The volume of a cube with a 9 m side is 729 cubic meters
The volume of a cube with an 8 in side is 512 cubic inches
The volume of a rectangular prism with the given length 5 ft., width 5 ft., height 7 ft is 175 cubic feet
The volume of a rectangular prism with the given length 10 ft., width 4 ft., height 5 ft is 200 cubic feet
The volume of a cube with a 9 m side:
V = s³
= 9³
= 729 cubic meters
The volume of a cube with an 8 in side:
V = s³
= 8³
= 512 cubic inches
The side of a cube with a volume of 343 cu.ft.:
s = cube root of V = cube root of 343 = 7 feet
The volume of a rectangular prism with the given length 5 ft., width 5 ft., height 7 ft.:
V = lwh
= 5 x 5 x 7
= 175 cubic feet
The volume of a rectangular prism with the given length 10 ft., width 4 ft., height 5 ft
V = lwh = 10 x 4 x 5 = 200 cubic feet
To learn more on Three dimensional figure click:
https://brainly.com/question/2400003
#SPJ1
the area of a square field is 50625 meter square find its perimeter
Answer:
900
Step-by-step explanation:
A=S^2
50265=SxS
S=√50265
S=225
P=Sx4
P=225x4
P=900
What is necessary to determine the z-score for a raw score in a particular set of scores?.
Answer:
See below
Step-by-step explanation:
The mean score and the standard deviation are needed
A blueprint for a cottage has a scale of 1:40 one room measures 3.4 m by 4.8 . calculate the dimensions of the room on the blueprint.
I need students to solve it, with operations
The actual dimension of the room on the blueprint is 136 meters by 192 meters
From the question, we have the following parameters that can be used in our computation:
Scale ratio = 1 : 40
This means that the ratio of the scale to the actual is 1:40
Also, from the question. we have
One room measures 3.4 m by 4.8 .
This means that
Actual length = 40 * 3.4 meters
Actual width = 40 * 4.8 meters
Using the above as a guide, we have the following:
We need to evaluate the products to determine the actual dimensions
So, we have
Actual length = 136 meters
Actual width = 192 meters
Hence, the actual dimension is 136 meters by 192 meters
Read more about ratio at
brainly.com/question/21003411
#SPJ1
the expected value of an unbiased estimator is equal to the parameter whose value is being estimated. true/false
The statement "the expected value of an unbiased estimator is equal to the parameter whose value is being estimated" is true.
An estimator is a function of the sample data used to estimate the value of a population parameter. An estimator is said to be unbiased if its expected value is equal to the true value of the population parameter. In other words, if we were to repeatedly take samples from the population and calculate the estimator for each sample, the average value of the estimator over all the samples would be equal to the true value of the population parameter. The expected value of an unbiased estimator is a key property because it ensures that the estimator is not systematically overestimating or underestimating the population parameter. Instead, the estimator provides an unbiased estimate of the population parameter on average across all possible samples. It is important to note that not all estimators are unbiased. Biased estimators may systematically overestimate or underestimate the population parameter, leading to incorrect conclusions. Therefore, unbiasedness is a desirable property for an estimator to have.
To learn more about population parameter click here
brainly.com/question/30689789
#SPJ4
OFFERING BRAINLIEST TO STEP BY STEP EXPLANATION
Answer:
\(112cm^2\)
Step-by-step explanation:
Volume of a rectangluar prism = Length x Width x Height
Volume, Length, and Width is given now we can solve for Height, c
\(V = l * w * h\)
\(80m^3 = 4m * 4m * h\)
\(h = 80m^3 / 16m^2\)
\(h = 5m\)
Surface area of a rectangular prism is A = 2(wl +hl +hw)
\(A = 2(4m * 4m + 5m * 4m + 5m * 4m)\)
\(= 2(16m^2 + 20m^2 + 20m^2)\)
\(= 2(56cm^2)\\A= 112cm^2\)
Hope this helps!
Brainliest is much appreciated!
supongo q es es 8 cm pero no creo q sería 2 o l
Can someone please help me with this?
Show work please
The closet square inch that is needed to cover the cuboid is 208 inches ( option A)
What is surface area of a cuboid?A cuboid is defined as a three-dimensional shape, that has six rectangular faces, eight vertices and twelve edges.
The surface area of cuboid is given as;
SA = 2(lb+lh+bh)
lb = 33/4 × 4 = 33 in
lh = 23/4 × 4 = 23 in
bh = 23/4 × 33/4 = 759/16
SA = 2( 23+33+759/16)
SA = 46+66+47.44
SA = 207 in
therefore the closet square inches is 208 in²
learn more about surface area of cuboid from
https://brainly.com/question/26403859
#SPJ1
Dr. Nielsen evaluated Kris when he was 2-years-old and Dr. Perry evaluated him when he was 6-years-old. Both diagnosed him with an intellectual disability and ADHD. This is known as which type of reliability
The type of reliability being referred to in this scenario is inter-rater reliability. This means that multiple raters (in this case, Dr. Nielsen and Dr. Perry) are assessing the same individual and producing consistent results in their diagnoses.
The question is about the type of reliability when Dr. Nielsen evaluated Kris at 2-years-old and Dr. Perry evaluated him at 6-years-old, with both diagnosing him with an intellectual disability and ADHD.
The type of reliability in this scenario is known as inter-rater reliability. Inter-rater reliability refers to the consistency of measurements when different evaluators assess the same individual or situation. In this case, both Dr. Nielsen and Dr. Perry independently came to the same diagnosis, demonstrating a high level of inter-rater reliability.
Inter-rater reliability is an important aspect of psychological and diagnostic assessments as it provides confidence in the consistency of the evaluations conducted by different professionals. When multiple evaluators reach similar conclusions, it enhances the reliability and validity of the diagnoses made.
