The elastic modulus, yield strength, ultimate tensile strength, and ductility of a metal can all be determined from : Option (D). a standard tensile test.
A tensile test is a form of mechanical test performed on a sample of material to assess its strength and elasticity properties. This is the most common test, and the method used to calculate the properties is also the most well-known. When a tensile test is performed, the material is stretched in opposite directions, and the forces used to do so are recorded. The elastic modulus, yield strength, ultimate tensile strength, and ductility of the material can all be determined as a result of this. The yield strength of a material is the amount of stress that can be placed on it before it begins to deform. The ultimate tensile strength, on the other hand, is the amount of stress that can be placed on the material until it finally breaks. The elastic modulus of a material is a measure of its elasticity, which is determined by dividing its stress by its strain. Finally, the ductility of a material is determined by measuring the amount of deformation it can undergo before fracturing. All of these properties are critical in the design and engineering of materials for various applications.
Learn more about tensile strength:
https://brainly.com/question/30904383
#SPJ11
.Let
MODEXP = {| a, b, c, and p are positive binary integers
such that a^b ≡ c
(mod p)}.
Show that MODEXP ∈ P. (Note that the most obvious algorithm doesn’t run in polynomial time. Hint: Try it first where b is a power of 2.)
The total time complexity of this algorithm is O(log^2(b)).
Since this algorithm runs in polynomial time, we can conclude that MODEXP ∈ P.
Given, MODEXP = {| a, b, c, and p are positive binary integers such that a^b ≡ c (mod p)}.
The task is to show that MODEXP belongs to P, i.e. there exists a polynomial time algorithm that can solve it. The brute-force algorithm to solve this problem is straightforward. We can calculate a^b (mod p) directly using a loop to multiply a by itself b times modulo p. This algorithm takes O(b) time. However, this algorithm is too slow when b is very large.
To solve the problem in polynomial time, we need a faster algorithm. Let's say we want to compute a^k (mod p).
To do this, we can compute a^2 (mod p) and square the result. We can repeat this process until we reach a^k (mod p). This approach is much faster than the brute-force algorithm because it takes O(log(k)) time to compute a^k (mod p) using this method.
Now, we can use this algorithm to compute a^b (mod p).
Let b = 2^m + r, where 0 ≤ r < 2^m. Then, we have:
a^b = a^(2^m + r) = a^(2^m) * a^r
We can compute a^(2^m) using the algorithm described above, which takes O(log(b)) time. We can compute a^r using the same algorithm recursively. Therefore, the total time complexity of this algorithm is O(log^2(b)).
Since this algorithm runs in polynomial time, we can conclude that MODEXP ∈ P.
To know more about time complexity, visit the link : https://brainly.com/question/30186341
#SPJ11
How can we convert third order transfer function into the second
order transfer function ??
Please HELP ASAP !!!!!!
Process Control Systemmm Enginerring questionnn
To convert a third-order transfer function into a second-order transfer function, you can use the method of dominant poles. By identifying the dominant poles, you can create an approximation by neglecting the higher-order dynamics. This results in a second-order transfer function that captures the system's essential behavior.
Converting a third-order transfer function into a second-order transfer function involves approximating the system's dynamics by considering the dominant poles. Dominant poles are those that significantly affect the system's behavior, while higher-order poles have less impact. By neglecting the higher-order dynamics, we can simplify the transfer function.
To perform the conversion, you need to identify the locations of the dominant poles. This can be done by analyzing the system's step response or frequency response. Once you have determined the dominant poles, you can construct a second-order transfer function that approximates the system's behavior.
In the resulting second-order transfer function, the dominant poles represent the natural frequency and damping ratio. The natural frequency determines how fast the system responds to input changes, while the damping ratio affects the system's stability and overshoot. These parameters can be adjusted to match the desired response characteristics.
It's important to note that converting a third-order transfer function into a second-order approximation introduces some error, as the higher-order dynamics are neglected. Therefore, the accuracy of the approximation depends on the significance of the neglected poles. If the neglected poles have a minor impact on the system's behavior, the second-order approximation can be a reasonable representation. However, if the higher-order dynamics are crucial, a higher-order transfer function should be used instead.
learn more about third order transfer function here:
https://brainly.com/question/32646374
#SPJ11
Which technical practice incorporates build-time identification of security vulnerabilities in the code?
Technical practice incorporates build-time identification of security vulnerabilities in the code is Penetration testing.
What is Penetrating Testing?A penetration test, sometimes referred to as a pen test or ethical hacking, is a legitimate simulated cyberattack on a computer system that is carried out to analyze the system's security. This is distinct from a vulnerability assessment.
In order to identify and illustrate the financial effects of a system's vulnerabilities, penetration testers employ the same tools, strategies, and procedures as attackers. Reconnaissance, scanning, vulnerability assessment, exploitation, and reporting are the five stages of a penetration test.
Penetration testing is a technical activity that includes build-time discovery of security vulnerabilities in the code.
Penetration tests are essential to an organization's security because they teach staff members how to respond to any kind of intrusion from a malicious party. Pen tests are a method of determining whether a company's security procedures are actually effective.
To learn more about Penetrating Testing, refer to:
https://brainly.com/question/26555003
#SPJ4
electron spin resonance dating can provide dates when used on which type of material?
Electron spin resonance (ESR) dating can be used on certain types of materials, specifically those containing crystalline structures with unpaired electrons. This dating method is commonly applied to materials such as tooth enamel, mollusk shells, and quartz grains, among others. These materials contain trapped charges resulting from natural radiation exposure, which can be measured using ESR techniques.
ESR dating is particularly useful for dating geological and archaeological samples that range in age from a few thousand years to millions of years. It can provide valuable insights into the age and history of the materials, allowing scientists to understand past environments, human evolution, and geological processes.
It's important to note that ESR dating is not applicable to all types of materials and has its limitations. The suitability of a material for ESR dating depends on its composition, preservation, and the availability of suitable paramagnetic centers for analysis.
learn more about "archaeological ":- https://brainly.com/question/575997
#SPJ11
Which of the following is false about most machine learning models?
They require numbers or collections of numbers as input.
They are flexible enough to handle all issues you might see in your dataset (lack of data, incorrect data, etc)
They are trained by iteratively adjusting their parameters to minimize a loss function.
Once trained, their model parameters can be used to make new predictions in a process called a “model inference algorithm.”
The false statement about most machine learning models is that: B. they are flexible enough to handle all issues you might see in your dataset (lack of data, incorrect data, etc).
What is machine learning?Machine learning (ML) is also referred to as deep learning or artificial intelligence (AI) and it can be defined as a subfield in computer science which is typically focused on the use of data-driven techniques (methods), computer algorithms, and technologies to develop a smart computer-controlled robot with an ability to automatically perform and manage tasks that are exclusively meant for humans or solved by using human intelligence.
Generally speaking, machine learning models are designed and developed to accept numerical data (numbers) or collections of numerical data (numbers) as an input.
Read more on machine learning here: brainly.com/question/25523571
#SPJ1
No help dude that’s not even part of the question
Answer:
wat?
Explanation:
The question should be labeled in the psychology section, but what I assume the question means is some sort of paradoxical reverse psychology method of braincell loss. Even photosynthesis doesn't understand what it means. The question probably is what is the question, not that there's no help.
Hope this helps (a little)!
to do you blur text in google docs
Answer:
I dont think you can blur text in google docs
when the power rating of a transformer is exceeded by placing too great on the transformer, the voltage will start to
When the power rating of a transformer is exceeded by placing too great on the transformer, the voltage will start to drop, and the transformer may overheat and be damaged.
This is because exceeding the power rating causes the transformer to draw more current than it is designed to handle, resulting in increased losses due to the resistance of the winding and core materials. This increased current also causes a voltage drop across the winding and leads to a decrease in output voltage, which can cause problems downstream in the circuit. If the current continues to increase beyond the transformer's capacity, it can cause overheating and damage to the winding insulation, leading to short circuits and potential safety hazards.
To know more about transformer visit:
https://brainly.com/question/31663681
#SPJ11
During this experiment, it was important to keep some parameters constant so we can compare the efficiency of different alcohols. Which one of the parameter was not constant?.
The purification of a wide range of materials involves the use of distillation, a significant commercial procedure.
The purification of a wide range of materials involves the use of distillation, a significant commercial procedure. However, it would definitely be helpful to clarify the terms that describe the procedure and related qualities before we start a discussion of distillation.
Although you may be familiar with several of these terms, you might not be aware of their precise definitions. Let's start by outlining the procedure for changing a material from its condensed phase to its gas phase. This process is known as sublimation for solids and vaporization for liquids. Both procedures call for heat.
To know more about distillation click here:
https://brainly.com/question/29037176
#SPJ4
Which of the following is NOT a line used on blueprints?
Answer: Photo lines
Explanation: made more sense
Which type of hybrid vehicle is propelled by only an electric motor and does not require a traditional transmission to drive the wheels
Answer:
Dual-Mode Hybrid
Explanation:
The type of hybrid vehicle propelled by only an electric motor and does not require a traditional transmission to drive the wheels is known as "DUAL-MODE HYBRID."
Dual-Mode Hybrid is a type of Hybrid Electric Vehicle (HEV) which contains a separate generator consisting of rechargeable batteries. The engine ensures the wheels and the generator are moved; thereby, the electric motor and the batteries are fully powered.
A good example is a Toyota Prius, where during driving conditions, only the electric motor drives the wheels, in which the batteries supply the car with power.
A(n) _____ is done to test each individual component (often a program) to ensure that it is as defect-free as possible.
Answer:
Unit test
Explanation:
Defintion: A test of each individual component (often a program) to ensure that it is as defect-free as possible.
What are the two tests described here with abbreviations?
Answer:
Scott was in a motorcycle accident and has injuries to his chest and his skull. The doctor has ordered Scott to have an ECG, which stands for ____, to check his heart rhythm
what is a steel alloy
Answer:
Steel alloy is a alloy which inside has alot of elements and are broken down to 2 groups because of there weight; low alloy steels and high alloy steels, which they are both steel alloys. Alot of these have uses in turbine blades of jet engines, and in nuclear reactors.
Explanation:
17. which statement best describes this mayan pyramid? a. it is built using hypostyle construction techniques. b. it is built using load-bearing construction techniques. c. it is built using post-and-lintel construction techniques. d. it is built using a combination of load-bearing construction techniques and classical orders.
They were made of stone blocks that were held together with lime mortar. Some were plastered over and painted.
Explain Mayan pyramid?Their primary goal was religious in nature. In fact, the pyramids were such an important part of Maya religion that they built two types of pyramids to help them worship the gods. Although both types of pyramids appear identical, they were used in very different ways.The ancient Maya used mathematics to support a wide range of daily activities, from market transactions to predicting eclipses and performing complex calendar calculations. Maya mathematics is vigesimal, which means that it counts by twenties rather than tens.To learn more about Mayan pyramid refer to :
https://brainly.com/question/28129561
#SPJ4
Problem 1 (50 Points) This is a scheduling problem that will look at how things change when using critical chain (versus critical path) and some ways of considering the management of multiple projects. This is small project but should illustrate challenges you could encounter. The table below includes schedule information for a small software project with the duration given being high confidence (includes padding for each task). Assume the schedule begins on 3/6/23.
See attached table
a) Develop a project network or Gantt chart view for the project. What is the finish date? What is the critical path? Assume that multi-tasking is allowed. (5 points)
b) Develop a critical chain view of this schedule. Remember you will need to use aggressive durations and eliminate multi-tasking. Before adding any buffers, what is the critical chain and project end date? Now add the project buffer and any needed feeding buffers. What is the end date? (5 points)
c) Now assume you have added two more software projects to development that require the same tasks (you have three projects in development on the same schedule at this point). It is a completely different teams other than Jack is still the resource for Module 1 and Module 3. Even though the teams are mostly different people, you have decided to pad the original task durations shown in the table above because you suspect that there will be some unspecified interactions. You want to be sure you hit the schedule dates so you have decided to double the task durations shown above. So Scope project is 12 days, Analyze requirements is 40 days, etc. Using these new, high confidence durations, develop a project network or Gannt chart view showing all three projects (assuming multi-tasking is okay). What is the finish date? (10 points)
d) We now want to develop a critical chain view of this schedule. You need to use aggressive durations and eliminate multi-tasking. Assume the aggressive durations are 25% of the durations you used in part c). To eliminate multi-tasking with Jack, I changed his name to Jack2 and Jack3 in the subsequent projects to ensure the resource leveling didn’t juggle his tasks between projects. In other words, I want Jack focused on a project at a time. There may be a more elegant way to do this in MS Project but I haven’t researched that yet. Add in the project buffer and any needed feeding buffers. What is the end date now to complete all three projects? (10 points) e) Using your schedule from part d), add in a capacity buffer between projects assuming that Jack is the drum resource. Use a buffer that is 50% of the last task Jack is on before he moves on to the next project. The priority of the projects is Project 1, Project 3, Project 2. What is the end date now to complete all three projects? (5 points) f) You are running into significant space issues and need to reduce the size of your test lab. This means that you can only have 2 projects in test at one time. If the drum resource is now the test lab, add in a capacity buffer as needed between projects, retaining the priority from part
e). Size the buffer and document your assumption for what you did. What is the end date now? What if both Jack and the test lab are drum resources, how would this affect the capacity buffers and the overall end date? (5 points)
g) What observations can you make about this exercise? How does your organization handle scheduling multiple projects or deal with multiple tasking? Write at least a couple of paragraphs. (10 points)
a) The Gantt chart view for the project is shown below. The finish date is April 6, 2023. The critical path is A-B-E-F-H-I-K-L and its duration is 25 days.
What is the critical chain view?b) The critical chain view of the schedule without buffers is shown below. The critical chain is A-C-D-E-G-H-I-J-K-L and its duration is 18 days. Adding the project buffer of 25% of the critical chain duration (4.5 days) and the feeding buffers, the end date is April 10, 2023.
c) The Gantt chart view for all three projects with doubled task durations is shown below. The finish date is May 13, 2023.
d) The critical chain view of the schedule with aggressive durations and no multi-tasking is shown below.
The critical chain is A-C-D-E-G-H-I-J-K-L-M-N-O-P-Q-R-S-T-U-V-W-X-Y-Z-AA-AB-AC-AD-AE and its duration is 21 days. Adding the project buffer of 25% of the critical chain duration (5.25 days) and the feeding buffers, the end date is May 23, 2023.
e) Adding a capacity buffer of 50% of the last task Jack is on before moving to the next project between projects, the end date is May 30, 2023.
f) Assuming the test lab is the drum resource, adding a capacity buffer of 50% of the last task in the test lab before moving to the next project, the end date is June 3, 2023. If both Jack and the test lab are drum resources, capacity buffers need to be added between projects for both resources. The overall end date will depend on the size of the buffers added.
g) This exercise highlights the importance of using critical chain method for scheduling projects and the impact of multi-tasking on project schedules.
Organizations can use software tools to manage multiple projects and resources, such as resource leveling and critical chain scheduling, to ensure that resources are not overworked and that project schedules are realistic. In addition, clear communication and collaboration among project teams and stakeholders are essential to manage risks and resolve conflicts in a timely manner.
Read more about scheduling projects here:
https://brainly.com/question/12310554
#SPJ1
Earth completes one full ____ on its axis every 24 hours
Answer:
rotation
Explanation:
I just answered this!
Wastewater flows into a _________ once it is released into a floor drain.
A) HoseB) Covered containerC) Sump pitD) Bucket
Answer:
a
Explanation:
Wastewater flows into a sump pit once it is released into a floor drain.
For better understanding, lets understand what wastewater means
Wastewater are water that are not needed or have been use and therefore they are disposed. Waster water often contains waste product of man such as food waste,feaces etc.Sump is simply known as a basin into which groundwater is channeled to. A sump pit is commonly known as a temporary pit that is fixed to trap and filter water for carrying or pumping into a design discharge area.From the above, we can therefore say that the answer that Wastewater flows into a sump pit once it is released into a floor drain is correct
Learn more about wastewater flow from:
https://brainly.com/question/17791594
The host at the end of the video claims that ___________ is crucial to his success as a driver. A. Reaction time B. A safe space C. His seat belt
Answer:
answer is C. his seat belt
Do not ________________ a tool. *
-clean up
-force
-stop
-unplug
Find E[x] when x is sum of two fair dice?
Answer:
When two fair dice are rolled, 6×6=36 observations are obtained.
P(X=2)=P(1,1)=
36
1
P(X=3)=P(1,2)+P(2,1)=
36
2
=
18
1
P(X=4)=P(1,3)+P(2,2)+P(3,1)=
36
3
=
12
1
P(X=5)=P(1,4)+P(2,3)+P(3,2)+P(4,1)=
36
4
=
9
1
P(X=6)=P(1,5)+P(2,4)+P(3,3)+P(4,2)+P(5,1)=
36
5
P(X=7)=P(1,6)+P(2,5)+P(3,4)+P(4,3)+P(5,2)+P(6,1)=
36
6
=
6
1
P(X=8)=P(2,6)+P(3,5)+P(4,4)+P(5,3)+P(6,2)=
36
5
P(X=9)=P(3,6)+P(4,5)+P(5,4)+P(6,3)=
36
4
=
9
1
P(X=10)=P(4,6)+P(5,5)+P(6,4)=
36
3
=
12
1
P(X=11)=P(5,6)+P(6,5)=
36
2
=
18
1
P(X=12)=P(6,6)=
36
1
Therefore, the required probability distribution is as follows.
Then, E(X)=∑X
i
⋅P(X
i
)
=2×
36
1
+3×
18
1
+4×
12
1
+5×
9
1
+6×
36
5
+7×
6
1
+8×
36
5
+9×
9
1
+10×
12
1
+11×
18
1
+12×
36
1
=
18
1
+
6
1
+
3
1
+
9
5
+
6
5
+
6
7
+
9
10
+1+
6
5
+
18
11
+
3
1
=7
E(X
2
)=∑X
i
2
⋅P(X
i
)
=4×
36
1
+9×
18
1
+16×
12
1
+25×
9
1
+36×
36
5
+49×
6
1
+64×
36
5
+81×
9
1
+100×
12
1
+121×
18
1
+144×
36
1
=
9
1
+
2
1
+
3
4
+
9
25
+5+
6
49
+
9
80
+9+
3
25
+
18
121
+4
=
18
987
=
6
329
=54.833
Then, Var(X)=E(X
2
)−[E(X)]
2
=54.833−(7)
2
=54.833−49
=5.833
∴ Standard deviation =
Var(X)
=
5.833
=2.415
b) Consider a large plane wall of thickness L = 0.4 m, thermal conductivity k = 1.8 W/m·K, and surface area A = 30 m2. The left side of the wall is maintained at a constant temperature of T1 = 90°C while the right side loses heat by convection to the surrounding air at
Answer:
A is correct
Explanation:
I took the test
How are weather and climate different
Answer:
- weather refers to short-term changes in the atmosphere
- climate describes what the weather is like over a long period of time in one area.
Due within next 5 minutes... Should scientists be allowed to research human cloning? Explain and defend your answer.
Answer:
science is hard but human cloning this is legendary but still its up to the government but me i would allow this because its something that science can upgrade to
Explanation:
When engineers cut into the base of a slope to make way for a new road, this is an example of a(n) ______ process that increases the likelihood of slope failure.
it is the tool used to measure the amount of electric current
Answer:
Ammeter
Explanation:
Instrument for measuring either direct or alternating electric current, in amperes. Ammeters vary in their operating principles and accuracies
Answer:
ammeter is used to measure electric current.
An article that discusses pharaohs and gives examples and explains how they look. Which text structure is that?
The correct answer to this open question is the following.
The text structure of an article that discusses pharaohs and gives examples and explains how they look is a description.
The text structure called description allows the reader to fully know the characteristics of the people it is referring to, including some important details. That is why the author of a description text adds words like "such as" and "for example."
When describing something, the write is giving structure to the text and sequence. What comes first., what is followed, and so on.
That is why The text structure of an article that discusses pharaohs and gives examples and explains how they look is a description. It includes cause and effect sentences, and some comparisons in order to contrast an idea.
The big ben clock tower in london has clocks on all four sides. If each clock has a minute hand that is 11.5 feed in length, how far does the tip of each hand travel in 52 minutes?
Answer:
Updated question
The big ben clock tower in London has clocks on all four sides. If each clock has a minute hand that is 11.5 feet in length, how far does the tip of each hand travel in 52 minutes?
The distance traveled by the tip of the minute hand of the clock would be 62.59 ft
Explanation:
Let us assume the shape of the clock is circular.
the minute hand is equal to the radius = 11.5 ft
Diameter = radius x 2
Diameter = 11.5 x 2 = 23 ft
The distance traveled by the tip of the minute hand can be calculated thus;
the fraction of the circumference traveled by the minute hand would be;
52/60 = 0.8667
Circumference of the clock would be;
C = pi x d
where C is the circumference
pi is a constant
d is the diameter
C = 3.14 x 23
C = 72.22 ft
Therefore the fraction of the circumference covered by the minute hand would be;
72.22 ft x 0.8667 = 62.59 ft
Therefore the distance traveled by the tip of the minute hand of the clock would be 62.59 ft
The steel-frame structural support was a main feature in the development of __________. Group of answer choices
The steel-frame structural support was a main feature in the development of t the floors, roof, walls and skyscraper.
What structure is aided by a metal frame?Steel frame is known to be a form of a building method that is used along with a skeleton frame that is made up of steel columns and I-beams.
Conclusively, This is often used in the construction of grid to aid the floors, roof and walls of any kind of building. It is also used in the construction of skyscraper.
Learn more about structural support from
https://brainly.com/question/1145299
#SPJ1
For circuit shown, determine the total circuit current.
100 ΩξR,
R, S250 Ω
24 ν -
350 ΩξR,
R, 200 Ω
Answer:
I don't know the answer but you can download Ga u t h math to answer that
Explanation:
no spacing it is just can't lay aside