False, organizing is not the second level of Work Breakdown Structure by major design component facilities rolling wave planning.
Work can be made more manageable and approachable by using a common productivity strategy called task breaking. The Work Breakdown Structure (WBS), one of the most significant project management papers, is the tool that applies this technique to projects. It does it on its own, integrating scope, cost, and schedule baselines to guarantee project plans are in sync. There are many diverse applications for the work breakdown structure. It starts off as a planning tool to aid the project team in organizing scope with deliverables and planning, defining, and planning. The WBS is also utilized as the main resource for activities that schedule and cost estimate.
Learn more about Work Breakdown Structure here:
https://brainly.com/question/14262396?
#SPJ4
What should government do with its spending and taxes during an
upturn in the business cycle? Why?
During an upturn in the business cycle, the government should reduce its spending and increase taxes.
What Should Government Do During An Upturn In The Business Cycle?The type of policy that government should do during an upturn in the business cyle is contractionary fiscal policy, and it is designed to help prevent the economy from overheating and causing inflation. By reducing spending, the government can decrease the amount of money circulating in the economy, which can help to reduce demand and keep prices stable. Additionally, by increasing taxes, the government can reduce the amount of disposable income that people have, which can also help to reduce demand and keep prices stable. Overall, the goal of contractionary fiscal policy during an upturn in the business cycle is to help keep the economy stable and prevent inflation.
Learn more about contractionary fiscal policy at https://brainly.com/question/9504329
#SPJ11
king james of scotland briefly outlawed golf because
King james of scotland briefly outlawed golf because three years after James who was already Scotland ascended to the throne, a five-act tragedy called Macbeth was written and given its world premiere in 1606.
The play is based on the life of Macbeth, a historical figure who ruled the Scots from 1040 to 1057 and encountered numerous challenging theological issues both during his reigns in Scotland and England. King james VI of Scotland united the kingdoms of Ireland, scotland, and england after his cousin queen elizabeth I of england passed away.
A move that became known as the "union of the crowns." This even happened after he was crowned king and took charge of the three kingdoms that had been united into one. King James of Scotland had long advocated for the unification of the kingdoms under a single ruler, even before the death of the English monarch Elizabeth 1. However, his proposals were met with indifferent responses, making it unpredictable and challenging for it to actually occur.
complete question:
King james of scotland briefly outlawed golf because will a Stuart family member ascend to the throne as King James I of England?
To know more about Macbeth visit:
https://brainly.com/question/1219640
#SPJ4
how is jonas's understanding of the memories he receives different from his usual way of understanding things
Jonas's understanding of the memories he receives is different from his usual way of understanding things in several ways.
Firstly, Jonas's usual understanding of things is based on his limited personal experiences and the information provided by the community. He relies on what he has been taught and what he observes in his immediate environment. His understanding is largely shaped by the rules and restrictions imposed by the community to maintain conformity and stability.In contrast, when Jonas receives memories, he gains direct access to the experiences, emotions, and knowledge of different people and different times. These memories provide him with a broader and deeper understanding of the world. He can feel sensations, emotions, and perceptions that were previously unknown to him. This expanded understanding challenges his previous limited perspective and allows him to question the norms and values of his communityFurthermore, Jonas's usual understanding is primarily intellectual and conceptual, based on descriptions and explanations.
To learn more about memories click on the link below:
brainly.com/question/30063025
#SPJ11
how does the president direct foreign policy and how can congress check presidential power in this area
The Constitution's Article II is the foundation for the president's power in foreign policy as it is in all other areas.
How can Congress limit the president's ability to make foreign policy?In terms of American foreign policy, the Senate is exceptional. According to the Constitution, the president has the power to ratify treaties, but first he or she must send them to the Senate for a two-thirds vote. A crucial part of this procedure is the Senate Foreign Relations Committee.
If there are enough votes, the legislative branch can overcome the President's veto of a law in the executive branch. In addition to having the authority to approve presidential nominations and manage the budget, the legislative branch also has the right to impeach the President and have him or her formally resign from office.
The Constitution gives senators a significant role in determining American foreign policy by giving them the only authority to advise on and give their permission to candidates for government positions and treaties. Presidents select ambassadors and negotiate treaties, but the Senate decides whether or not to appoint them or ratify the agreements they negotiate.
To know more about presidential power visit:
https://brainly.com/question/27034946
#SPJ4
the rule of law is responsible for the constitutional principle that laws do not apply to government leaders. no person is free to ignore the law. laws must be approved by all voters. the president can change any law.
Answer:
no person is free to ignore the law.Explanation:
The principle of rule of law establishes that every person, institutions, both public and private and the state are all accountable to and subject to the law. No person is free to ignore the law as each and every person is equally liable to law.From the president of the country to any ordinary person, everyone is bound by the law and no person or institution can escape or break the law. It is enforces the practice of 'equality of all before the eyes of law.'___ refers to the measurement of patterns or characteristics found in the human body.
Biometrics refers to the measurement of patterns or characteristics found in the human body.
This is further explained below.
What is biometrics?Generally, Body measurements and mathematical computations relating to human attributes are what is known as biometrics. In the field of computer science, one method of identifying and access control that is utilized is called biometric authentication.
Additionally, it is utilized to identify people inside groups that are being monitored by security personnel.
In conclusion, The measuring of patterns or traits observed in living organisms, such as the human body, is known as biometrics.
Read more about biometrics
https://brainly.com/question/20318111
#SPJ1
research on peer groups during middle childhood shows that __________.
Peer groups during middle childhood have a significant impact on children's social and emotional development. They provide opportunities for socialization, identity formation, and autonomy.
Research has shown that peer groups play a crucial role in middle childhood, as children begin to spend more time with peers than with their families. Peer groups provide opportunities for socialization, identity formation, and autonomy. Children in peer groups learn important social skills, such as sharing, taking turns, and resolving conflicts. They also have the opportunity to explore different roles and identities within the group, which helps them develop a sense of self and independence.
However, peer groups can also have negative effects on children's development if they are not supportive or inclusive. Children who are excluded or bullied by their peers may experience social and emotional difficulties. Therefore, it is important for parents and caregivers to monitor their children's peer interactions and provide support and guidance when needed.
To know more about the peer groups visit:
https://brainly.com/question/31913296
#SPJ11
after surviving a severe automobile accident, rachel reported to her therapist experiencing a sense of being outside of her own body and of seeing the world as though it were a movie that she was watching, rather than participating in. this psychological symptom is known as dissociation. a flashback. hypervigilance. a hallucination.
This psychological symptoms is known as dissociation as she had a sense of being outside of her own body. The right answer is a.
Issues with memory, identity, emotion, perception, conduct, and sense of self are symptoms of dissociative disorders. Every aspect of mental functioning could potentially be affected by dissociative symptoms. Loss of memory or amnesia are two examples of dissociative symptoms, as are the sensation of detachment or feeling as though one is not in one's body.
Traumatic experiences in the past are usually linked to dissociative disorders. Dissociation can assist an individual endure a terrible event, such an accident, that would otherwise be too tough to bear. In these circumstances, a person may mentally run away from the terror, suffering, and horror by dissociating the recollection of the scene, the circumstances, or the sensations related to the overpowering incident.
The correct answer is option a.
Know more about dissociation here
https://brainly.com/question/20430933
#SPJ4
Contextualize the Magna Carta and explain why this was such a revolutionary/influential document.
Answer:
The Magna Carta, also known as the Great Charter, was a charter of liberties to which England’s King John had to agree 1215 under the pressure of the powerful barons that threaten to create a rebellion against the King´s failing foreign policies and onerous taxes.
Explanation:
This document was revolutionary because it placed King John and all of England’s forthcoming kings within a rule of law. It would later be the basis for the English system of the common law, and a symbol of freedom against oppression. Furthermore, in 1776 the Founding Fathers of the United States of America used it as a historical precedent for the independence process.
The Magna carta was such a revolutionary document because it was the document that established the rights of citizens in a place.
The Magna CartaThis was a charter of rights that was written by King John of England. The Charter established the rights of the citizens of England at the time.
This was revolutionary because before now the people had being subject to only the laws of the monarch that governed them. They had no personal rights.
Read more on the magna carta here:
https://brainly.com/question/25378155
one reason historians can rely on government records for accurate historical information?
Answer:
One reason historians can rely on government records for accurate historical information is that government records tends to be telling the truth since these data are also used by the people in that time which requires them to write factual data.
Explanation:
question 6 options: 1) childhood experiences, particularly how unconscious processes affect the developing person. 2) behaviorism, which is concerned with basic principles of learning, such as rewards and punishment. 3) social cognition, which is concerned with how people think about other people and how people think about the social world in general. 4) the exploration of morality, particularly how and why people make moral or less moral decisions.
The Right Choice is (3) Social Cognition which is concerned with how people think about other people and how people think about the social world in general.
Social cognition is a branch of psychology concerned with how people process, store, and apply knowledge about other people and social situations. It deals with the role of cognitive processes in social interaction.
According to social cognitive theory, a person's personality is influenced by what they see in other people's actions. For example, a teenager attends a party and notices that someone who has consumed alcohol does not slur their speech. Social cognition is a branch of psychology concerned with how people process, store, and apply knowledge about other people and social situations. It deals with the role of cognitive processes in social interaction.
According to social cognitive theory, a person's personality is influenced by what they see in other people's actions. For example, when teenagers attend a party, they find that those who have consumed alcohol are more defamatory, more aggressive, and louder than those who have not. Noisier than non-drinkers.
Visit this link to learn more about social cognition
Brainly.com/question/28862370
#SPJ4
Roberto has not thought of his third-grade teacher in over 40 years. According to decay theory, the memory trace for his teacher should be ____.a. availableb. âaccessiblec. unavailabled. available but inaccessible
According to decay theory, the memory trace for Roberto's third-grade teacher should be unavailable after 40 years, as memories that are not reinforced or used over time may fade and decay, making them no longer available for retrieval. Therefore, the correct answer is (c) unavailable.
This means that the memory may no longer be stored in his long-term memory and therefore cannot be retrieved. However, it is important to note that just because a memory is currently unavailable does not necessarily mean it is lost forever.
Memories can potentially be retrieved with the right cues or triggers. Additionally, there may be other factors at play, such as interference or the context in which the memory was encoded, that could also impact the accessibility of the memory trace.
Overall, while decay theory offers some insight into how memories may change over time, memory processes are complex and there is still much to be learned about how and why memories are forgotten or remembered.
To learn more about, reinforced
https://brainly.com/question/1483660
#SPJ11
pls help 43 pts thank you
Topic question: Should reality television shows be banned?
-
I have done the whole thing already i just need help with the conclusion clincher
My claim goes against reality television
Conclusion Clincher: ________
Reality shows may claim to be real but actually they are distorted to hide the truth. There is a purpose of every TV show. Some are comedy based; some provides family drama, some entertainment and so on. Reality shows don’t have any constructive purpose. The reality TV shows proves to the people that being loud and doing all nonsense makes you center of attraction
Answer:
b
Explanation:
compare 2 ways in which destructive relationships may influence your well-being as opposed to constructive relationships
Answer:
1.lack of confidence 2.lack of love for oneself
The comparison of the 2 ways in which destructive relationships may influence your well-being as opposed to constructive relationships are:
They can make a person lose focus.They can stir up bad emotions.What is a Destructive Relationship?This refers to the type of relationship in which there is no peace and there is constant conflict between people.
With this in mind, we can see that if a person is in a destructive relationship, this would make the person to experience negative emotions which can lead to loss of focus.
Read more about destructive relationships here:
https://brainly.com/question/22269302
I NEED HELP ASAP
I will give BRAINLIST to correct answers I really need help fast please
Answer:
conflict might arise due to dissatisfaction between 2 parties, peoplecauses of conflict are ... disagreement,poor communication, ignorance, prejudice....etc......... consequences are:- creative solution,clarify issues.,less effective etc...process of resolving conflict are;-:........... Define the source of the conflict...... Look beyond the incident........... request solutions....... Identify solutions both disputants can support. agreementwhen were jeans invented
A patent for work pants reinforced with metal rivets was granted to San Francisco businessman Levi Strauss and Reno, Nevada, tailor Jacob Davis on May 20, 1873, launching the development of one of the most recognizable clothing items in history: the blue jean.
As the West Coast representative for his family's business, Strauss started a wholesale dry goods company in San Francisco under his own name. In order to feed the quickly growing communities of gold miners and other settlers, his new company imported clothing, fabric, and other dry items to sell in the small businesses emerging throughout California and other Western states.
