value in for x:
Sister's age in 5 years = 0.5(20) + 5
Simplifying this expression gives:
Sister's age in 5 years = 10 + 5
Sister's age in 5 years = 15
Therefore, if Fred is currently 20 years old, then his sister would be 15 years old in 5 years time.
Learn more about old from
https://brainly.com/question/28009838
#SPJ11
duane is making a casserole for dinner. he has been cooking the casserole for 111 hour and 484848 minutes. the casserole needs to cook for 474747 more minutes. how many minutes does the casserole cook in total?
Duane is making a casserole for dinner. he has been cooking the casserole for 111 hour and 484848 minutes. the casserole needs to cook for 474747 more minutes, the casserole cook in total in minute 966255.
Casseroles are mainly cooked slowly in the oven, often uncovered. They may be served as a main course or side dish, and, conveniently, may be served in the vessel in which they were cooked. It's necessary to heat a casserole thoroughly before eating it; use an instant-read thermometer to make sure the casserole is at 165 degrees F for safe consumption.
Add together how long it has been cooking plus how long it needs to cook.
⇒ 111 hour and 484848 minute + 474747 minute
⇒ 491508 + 474747
⇒ 966255 minute.
know more about duane is making a casserole visit this link.
https://brainly.com/question/17170097
#SPJ4
There are 2,000 players in a basketball tournament. In each round, half of the players are eliminated. Which function can be used to find the number of players remaining in the tournament at the end of x rounds?
Answer:
Step-by-step explanation:
Left = 2000 * (1/2)^x
Try it.
x = 1
Left = 2000 * (1/2)^1
left = 2000 * 1/2
left = 1000
x = 3
left = 2000 (1/2)^3
left = 2000 (1/8)
left = 250
x = 4
left = 2000 * (1/16)
left = 125
from her on the function does not work accurately. You have to modify the algorithm.
Help help help me please
Answer:
it's 72
Step-by-step explanation:
length x height x base
6x3x4
6x3= 18
18x4=72
How could you correctly rewrite the equation 4(5+3)=2(22-6) using distribution property
Answer: 4(5+3) = 4(5) + 4(3) = 20 + 12 = 32
Step-by-step explanation:
Answer:
32=32 ?
Step-by-step explanation: