Answer:
Earned value is a measure which is used on projects to determine the value of work which has been completed to date, in order to understand how the project is performing on a cost and schedule basis. At the beginning of a project, a project manager or company will determine their budget at completion (BAC) or planned value (PV).
Explanation:
What infection type can send information on how you use your computer to a third party without you realizing it
Answer:
Spyware collects your personal information and passes it on to interested third parties without your knowledge or consent. they also install trojan horses
Explanation:
In the ____ model, each computer in a network can act as a server for all the other computers, sharing files and access to devices.
Answer:
peer to peer
Explanation:
i just know
In a peer-to-peer model, each computer in a network can act as a server for all the other computers, sharing files and access to devices.
What do you mean by Computer Network?Computer Network may be defined as a type of system that significantly connects two or more computing devices with the intention of transmitting and sharing information with one another. In a more simple sense, there is an interconnection between computing devices.
In a peer-to-peer networking model, a group of computers are linked together with having equal responsibilities for the processing of data and information. Each computer is capable to initiate a command that has to be followed by the rest.
Therefore, in a peer-to-peer model, each computer in a network can act as a server for all the other computers, sharing files and access to devices.
To learn more about the peer-to-peer model, refer to the link:
https://brainly.com/question/9315259
#SPJ2
Your colleague has made a suggested change to an important document you are both working
You disagree with their suggested change. They will be reviewing the changes you make before
the final version of the document is submitted to your boss. You both work remotely and are in
radically different time zones. What is the best step to take next?
Answer:
come to an agreement with your partner on how you can modify or change the suggested change
Explanation:
The best step to take is to set up a virtual meeting between both of you, find out why the reason for the disagreement, and then settle the issues.
What is the virtual meeting about?Based on the fact that both of you cannot physically meet since both are in different location, the right thing to do is to set up a computer virtual meeting.
Conclusively, the parties involved can trash out issues and misconceptions before submitting to your boss.
Learn more about document from
https://brainly.com/question/16650739
#SPJ2
What symbol should you look for to determine who owns the intellectual property of a website?
Answer:
the logo of the company or corporation
Explanation:
Usually, the symbol that determines who owns the intellectual property is the logo of the company or corporation. The logo of a website is technically the logo of the brand which has the rights to all of the information represented on the site and ultimately the intellectual property of the site itself. Since there are various board members that usually make up the company that owns the intellectual property, the logo is a way of representing all of these members as a single entity.
Answer: D the copyright symbol
Explanation: I hope this helps you out
C programming 3.26 LAB: Leap year
A year in the modern Gregorian Calendar consists of 365 days. In reality, the earth takes longer to rotate around the sun. To account for the difference in time, every 4 years, a leap year takes place. A leap year is when a year has 366 days: An extra day, February 29th. The requirements for a given year to be a leap year are:
1) The year must be divisible by 4
2) If the year is a century year (1700, 1800, etc.), the year must be evenly divisible by 400; therefore, both 1700 and 1800 are not leap years
Some example leap years are 1600, 1712, and 2016.
Write a program that takes in a year and determines whether that year is a leap year.
Ex: If the input is 1712, the output is:
1712 - leap year
The code below is in Java. It uses if else structure and modulo operator to check if a given year is a leap year or not. Recall that modulo operator is used to get the remainder of the division. ⇒ a % b = remainder.
What is C programming?The general-purpose programming language C is effective. The creation of software such as operating systems, databases, compilers, and other tools is possible with it. C is a great language for beginners to learn programming with.
These C tutorials will lead you step-by-step as you learn C programming.
Low-level memory access, a small collection of keywords, and a clean style are the fundamental characteristics of the C programming language, which makes it ideal for system programming like operating system or compiler development.
Therefore, The code below is in Java. It uses if else structure and modulo operator to check if a given year is a leap year or not. Recall that modulo operator is used to get the remainder of the division. ⇒ a % b = remainder.
To learn more about C programming, refer to the link:
https://brainly.com/question/10895516
#SPJ1
Three friends decide to rent an apartment and split the cost evenly. They each paid $640 towards the total move in cost of first and last month's rent and a security deposit. If rent is $650 per month, how much was the security deposit?
a.
$10
b.
$207
c.
$620
d.
$1,270
Please select the best answer from the choices provided
Answer:
c. $620
Explanation:
To find the cost of the security deposit, we need to subtract the amount paid towards the first and last month's rent from the total move-in cost.
Each friend paid $640 towards the total move-in cost, which includes the first and last month's rent and the security deposit. Since they split the cost evenly, the total move-in cost is 3 times $640, which is $1920.
The monthly rent is $650 per month, so the first and last month's rent combined is 2 times $650, which is $1300.
To find the security deposit, we subtract the first and last month's rent from the total move-in cost:
Security deposit = Total move-in cost - First and last month's rent
Security deposit = $1920 - $1300
Security deposit = $620
Therefore, the security deposit was $620.
Option c. $620 is the correct answer.
Write a program Using loops to display the following patterns –
(i)
**********
(ii)
*******************
(iii)
*
**
***
****
*****
******
*******
********
*********
**********
(iv)
*
**
***
****
*****
******
*******
********
*********
**********
***********
************
*************
**************
***************
****************
*****************
******************
*******************
********************
(v)
*********
*********
********
*******
******
*****
****
***
**
*
(vi)
********************
*******************
******************
*****************
****************
***************
**************
*************
************
***********
**********
*********
********
*******
******
*****
****
***
**
*
Your program should use loops to display all 6 patterns with one execution.
Input from the keyboard: the number of rows,
the number of asterisks in the first row,
1 to increment asterisks in each following row, or
-1 to decrement the number in following rows, or
0 to keep the same number as in the first row.
Sample screen dialog and output
HOMEWORK 5 Part 1
Enter the number of rows 1
Enter the number of asterisks in the first row 10
Enter 1 if you want *'s to increase on each row, -1 for decrease, 0 for no increase 0
**********
Enter the number of rows 1
Enter the number of asterisks in the first row 20
Enter 1 if you want *'s to increase on each row, -1 for decrease, 0 for no increase 0
********************
Enter the number of rows 10
Enter the number of asterisks in the first row 1
Enter 1 if you want *'s to increase on each row, -1 for decrease, 0 for no increase 1
*
**
***
****
*****
******
*******
********
*********
**********
Enter the number of rows 20
Enter the number of asterisks in the first row 1
Enter 1 if you want *'s to increase on each row, -1 for decrease, 0 for no increase 1
*
**
***
****
*****
******
*******
********
*********
**********
***********
************
*************
**************
***************
****************
*****************
******************
*******************
********************
Enter the number of rows 10
Enter the number of asterisks in the first row 10
Enter 1 if you want *'s to increase on each row, -1 for decrease, 0 for no increase -1
**********
*********
********
*******
******
*****
****
***
**
*
Enter the number of rows 20
Enter the number of asterisks in the first row 20
Enter 1 if you want *'s to increase on each row, -1 for decrease, 0 for no increase -1
********************
*******************
******************
*****************
****************
***************
**************
*************
************
***********
**********
*********
********
*******
******
*****
****
***
**
*
Programmer: insert your name here
Answer:mm, no se como
Explanation:ayudarte
pls helppp <3 In the following nested loop structure, which loop does the program EXIT first?
for (initialization 1; condition 1; loop variable 1 increment;)
for (initialization 2; condition 2; loop variable 2 increment;)
for (initialization 3; condition 3; loop variable 3 increment;)
for (initialization 4; condition 4; loop variable 4 increment;)
{ statement block;}
A.
for (initialization 1; condition 1; loop variable 1 increment;)
B.
for (initialization 2; condition 2; loop variable 2 increment;)
C.
for (initialization 3; condition 3; loop variable 3 increment;)
D.
for (initialization 4; condition 4; loop variable 4 increment;)
Answer:
D. The 4th one
Explanation:
The loops are nested, and the program ends when loop 1 is completed. Since loop 4 is the innermost one, that one is completed first.
Which of the following statements about markup languages is true?
• Markup languages are used to write algorithms.
Markup languages are used to structure content for computers to interpret
JavaScript is an example of a markup language.
Markup languages are a type of programming language.
The most widely used markup languages are SGML (Standard Generalized Markup Language), HTML (Hypertext Markup Language), and XML (Extensible Markup Language).
B .Markup languages are used to structure content for computers to interpret is true.
What is a markup language in programming?A markup language is a type of language used to annotate text and embed tags in accurately styled electronic documents, irrespective of computer platform, operating system, application or program.
What does a markup language used to identify content?Hypertext markup language is used to aid in the publication of web pages by providing a structure that defines elements like tables, forms, lists and headings, and identifies where different portions of our content begin and end.
To learn more about A markup language, refer
https://brainly.com/question/12972350
#SPJ2
Python help
Instructions
Write a method swap_values that has three parameters: dcn, key1, and key2. The method should take the value in
the dictionary den stored with a key of key1 and swap it with the value stored with a key of key2. For example, the
following call to the method
positions = {"C": "Anja", "PF": "Jiang", "SF": "Micah", "PG": "Devi", "SG": "Maria")
swap_values (positions, "C", "PF")
should change the dictionary positions so it is now the following:
{'C': 'Jiang', 'PF': 'Anja', 'SF': 'Micah', 'PG': 'Devi', 'SG': 'Maria')
def swap_values(dcn, key1, key2):
temp = dcn[key1]
dcn[key1] = dcn[key2]
dcn[key2] = temp
return dcn
The method in the interface for a dictionary collection returns an iterator on the key/value pairs in the dictionary is the Keys () method.
Consider the scenario where you want to develop a class that functions like a dictionary and offers methods for locating the key that corresponds to a specific target value.
You require a method that returns the initial key corresponding to the desired value. A process that returns an iterator over those keys that map to identical values is also something you desire.
Here is an example of how this unique dictionary might be used:
# value_dict.py
class ValueDict(dict):
def key_of(self, value):
for k, v in self.items():
if v == value:
return k
raise ValueError(value)
def keys_of(self, value):
for k, v in self.items():
if v == value:
yield k
Learn more about Method on:
brainly.com/question/17216882
#SPJ1
QUESTION 7
Any use of a direct quote or paraphrased idea does not need to be cited properly in APA style.
O True
O False
6 + 7 = 7 + 6 is an example of which property of addition?
Answer:
commutative
Explanation:
The commutative property states that the numbers on which we operate can be moved or swapped from their position without making any difference to the answer.
11. is a feature in Windows that can help you stay in control of your computer by informing you when a program makes a change that requires administrator-level permission.
Answer:
User Account Control (UAC) is a feature of Windows that can help you stay in control of your computer by informing you when a program makes a change that requires administrator-level permission.
In reinforcement learning, an episode:
In reinforcement learning, an episode refers to a sequence of interactions between an agent and its environment. It represents a complete task or a single run of the learning process.
The reinforcement learningDuring an episode, the agent takes actions in the environment based on its current state. The environment then transitions to a new state, and the agent receives a reward signal that indicates how well it performed in that state. The agent's objective is to learn a policy or a strategy that maximizes the cumulative reward it receives over multiple episodes.
The concept of episodes is particularly relevant in episodic tasks, where each episode has a clear start and end point.
Read more on reinforcement learning here:https://brainly.com/question/21328677
#SPJ1
What federal law requires manufacturers to put care labels on their garments and fabrics sold by the yard?
Search the Internet and scan IT industry magazines or Web sites to find an example of an IT project that had problems due to organizational issues. Write a short paper summarizing the key stakeholders for the project and how they influenced the outcome.
This system aimed to replace an obsolete technology jumble with a more advanced system for earnings monitoring and paychecks for 95,000 teachers, managers, custodians, and other district staff, though and it didn't work and from the start of the project, code bugs and flaws arose.
The Los Angeles Unified School District faced a problem in Jan 2007.For a $95 million project, they developed SAP software. Some professors were unpaid, some overpaid, some unpaid.The school system needed a year and a further $37m to correct the problems. Downtown and Deloitte decided in November of 2008 to resolve a dispute over the work with the contractor agreeing to return $8.25 million in overdue invoices to forgive $7 million to $10 million.The parties involved did the right thing in this case by bringing the subject to the public. It helped create the result they wanted in this way. The proceedings were filed, even if customers did not have their money back, but at minimum people received some reimbursements.Learn more:
brainly.com/question/11489632
Write a program that asks the user to enter the size of a triangle (an integer from 1 to 50). Display the triangle by writing lines of asterisks. The first line will have one asterisk, the next two, and so on, with each line having one more asterisk than the previous line, up to the number entered by the user. On the next line write one fewer asterisk and continue by decreasing the number of asterisks by 1 for each successive line until only one asterisk is displayed. (Hint: Use nested for loops; the outside loop controls the number of lines to write, and the inside loop controls the number of asterisks to display on a line.) For example, if the user enters 3, the output would be:_______.a. *b. **c. ***d. **e. *
Answer:
Implemented using Python
n = int(input("Sides: "))
if(n>=1 and n <=50):
for i in range(1,n+1):
for j in range(1,i+1):
print('*',end='')
print("")
for i in range(n,0,-1):
for j in range(i,1,-1):
print('*',end='')
print("")
else:
print("Range must be within 1 and 50")
Explanation:
This line prompts user for number of sides
n = int(input("Sides: "))
The line validates user input for 1 to 50
if(n>=1 and n <=50):
The following iteration uses nested loop to print * in ascending order
for i in range(1,n+1):
for j in range(1,i+1):
print('*',end='')
print("")
The following iteration uses nested loop to print * in descending order
for i in range(n,0,-1):
for j in range(i,1,-1):
print('*',end='')
print("")
The following is executed if user input is outside 1 and 50
else:
print("Range must be within 1 and 50")
XYZ is a well-renowned company that pays its salespeople on a commission basis. The salespeople each receive 700 PKR per week plus 9% of their gross sales for that week. For example, a salesperson who sells 4000 PKR worth of chemicals in a week receives 700 plus 9% of 5000 PKR or a total of 1060 PKR. Develop a C++ program that uses a Repetitive Structure (while, for, do-while) to manipulate each salesperson’s gross sales for the week and calculate and displays that salesperson’s earnings.
Answer:
#include<iostream>
#include<conio.h>
using namespace std;
float calculateGross(float sale)
{
return (sale/100*9) + 700;
}
main()
{
float sale[3] = { 5000,7000,9000}, Totalsale =0;
for(int i=0; i<=2; i++)
{
cout<<"Sales Person "<<i+1<<" Gross Earnings: "<<calculateGross(sale[i])<<" PKR\n";
Totalsale += calculateGross(sale[i]);
}
cout<<"Total Gross Sales Earnings for week: "<<Totalsale<<" PKR\n";
return 0;
}
Coulomb's law can be used to calculate the _____________.
Answer:
the electrostatic force between two charged objects
Write code that outputs variable numCats. End with a newline.
Answer:
#include <iostream>
#include <cmath>
using namespace std;
int main() {
int numCats;
cin>>numCats;
cout<<numCats<<endl;
Explanation:
Why are iterators useful?