By 1866, Strauss, a well-known businessman and ally of the Jewish community in San Francisco, had relocated his company to larger headquarters. One of Levi's frequent clients was the Reno, Nevada, tailor Jacob Davis.
He described his process for producing labor pants with metal rivets on the stress points—at the corners of the pockets and the base of the button fly—to make them stronger in a letter to Strauss in 1872. Davis offered that Strauss give the monies and the two men obtain the patent jointly since Davis lacked the money for the requisite documentation. The patent for "Improvement in Fastening Pocket-Openings," which would result in the creation of blue jeans as we know them, was given to both men on May 20, 1873, with Strauss' enthusiastic support.
To know more about Davis:
brainly.com/question/8828674
#SPJ4
what branch of the italian military became more powerful during the 1920s?
Answer:
fascinism
Explanation:
From the end of 1920 on, Fascism fostered the development of what would historically become its most ... Italian War Veterans and the Fascist Seizure of Power.Studies of Italian nationalism in the 1920s and 1930s make it clear that ... reflects far more effective coercive mechanisms from both military and civil.
After aligning itself with Italian conservatives, the fascist party rose to prominence using violence and intimidation, eventually seizing power in Rome in 1922 under the leadership of Benito Mussolini.
The Transcontinental Railroad
The transcontinental railroad was built by the Central Pacific and Union Pacific Railroad Companies. Construction began in 1863. The two companies started on opposite ends of the country and built toward each other for seven years. During that time, both companies overcame many struggles. There were weather delays, and holes had to be cut through mountains. When finished, the railroad was 1,912 miles long and connected the country from coast to coast. Transporting passengers and goods was faster, easier, and less expensive by train.
Use the passage to answer the question.
Which conclusion does this text support?
A. Building the railroad was a difficult process.
B. People preferred riding in wagons to riding by train.
C. The railroad workers enjoyed building the railroad.
D. Building the railroad was an easy process.
dr. gonzalez is a peer reviewer for a manuscript submitted to a journal. he is likely to provide comments on which of the following?
a. The prestige/reputation of the autor
b. How well the general public wll understand the study
c. How well the research was conducted
d. The previous studies from thr same research group
Dr. Gonzalez, a peer reviewer of a manuscript submitted to a journal, is likely to comment on how well the research was conducted. So, the correct answer is option C. How well the research was conducted.
In this role, he would assess the quality and rigor of the study, methodology, data analysis, and the clarity and relevance of the findings. This is because peer review is an essential component of the scientific process, which involves evaluating and critiquing research papers.
Peer reviewers are often experts in their fields and are asked to provide feedback on the quality of the research, its methodology, and its interpretation. They scrutinize each aspect of a manuscript and provide constructive feedback to help authors improve their work.Therefore, the correct option is c. How well the research was conducted.
To know more about research , refer here
https://brainly.com/question/18723483#
#SPJ11
What religious practice did the Inca, Aztec, and Maya have in common?
A.
offering sacrifices to the gods
B.
reading books about the gods
C.
going to the temple on Sundays
D.
worshipping only one god
The religious practice that the Inca, Aztec and Maya civilization have in common is worshipping only one god. The Option D is correct.
What religious belief did Inca Maya and Aztec have in common?A religious beliefs means an ideas and accepted tenets of any religion. While these beliefs are essential to a religion, they are not the entirety of religion but a religion must also have practices and cultural rituals that its adherents engage in.
The belief of Mayan, Aztec and Incan civilizations were all polytheistic with an emphasis on the worship of the sun, this focus on the worship of the sun led to the development of elaborate and quite accurate calendars in all three societies.
Read more about religious practice
brainly.com/question/11541955
#SPJ1
How does the salinity in water change as you move from inland areas out towards to ocean? Be sure to
include the phrase “brackish waters”
Explanation:
the salinity in water changes as you move from inland areas out towards to ocean this is because the salinity level of the ocean is very high.
Elaborate on some of the civic amenities that are looked after by the municipal corporation cities
The civic amenities in a city are provided by the municipality.Some of the important civic amenities are water, sanitation, public transport, electricity, healthcare, clean cooking fuel.
The facilities that are allotted to the general people by the government of India and by the municipal corporations are called civic amenities. The other names of civic amenities are public amenities, public facilities, essential services etc.The important characteristic of a civic amenity is that once it is provided, its benefits can be shared by many people
Civic amenities are services that are provided to the general public by the Indian government and municipal corporations. Public amenities, public facilities, basic services, etc. are other names for civic amenities. The municipality in a city is responsible for providing the public amenities.
Learn more about municipal corporation cities
https://brainly.com/question/14281888
#SPJ4
Analyze the timelines below and answer the question that follows.
4 undated timelines. Events listed in order. Timeline 1: Treaty of Paris, Quebec City founded, capital of New France, Dominion of Canada established, Quebec Act. Timeline 2: Dominion of Canada established, Treaty of Paris, Quebec Act, Quebec City founded, capital of New France. Timeline 3: Quebec Act, Quebec City founded, capital of New France, Treaty of Paris, Dominion of Canada established. Timeline 4: Quebec City founded, capital of new France, Treaty of Paris, Quebec Act, Dominion of Canada established.
Which of the timelines above accurately represents the order of historical events in Canadian history?
A.
One (1)
B.
Two (2)
C.
Three (3)
D.
Four (4)
Three (3) represent the right order of the historical events in Canadian history.
Quebec City was founded in1608 by the French explorer Samuel de Champlain, the foundation of the city is a form of colonization of foreign land by European powers.The capital of New France- was proclaimed in 1712.The Treaty of Paris concluded in 1763.Quebec Act - procedure for government in province was passed in the British parliament in 1774The Dominion of Canada was established on the 1st of July 1867 as a self-governing state but under the titular queen of Britain.To learn more about the history of Canada please click on the link https://brainly.com/question/2165528
#SPJ1
Benjamin Harrison was the grandson of which US President?
a
William Johnson
Grover Cleveland Harrison
Hank Harrison
с
Od
William Henry Harrison
Answer:
He was the grandson of the ninth President, William Henry Harrison.
Explanation:
Which of these is NOT a capital city? is it abuja,cairo,kinshasa,johannnesburd
Johannesburg but it is a capital of the province of Gauteng
help on this
pls pls
when you have a conversation with someone from another culture, you can reduce misunderstandings if you ______
When having a conversation with someone from another culture, you can reduce misunderstandings if you employ active listening techniques.
It is important to listen carefully and pay attention to what the other person is saying. Responding to the other person's statements can also demonstrate that you have heard and understood what they have said.
The use of nonverbal communication, such as nodding, smiling, and making eye contact, can also show that you are interested in what they are saying.
Active listening is a skill that can be developed over time. It involves being present in the moment and focusing on the conversation at hand. It requires you to be patient, respectful, and open-minded. It is also important to ask questions and seek clarification if you are unsure about something.
This can help to prevent misunderstandings and ensure that both parties are on the same page. In conclusion, active listening is a valuable tool for reducing misunderstandings when communicating with people from different cultures.
To know more about listening techniques, refer here:
https://brainly.com/question/2513114#
#SPJ11
Which of the following statements best characterizes farming in the Sahara?
A. There is no farming at all in the Sahara.
B. There are isolated pockets of farming, generally around rivers and oases, which are used for
irrigation
C. There are no sources of irrigation, so people in the Sahara depend on rainfall to water their
crops.
D. There is widespread farming throughout the Sahara region, as the climate is well suited for
growing crops.
Answer:
b
Explanation:
i took the test.
The river that is labeled with the number 1 on the map above is the __________ River.
The Mississippi River is indicated on the map above as the river with the number 1.
On the map provided, the number 1 is located near the river that flows southward through the central United States. This is the Mississippi River, which is one of the longest rivers in North America. It flows from Minnesota to Louisiana and is a major transportation and trade route.
Climate change is a major factor in the Mississippi River's drying up. It is thought that the megadrought currently ravaging mostly the western portion of the United States is primarily due to high temperatures, which implies global warming. The absence of rain would be the second-biggest cause.
To Know more about United States
https://brainly.com/question/1527526
#SPJ11
Which of the following is not a management function?
Select one:
a. Controlling
b. Directing
c. Planning
d. Constraining
Answer:
The answer is D. Constraining.
Explanation: