Read the case study Dog Shelter App and develop a work breakdown structure, in tabular form. Corporate guides for creating project WBS’s are to use the five project management process groups as level 1 headings. Each process group must have at least one major deliverable and break down the work to the third level for at least one of the items.

Answers

Answer 1

The WBS includes major deliverables and breaks down the work to the third level for selected items, providing a comprehensive view of the project's scope and tasks.

The work breakdown structure (WBS) for the Dog Shelter App project is as follows:

1. Initiation

  1.1 Project Charter

  1.2 Stakeholder Identification

  1.3 Project Objectives

2. Planning

  2.1 Requirements Gathering

  2.2 Design Specifications

     2.2.1 User Interface Design

     2.2.2 Database Design

  2.3 Development Plan

  2.4 Resource Allocation

3. Execution

  3.1 Front-end Development

  3.2 Back-end Development

     3.2.1 User Authentication

     3.2.2 Database Integration

  3.3 Testing and Quality Assurance

4. Monitoring and Control

  4.1 Progress Tracking

  4.2 Issue Management

  4.3 Change Control

5. Closure

  5.1 User Acceptance Testing

  5.2 Deployment and Release

  5.3 Project Documentation

     5.3.1 User Manual

     5.3.2 Technical Documentation

  5.4 Project Review and Lessons Learned

This WBS provides a hierarchical breakdown of the project's activities, starting from the initiation phase and progressing through planning, execution, monitoring and control, and closure. Each process group includes major deliverables that need to be achieved.

Additionally, the WBS breaks down specific items to the third level for selected tasks, such as design specifications and back-end development, providing more detailed insights into the work required for those areas.

To know more about Integration, click here-

brainly.com/question/28385322

#SPJ11


Related Questions

you have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. the cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 50 minutes. what is the assembly line's efficiency? round your answer to the nearest two decimal places.

Answers

In the given situation the required assembly line's efficiency would be 0.833.

What is the assembly line's efficiency?

The number of hours that a high-volume pick-and-place machine is placing components on the printed circuit board, divided by the number of hours that the SMT assembly line is staffed, is the line efficiency formula.

It can also be expressed as 100 multiplied by the placement time hours divided by the staffed time hours.

Contrarily, assembly lines include the completion of a single task on the product as it moves down the production line as opposed to a sequence of tasks.

Maximizing the quantity a worker could produce in relation to the cost of labor, improves efficiency.

So, in the given situation the assembly line's efficiency would be:

[50 / (6 x 10)] = 0.833


Therefore, in the given situation the required assembly line's efficiency would be 0.833.

Know more about assembly line's efficiency here:

https://brainly.com/question/20066871

#SPJ1

What is the toll road?

Answers

A roadway, or segment of a highway, that requires users to pay to use it for maintenance and upkeep is known as a toll road. Toll roads are frequently speedier and less crowded options.

Since antiquity, there have been toll roads in some shape or form. Before the invention of the automobile, tolls were collected from passing travelers using foot, wagon, or horseback. Nowadays, many tollways only collect money from motor vehicles. Freight trucks are frequently paid greater rates than cars, with the amount of the toll typically varying by vehicle type, weight, or the number of axles.

At toll plazas, toll booths, toll houses, toll stations, toll bars, toll barriers, or toll gates, tolls are frequently collected. Some toll-collecting locations are automatic; after paying the necessary toll, the user inserts money into a machine that opens the gate.

To learn more about Toll Roads, visit the link below:

brainly.com/question/27995395

#SPJ4

The owners of a(n) are not personally responsible for the debts of the business. (Enter only one word per blank.)

Answers

limited liability company is one whereby owners are not personally responsible for the debts of the business.

What is limited liability company?

A limited liability company serves as a business structure which gives owners protection from personal responsibility for its debts or liabilities.

This type of structure is common in the U.S. and it help the sustainability of the business.

Learn more about limited liability company at;

https://brainly.com/question/25012970

Jenna supervises a group of employees who are highly trained and
motivated. Based on this information, which type of management style
should Jenng employ?
A. Directing
B. Supporting
C. Delegating
D. Coaching
SUBMIT

Answers

Answer: C. Delegating

Explanation:

With a delegating management style, the manager simply assigns projects and duties to their subordinates and gives them the freedom to carry out those tasks the way they see fit.