Select one:
a. Iterators prevent infinite loops
b. Iterators are easier to loop over than a while loop
c. Iterators walk down a collection faster than a for loop.
d. Iterators give you direct access to private variables.
e. Improve information hiding by not revealing how a collection class is implemented
Fritz is a big fan of the racerville rockets. unfortunate;y, the team has been accused of cheating during their games. Fritz reads many articles and posts about this developing news story. His social media algorithms have "learned" that he's a fan of the team, so his feed doesnt show him any articles that argue the accusations are true. From this, Fritz decides his favorite team must be innocent of all cheating charges. Fritz is now in
A. a filter bubble
B. A third party
C. A subculture
D. an echo chamber
Option(D) is the correct answer. Fritz is now in an echo chamber.
Fritz's situation aligns with the concept of an echo chamber. An echo chamber refers to an environment, such as social media, where individuals are exposed to information and opinions that reinforce their existing beliefs and perspectives.
In this case, Fritz's social media algorithms have filtered out articles that present arguments in favor of the cheating accusations, creating an echo chamber that only confirms his preconceived notion of the team's innocence.
As a result, Fritz is insulated from diverse viewpoints and alternative perspectives, which can hinder critical thinking and a comprehensive understanding of the situation.
for similar questions on Fritz.
https://brainly.com/question/5100081
#SPJ8
While it might be considered "old-school," which action should you take if you are unsure how a page will print, even after looking at Page Break Preview?a) Slide the solid blue line.b) Slide the dotted line.c) Print the first page.d) Eliminate page breaks.
Answer:
The correct answer is D
In the case of printing pages when you are not sure of the number of the page the printer will print you should leave some gaps or margins or leave space between the two pages.
The old-school way to do this is by Printing the first page. Hence the option C is correct.Learn more bout the might be considered "old-school,".
brainly.com/question/26057812.
Difference between computer hardware and computer software
Answer: Computer hardware is computer parts for the computer such as keyboards, mouses, and monitors. Computer software is a program on the computer where you can download it and that software you downloaded adds data to the computer that tells it how to work, etc.
Hope this helps :)
Explanation: N/A
Explain the main concept of Artificial Neural networks (ANN) as a set of layers that starts with an input layer that has sensors and the output layer that gives the predicted result (predictions) with hidden layers in between based on the ANN architecture and its specific type of application Knowledge One Individual Practical Assignment
Artificial Neural networks is a computational tool that is made up of a let of processing elements that takes in inputs and deliver outputs using a predefined activation codes.
What are the layers in an artificial neural network?There are 3 Artificial olfactory sense and recognition system that are found in ANN. It is made up of:
An input layer.An Hidden layer.An Output layer.Note that these layers above help to tell more about the Artificial Neural networks (ANN).
Learn more about Artificial Neural networks (ANN) from
https://brainly.com/question/25653113
Write a C++ program that takes a single character and prints the corresponding digit on the old-style dial or touchtone telephone keypad, if it exists, or a message stating that the character does not correspond to a digit on the keypad.
HELP ASAP
Certain programs are designed to analyze electronic scans of documents such as receipts, business cards and recipes, and allow information from these paper copies to be represented electronically. In order for such a program to understand the difference between, for example, a zip code and a phone number or between the price of an item and the total bill for a shopping trip, certain rules must be put into place. If a program was trying to identify which part of a receipt is the date of purchase, which of the follow probably would NOT be included as part of these rules?
A. Locate any sets of digits with the following format -- _ _ / _ _/ _ _ -- where the underscores represent numerical values.
B.Identify if there are any month names on the receipt (January, February, March, etc…).
C. Search for the numbers 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 or 12 anywhere on the receipt.
D. Look for the following format of numbers -- 19_ _ or 20_ _ -- where the underscores represent numerical values.
Answer:
C. Search for the numbers 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 or 12 anywhere on the receipt.
Explanation:
help!!!!!!
hhhhhhhhh
Answer:
A
Explanation:
What is this screen called? (I attached a picture)
A. Graph Screen
B. Y Editor Screen
C. Table Screen
D. Window Screen
Answer:
i believe it's a y editor screen
ARAT ML MGA LODS
ID:426667817