This is best used when the employees are very skilled and motivated. Their skill will enable them to get the job done and their motivation means that they do not have to be followed up constantly to get the job done.

Answer:

DELEGATING

Explanation:

d

e

l

e

g

a

t

i

n

g

Which of the following statements describes how mobile devices, the use of computers in more and more everyday interactions, and the ability to connect with other devices almost anywhere are changing society? 1. People are able to use mobile devices for new applications such as finding directions or finding restaurants 2. Data can be collected from thousands of sources and can be combined to provide new services to individuals and companies 3. Buildings, cars, classrooms, and offices can now be engineered with sensors to automate tasks like adjusting the thermostat or even driving 4. Data that is collected can be used to identify social problems O 3 only. О 1 and 2. 2 and 4. 1, 2, 3 and 4. Question 2 1 pts Which of the following best provides an example, in order, of (a) data, (b) information and (c) knowledge in a student context? O (a) 80%, (b) James received 80% for his latest assignment, (c) James succeeds because he is a hard working student. (a) Donna achieved a score of 60%, (b) Donna achieved a credit, (c) If Donna wished to receive a distinction she should have worked harder. O (a) The pass mark is 50, (b) 50, (c) A student needs 50 or over to gain a pass in this subject. O (a) 20%. (b) Grade, (c) 10% of students achieved a HD grade. Question 3 1 pts Ronald, Manager of Reliable Car Rentals, has recorded the total number of car rentals and the associated rental charge to customers for January, February and Mar' for each of his four vehicle categories. He used this data to perform a trend analysis for the next three months. He will use this data to help make a decision about which car category he should focus on when he expands his car fleet. This is an example of: O Predictive analytics Descriptive analytics Prescriptive analytics Adaptive analytics Question 4 1 pts What usability heuristic for user interface design is it? Minimize the user's memory load by making objects, actions, and options visible. The user should not have to remember information from one part of the dialogue to another. Instructions for use of the system should be visible or easily retrievable whenever appropriate. Visibility of system status. Recognition rather than recall. O Match between system and the real world. Error prevention.

Answers

Question 1:
Mobile devices, the use of computers in more and more everyday interactions, and the ability to connect with other devices almost anywhere are changing society in the following ways:

People are able to use mobile devices for new applications such as finding directions or finding restaurantsData can be collected from thousands of sources and can be combined to provide new services to individuals and companiesBuildings, cars, classrooms, and offices can now be engineered with sensors to automate tasks like adjusting the thermostat or even drivingData that is collected can be used to identify social problemsTherefore, option 1, 2 and 3 are correct.
Question 2:
Out of the provided options, the example that best provides an example of (a) data, (b) information and (c) knowledge in a student context is:
(a) The pass mark is 50, (b) 50, (c) A student needs 50 or over to gain a pass in this subject.
In this example, (a) data is "The pass mark is 50", (b) information is "50", and (c) knowledge is "A student needs 50 or over to gain a pass in this subject."
Question 3:
Ronald, Manager of Reliable Car Rentals, has recorded the total number of car rentals and the associated rental charge to customers for January, February and March for each of his four vehicle categories. He used this data to perform a trend analysis for the next three months. He will use this data to help make a decision about which car category he should focus on when he expands his car fleet. This is an example of predictive analytics.
Question 4:
"Visibility of system status" is a usability heuristic for user interface design that minimizes the user's memory load by making objects, actions, and options visible. The user should not have to remember information from one part of the dialogue to another. Instructions for use of the system should be visible or easily retrievable whenever appropriate. Therefore, the correct option is visibility of system status.

To know more about Mobile devices visit:

https://brainly.com/question/4673326

#SPJ11

"take hundred now is more valuable than take hundred after one year" explain it​

Answers

Answer:

Today's dollar is worth more than tomorrow's because of inflation (on the side that's unfortunate for you) and compound interest (the side you can make work for you). Inflation increases prices over time, which means that each dollar you own today will buy more in the present time than it will in the future.

Why might a company’s service level expectations for its 3pl provider conflict with the 3pl’s goal of a mutually beneficial relationship?

Answers

Conflicts between a company's service level expectations and a 3PL's goal of a mutually beneficial relationship can arise due to differences in cost priorities, overall objectives.

A company's service level expectations for its third-party logistics (3PL) provider may conflict with the 3PL's goal of a mutually beneficial relationship due to several reasons:

Cost vs. Service Balance: A company's primary focus may be on cost reduction and efficiency, while the 3PL's goal is to maintain profitability and offer competitive pricing. The company may demand higher service levels, such as faster delivery or additional services, which could increase costs for the 3PL. This misalignment can create conflicts as the 3PL seeks to balance service quality with cost-effectiveness.

Differing Priorities: The company may prioritize its own customer satisfaction and reputation, expecting the 3PL to adhere strictly to service level agreements (SLAs) to meet customer demands. On the other hand, the 3PL may have broader goals, including building long-term relationships, optimizing overall operations, and serving multiple clients. These divergent priorities can lead to conflicts when service level expectations become excessively demanding or rigid.

Capacity and Flexibility: The company's fluctuating demand may require a high degree of flexibility and scalability from the 3PL. However, the 3PL may have limitations in terms of resources, infrastructure, or personnel. Meeting the company's service level expectations under such constraints may strain the 3PL's operations, potentially impacting their ability to serve other clients or maintain profitability.

Risk Management: Companies often have stringent requirements for risk management, including product safety, security, and compliance. These expectations may go beyond what the 3PL considers necessary or economically viable. Stricter requirements can lead to additional costs or operational complexities for the 3PL, conflicting with their goal of a mutually beneficial relationship.

Competitive Pressures: The company may operate in a highly competitive market and rely on superior logistics services as a differentiating factor. They may demand higher service levels to gain a competitive edge, such as faster order processing or specialized handling. However, meeting these demands may require significant investments from the 3PL, impacting their profitability or limiting their ability to serve other clients.

In summary, conflicts between a company's service level expectations and a 3PL's goal of a mutually beneficial relationship can arise due to differences in cost priorities, overall objectives, capacity constraints, risk management requirements, and competitive pressures.

Effective communication, collaboration, and a shared understanding of each other's constraints are crucial to resolving these conflicts and establishing a mutually beneficial partnership.

Learn more about Competitive pricing:

brainly.com/question/28295582

#SPJ11

When you plan a presentation, how should you make sure you stay on track as you talk?

A. Make a list of general topics and points you want to cover.

B. Write out every word of the presentation on notecards.

C. Memorize every word of the presentation in your head.

D. Have the audience tell you what else you need to talk about.

Answers

Answer:

A make a list

Explanation:

Answer:

It's A. Make a list of general topics and points you want to cover.

Explanation: hope it helps ^w^

an employee can be dismissed if their job surplus to requirements' outline why this state ment is false

Answers

Hiring labour is different from buying other goods and services, and the contract between the employer and the employee is incomplete. It does not cover what the employer really cares about, which is how hard and well the employee works.

Multiple Choice . Please place the letter of your choice in the blank space. 1. The A) income statement B) statement of cash flows C) balance sheet is the summary of revenues and expenses for a period. 2. A) Revenue B) Loss C) Owner's withdrawal does not decrease owner's equity. 3. A) Multi-step B) Single-step C) Reorganized income statements itemize operating expenses under selling and administrative expenses. 4. Inventory is recorded on the balance sheet and becomes A) Common Stock B) Cost of Goods Sold C) Long-term Debt when sold. Please fill in the blanks 5. is a liability account for goods received by a business but not paid for yet. 6. have been incurred (service used) in the period but cash has not been paid yet. 7. From the company buying inventory's perspective, accounts _reflects the amount owed to a vendor. 8. We use to recognize the cost of an intangible asset over the periods it is used 9. Net income kept in the business and not paid in dividends goes into the account on the balance sheet 10. In preparing a statement of cash flows, an increase in the Common Stock during a period would be acn) activity

Answers

1. The income statement summarizes revenues and expenses. 2. Revenue does not decrease owner's equity.3. Multi-step income statements itemize operating expenses. 4. Inventory becomes Cost of Goods Sold when sold. 5. Accounts Payable is a liability for unpaid goods.

6. Accrued expenses have been incurred (service used) in the period but cash has not been paid yet. 7.  From the company buying inventory's perspective, accounts Accounts Payable reflects the amount owed to a vendor. Accounts Payable reflects the amount owed to a vendor. 8. Amortization is used to recognize the cost of intangible assets. 9. Net income not paid in dividends goes into Retained Earnings. 10.An increase in Common Stock is a financing activity in the statement of cash flows.

1.The A) income statement is the summary of revenues and expenses for a period.

2.A) Revenue does not decrease owner's equity.

3.A) Multi-step income statements itemize operating expenses under selling and administrative expenses.

4.Inventory is recorded on the balance sheet and becomes B) Cost of Goods Sold when sold.

5.Accounts Payable is a liability account for goods received by a business but not paid for yet.

6.Accrued expenses have been incurred (service used) in the period but cash has not been paid yet.

7.From the company buying inventory's perspective, accounts Payable reflects the amount owed to a vendor.

8.We use Amortization to recognize the cost of an intangible asset over the periods it is used.

9.Net income kept in the business and not paid in dividends goes into the Retained Earnings account on the balance sheet.

10.In preparing a statement of cash flows, an increase in the Common Stock during a period would be categorized as a financing activity.

To know more about income statement click here

brainly.com/question/14890247

#SPJ11

In 1985, Mikhail Gorbachev, the head of the Communist party in the Soviet Union, began an ambitious attempt to reform and modernize the USSR and integrate it into the international economy. His first policy was glasnost (intellectual openness), allowing greater freedom of speech, instituting competitive elections to official positions, and limiting terms of office. His second was known as ____________ and sought to shift away from a centrally planned economy and allow for the operation of market forces

Answers

Answer:

Mikhail Gorbachev’s second policy was known as perestroika.

One of the major trends in the lodging sector is that organizations are becoming more international.
O False
O True
Mark this and return
Save and Exit
Nex
Subm

One of the major trends in the lodging sector is that organizations are becoming more international.O

Answers

The answer would be true

what was your favorite movie ever?
What was the last book you read?
Do you believe in aliens?
What is your star sign?
What is the best gift you've ever given someone?
Would you rather spend the day inside or outside?
Do you shower at night or in the morning?

Answers

Us

Diary kid

Yea

Scorpio

A hug

Inside


Morning

Collusion occurs when companies agree to drop prices and increase production.

True
or
False

Answers

It’s obviously false you nerd

________ provide(s) a key avenue for growth for many young and small firms through partnering to obtain resources and to expand into new markets.

Answers

Strategic alliances provide(s) a key avenue for growth for many young and small firms through partnering to obtain resources and to expand into new markets.

The partnering / agreement is less complex and less binding than a joint venture, in which two businesses pool resources to create a separate business entity.

This therefore is an easier way to generate resources, gain entry to new markets and share the risk and cost of major development projects.

https://brainly.com/question/28504355

#SPJ4

Which of the following choices incur speculative risk?

a.stocks

b.fire insurance on a house

c.options

d.life insurance


e.high interest savings account

Answers

Answer: correct option is A.

Explanation: A speculative risk can be defined as risk that is taken willingly either it results in profit or loss and the stocks involve in probability of gain and loss making it a speculative risk.

Stocks incur speculative risk. Therefore option A is correct.

What are Stocks?

A stock usually referred to as equity, is a type of investment that denotes ownership in a portion of the issuing company. Shares, also known as units of stock, entitle their owners to a share of the company's assets and income in proportion to the number of shares they possess.

Common stock and preferred stock are the two primary categories of stocks.

Owners of common stock are entitled to dividends and the right to vote at shareholder meetings.

Common stockholders often do not have voting rights, while preferred stockholders typically get dividend payments ahead of time and are given preference over common investors in the event of a firm bankruptcy and asset liquidation.

To learn more about Stocks follow the link.

https://brainly.com/question/14649952

#SPJ2

If you saw a coworker take something from the clinic what would you do?

Answers

Answer:

Um I would either tell them that he took it or i would just not worry about

Answer:

Join him.......

shows the amount of savings and borrowing in a market for loans to purchase homes, measured in millions of dollars, at various interest rates. What is the equilibrium interest rate and quantity in the capital financial market

Answers

Answer:

7% and 135

Explanation:

The computation of the equilibrium interest rate and the quantity is shown below:

As we can see in the attached figure that at the interest rate of 7% the Qd is equivalent to Qs i.e 140

And when it the interest rate is 8% the quantity of lending is 145 and the quantity of borrowing is 135 that decreased the quantity of lending by 140 to 135 so we considered the 135

shows the amount of savings and borrowing in a market for loans to purchase homes, measured in millions

Determining the payment options to be offered to a business's customers is which function?

Answers

Answer:

Pricing

Explanation:

the leadership style introduced by robert greenleaf of helping employees grow and succeed is the _________ leadership theory

Answers

The leadership style introduced by Robert Greenleaf of helping employees grow and succeed is the servant leadership theory.

Servant leadership theory emphasizes the leader's focus on serving the needs of their employees, empowering them, and helping them reach their full potential. Robert Greenleaf popularized this concept, advocating for leaders to prioritize the growth and development of their followers.

In servant leadership, leaders act as servants first and leaders second, ensuring the well-being and success of their team members. This approach fosters a supportive and nurturing environment, where leaders actively listen, provide guidance, and remove obstacles to enable employee growth and achievement.

For more questions like Leadership click the link below:

https://brainly.com/question/31138185

#SPJ11

Research some examples of organizations that experienced bad publicity and how they dealt with it. Write a paper detailing your findings.

Answers

Answer:

did you finish it cuase i got the same one

Explanation:

Admit the error, apologize, and present a solution if you or your company is receiving negative press as a result of anything you did incorrectly. Negative publicity won't disappear if you ignore it.

What do you mean by Negative publicity?

When damaging material is revealed, negative PR or publicity can take many different forms in company and can impact everything from sales to your reputation.

Various forms of unfavorable PR for your company could include: negative coverage of your business in the media, online, in publications, or on television.

In particular, we contend that by raising product awareness, unfavorable publicity might boost sales and purchase likelihood.

Negative publicity should therefore affect products differently depending on whether they are recognized or unknown. This viewpoint is supported by three investigations.

Your brand's reputation can be severely damaged in a matter of minutes by false information, negative reviews, and nasty social media remarks. Even worse, rumors spread swiftly and negatively impact the reputation of your company.

Negative publicity can have a significant impact on how potential customers see your brand. When customers publicly disparage a company, product, or service, this is known as bad publicity.

Bad publicity includes posting or publishing negative evaluations on websites, review pages, and social media accounts.

Learn more about Negative publicity, here

https://brainly.com/question/15561429

#SPJ2

What are some ways to use a range name in a formula? Check all that apply.

Answer:In the Defined Names group, click Use in Formula, and then select the desired name.
Begin typing the name in the formula, select a name from the AutoComplete list, and use the arrow keys and Tab key to enter the name in the formula.

Answers

Answer:

A

Explanation:

i’m pretty sure it’s A

According to the concept of the invisible hand, what emerges due to the self-interested
choices of buyers and sellers in a free market?

Answers

Answer: The invisible hand is a metaphor for how, in a free market economy, self-interested individuals can promote the general benefit of society at large.

MPUM BOTTLE MANUFACTURERSTABM)
Mpumi Bottle Manufacturers is a large business well known for supplying quality plastic
bottles, is the most customer-centric company, that build a place where people can come
find any bottle. The financial manager borrowed money from Blue bank at a high-interest
rate to buy material and equipment for manufacturing bottles. MBM has recently appointed
two experienced employees who are responsible for branding the bottles
The demand for branded bottles increased in other provinces they opened another branch
in North West Province. Raheem Trading opened a similar business that offers the same
services at a lower price,
Gail, the director shares the understating of how things are done in the business to
accomplish the business mission Raheem Trading's board of directors strongly believes in
good leadership and management for the success of the business.
Bennie the purchasing manager, at Raheem Trading ensures that there is enough stock
available for continuous production, Place orders with suppliers and follow up on them.
The credit department supervisor educates consumers on making the right choices when
they apply for credit
1.1.1 Quote the visions statement of mpumi bottle manufacturers in the case study above
1.1.2 Name ONE component/feature of each business environment in the cas study above .motivate your answer by quoting from the case study

Answers

Answer:

Name one component/feature of each business environment in the case study

What is SEO?

A. A place where online discussions are held

B. A way to share information about your products or services

C. A way web page creators attract people to their sites

D. When purchasers bid on the number of clicks on an online
advertisement

Answers

The answer is C.

—Evidence—
•-SEO definition: the process of optimizing your website to get organic, or un-paid, traffic from the search engine results page. ... You do this in hopes that the search engine will display your website as a top result on the search engine results page.

SEO is When purchasers bid on the numeral of clicks on an online advertisement. The Correct option is C.

What do you mean by SEO?

SEO definition: When the procedure of optimizing your website to accumulate organic, or un-paid, gridlock from the tracking engine developments page.

SEO refers to Search Engine Optimization, which is the procedure of increasing the quantity and also differentia of traffic to your website through organic search engine results.

SEO is a technique for inventing and designing a website to rate well in investigation engine results.

When they are improving the importance and quality of traffic to a website from search engines.

Marketing by comprehending how search algorithms work, and what mortal visitors might search.

Find more information about SEO here:

https://brainly.com/question/26719631

in a chapter 13, how long does a non-governmental creditor have to file a proof of claim?

Answers

When you finish your Chapter 13 repayment plan, you'll receive a discharge order, which will wipe off the remaining sum of qualified debt.

In fact, a Chapter 13 bankruptcy discharge is even broader than a Chapter 7 release since it wipes out certain debts that are nondischargeable in Chapter 7 bankruptcy. If the debtor has more than 12 unsecured creditors, at least three of them must join in the bankruptcy petition, and they must reach a threshold amount of unsecured debt as a group, which also grows on a regular basis. In California, the statute of limitations for consumer debt is four years. This means that a creditor cannot triumph in court after four years, rendering the debt practically uncollectible.

Learn more about the bankruptcy

https://brainly.com/question/26392690

#SPJ4

Create a scenario for each word definition. (Total of 9 scenarios)

1-)Criticism - is the practice of judging the merits and faults of something. Criticism as an
evaluative or corrective exercise can occur in any area of human life. In specific areas of
human endeavor, the form of criticism can be highly specialized and technical; it often requires professional knowledge to understand the criticism.

2-) Disciplines - information literacy practices change based on the discipline (or what one is
studying or researching) to determine if information is relevant to the need

3-) Methods/techniques used to obtain or retrieve information.
The Web is potentially a terrific place to get information on almost any topic. Doing
research without leaving your desk sounds like a great idea, but all too often you end up
wasting precious time chasing down useless URLs.

4-)Accuracy - the document must be correct so you can put a point across

5-) Purpose - What is the author’s intention? Is the information fact, opinion, or propaganda? Is the author's point of view objective and impartial? Is the language free of emotion-rousing words or bias? Is the publication organized logically? Are the main points clearly presented? Do you find the text easy to read? Is the author repetitive?

6-) Proposals - a plan or suggestion, especially a formal or written one, put forward for
consideration or discussion by others.

7-) Copying - make a similar or identical version of; reproduce.

8-) Documentation - Every organization needs to save information for its own purposes,
such as institutional memory, transaction lookup and analysis, and so on.

9-) Recordkeeping – documents are duplicated or replaced

Answers

The scenarios are:

Scenario for Criticism: An art teacher critiques her students' paintings, pointing out the strengths and weaknesses of each one and offering suggestions for improvement.Scenario for Disciplines: A biology student searches for information about the impact of climate change on coral reefs. They must determine if the information they find is relevant to their field of study and if it can be trusted.Scenario for Methods/Techniques: A journalist uses multiple sources to fact-check information they find on the web. They use search engines, databases, and expert opinions to verify the accuracy of the information they collect.Scenario for Accuracy: A legal secretary is tasked with preparing a document that will be used in court. They must ensure that every detail in the document is correct and free of errors to avoid any legal consequences.

What are the scenarios?

The others are:

5. Scenario for Purpose: A reader evaluates the credibility of an article on climate change. They consider the author's point of view, the language used, the organization of the text, and the overall tone of the article.

6. Scenario for Proposals: A business owner presents a proposal to their partners to expand the company's operations into a new market. The proposal includes a detailed plan, financial projections, and a discussion of the potential risks and benefits.

7. Scenario for Copying: An office assistant makes a copy of an important document for each member of the management team. They take care to ensure that each copy is an exact replica of the original.

8. Scenario for Documentation: A human resources manager maintains a file for each employee, including their job application, performance evaluations, and disciplinary records. They use this information to make informed decisions about promotions, raises, and terminations.

9. Scenario for Recordkeeping: A doctor keeps a detailed record of a patient's medical history, including diagnoses, treatments, and medications. This information is used to track the patient's progress and ensure that they receive the best possible care.

Learn more about scenario  from

https://brainly.com/question/30275614

#SPJ1

How does Ana spend her time in seedfolks?

Answers

Answer:

B

Explanation:

Got it right on edg 2020

how long does it take for tax refund to show in bank account after approved

Answers

Answer:

Assuming no issues, IRS issues tax refunds in less than 21 calendar days after IRS receives the tax return. IRS has an on-line tool, "Where's My Tax Refund", at www.irs.gov that will provide the status of a tax refund using the taxpayer's SSN, filing status, and refund amount.

Explanation:

consider the simplified reporting activities of a construction company that manages several building projects. each project has its own project number, name, assigned employees, and so on. each employee has an employee number, name, and job classification, such as engineer or computer technician.

Answers

A construction company tracks project details (project number, name) and employee information (employee number, name, job classification) for simplified reporting activities.

The simplified reporting activities of a construction company managing several building projects involve tracking project details and employee information.

Here's an example structure that captures the relevant information:

1. Project:

Project NumberProject NameAssigned Employees (List of employee numbers associated with the project)

2. Employee:

Employee NumberNameJob Classification

With this structure, you can organize and report on the construction company's activities as follows:

Project Reporting: Generate reports that provide an overview of each project, including project number, name, and the list of assigned employees. This allows you to track the progress, resources allocated, and responsible team members for each project.

Employee Reporting: Generate reports that provide employee-specific information, including employee number, name, and job classification. This allows you to manage and track the roles and responsibilities of employees across different projects.

Project Employee Assignment: Maintain a mapping or relationship between projects and employees, indicating which employees are assigned to each project. This enables you to track the distribution of human resources and ensure that the right employees are allocated to the appropriate projects.

These reporting activities provide valuable insights into the construction company's operations, facilitating project management, resource allocation, and overall tracking of the workforce's involvement in various building projects.

Learn more about project here:

https://brainly.com/question/30027352

#SPJ4

Other Questions
tomas is not able to find any data on the number of households using an electric stove so he devises a survey to obtain the information. his survey results are an example of ______ data. What are two allegory examples? TRUE / FALSE. within a learning organization, the goal is to ensure that employees are sticking to the status quo. Stephan claims that Earth has both a gravitational field and a magnetic field. Which statement best supports his claim? A.A compass points in the direction of both the magnetic and gravitational fields.B.Any object will fall to the ground.C.A bar magnet will fall to the ground.D.Any object will fall to the ground, and a compass can be used for navigation. A call option seller has the _____ to _____ the underlying asset at a fixed price in the future if the option buyer chooses to exercise it. In the interval 0 < x < 360, find the values of x for which tan x = -0. 4452 Give your answers to the nearest degree going back to bed now ill answer questions at 6:00 am. Its only 3:18 am. which from of democracy dose the United States have? What is the ratio P1/P2P1/P2 of their power dissipations if the same current passes through each resistor Please help! Solve for x. 1/4 : 100 = x : 1000 ? Please can someone do this whole thing i beg i need this i literally am going to fail spanish if i dont get this done. I will give brainilest!!! a client who underwent a physical examination reports itching after 2 days. which condition would the nurse suspect? on january 1, 2024, white water issues $520,000 of 5% bonds, due in 15 years, with interest payable semiannually on june 30 and december 31 each year. assuming the market interest rate on the issue date is 6%, the bonds will issue at $469,041. exitwhich of the following shows the number 10,000,000 as a number with two significant digits using scientific notation?a.b.c.d. Patient a weighs 135.8 pounds.patient b weighs 135 2/5 ibs. which patient has the greater weight or if their weights are equal What operations would you perform, and in what order would you perform them to solve1 5n = 20? the type a personality can be described as while type b can be described as . group of answer choices easygoing; competitive competitive; easygoing easygoing; less hostile competitive; aggressive What is the length of the unlabeled side? Suppose you have two coherent point sources both havingmonochromatic light with wavelength of 514.5 [nm]. Which pathdifference between them would you need to achieve a phase shift of45 degrees?A.