To know more about inter-rater reliability refer here:
https://brainly.com/question/31715825#
#SPJ11
A newly appointment school district superintendent releases a plan for the next 20 years that affects the schools within the boundaries of the district. In this plan, there is new policy that states that if a high school has less than 100 students, then the school will be shut down. Calamanco High School has a population of 1,417 students, but it is losing students at an average rate of 109 students per year. This school used to house more than 5,000 students but the district has been struggling in recent years and losing people to more affluent nearby districts and cities. Some communities are concerned about this decreasing rate because there will be a time when the district may shut the school down. Let x represent the number of full years that the school is operational.
Answer:1417-109x<100
Step-by-step explanation:
Review the graph. A student spends 16.5 hours studying and receives a mark of 61.4%. Which statement describes this result?
Using the line of best fit, the correct statement that describes this result is given by:
D. The result is an outlier and there is no gap in the data.
What is the missing information?The statements are missing, and are given as follows:
A. The result is not an outlier and there is a gap in the data.
B. The result is not an outlier and there is no gap in the data.
C. The result is an outlier and there is a gap in the data.
D. The result is an outlier and there is no gap in the data.
What does the line of best fit mean?The line of best fit gives the expected exam score for a student that studies x hours. For example, for a student that studies 16 hours, the expected score is of 90.
The actual score is 61.4%, which is significantly less than the expected score, meaning that there is an outlier. However, there are no gaps in the data-set, as as the line considers students between 0 and 20 hours, and 16 is in this interval.
This means that option D is correct.
More can be learned about a line of best fit at https://brainly.com/question/22992800
#SPJ1
Today, Andrew borrowed R200 000 from a bank. The bank charges interest at 5.25%p.a, a compounded quarterly. Andrew will make make payments of R6 000 at the end of 3 months. His first repayment will be made 3 months from now, how long in years will it take for Andrew to settle the loan
In order to calculate the time it will take for Andrew to settle the loan, we can use the formula for compound interest. So, it will take Andrew approximately 5.22 years to settle the loan.
The formula is given as A = P(1 + r/n)^(nt), Where: A = the final amount, P = the principal (initial amount borrowed), R = the annual interest rate, N = the number of times the interest is compounded in a year, T = the time in years.
We know that Andrew borrowed R200 000 from a bank at an annual interest rate of 5.25% compounded quarterly and that he will make repayments of R6 000 at the end of every 3 months.
Since the first repayment will be made 3 months from now, we can consider that the initial loan repayment is made at time t = 0. This means that we need to calculate the value of t when the total amount repaid is equal to the initial amount borrowed.
Using the formula for compound interest: A = P(1 + r/n)^(nt), We can calculate the quarterly interest rate:r = (5.25/100)/4 = 0.013125We also know that the quarterly repayment amount is R6 000, so the amount borrowed minus the first repayment is the present value of the loan: P = R200 000 - R6 000 = R194 000
We can now substitute these values into the formula and solve for t: R194 000(1 + 0.013125/4)^(4t) = R200 000(1 + 0.013125/4)^(4t-1) + R6 000(1 + 0.013125/4)^(4t-2) + R6 000(1 + 0.013125/4)^(4t-3) + R6 000(1 + 0.013125/4)^(4t)
Rearranging the terms gives us: R194 000(1 + 0.013125/4)^(4t) - R6 000(1 + 0.013125/4)^(4t-1) - R6 000(1 + 0.013125/4)^(4t-2) - R6 000(1 + 0.013125/4)^(4t-3) - R200 000(1 + 0.013125/4)^(4t) = 0
Using trial and error, we can solve this equation to find that t = 5.22 years (rounded to 2 decimal places). Therefore, it will take Andrew approximately 5.22 years to settle the loan.
For more questions on: compound interest
https://brainly.com/question/31474686
#SPJ8
Can someone please write this as a single logarithm and show work please and thank you
Answer:
\(log_b(w^3y^4)\)
Step-by-step explanation:
To write the expression as a single logarithm, or condense it, use the properties of logarithms.
1) The power property of logarithms states that \(log_ax^r = rlog_ax\). In other words, the exponent within a logarithm can be brought out in front so it's multiplied by the logarithm. This means that the number in front of the logarithm can also be brought inside the logarithm as an exponent.
So, in this case, we can move the 3 and the 4 inside the logarithms as exponents. Apply this property as seen below:
\(3log_bw+4log_by\\=log_bw^3+log_by^4\)
2) The product property of logarithms states that \(log_axy = log_ax+log_ay\). In other words, the logarithm of a product is equal to the sum of the logarithms of its factors. So, in this case, write the expression as a single logarithm by taking the log (keep the same base) of the product of \(w^3\) and \(y^4\). Apply the property as seen below and find the final answer.
\(log_bw^3+log_by^4\\=log_b(w^3y^4)\)
So, the answer is \(log_b(w^3y^4)\).
Write the equation of a line, in slope-intercept form, that has a slope of m=6 and passes through the point (3, 11) . Enter your answer in the box. Please help and hurry!
Answer:
Step-by-step explanation:
y - 11 = 6(x - 3)
y - 11 = 6x - 18
y = 6x - 7
1. A pair of shoes is regularly priced at $52. They are on sale for 15%
off the regular price. What is the sale price of the shoes?
\(52 \times 0.15 = 7.8\)
\(52 - 7.8 = 44.20\)
The sale price of the shoes is $44.20
Answer:
52*15/100=7.8$ so u will take away 7.8$ from 52$=44.2$ he has to pay.
4 = 2 (-2 - a) + a
Find A and please explain how to do it
The required value of variable "a" would be -8 which is determined by the distributive property of multiplication,
What is the equation?The term "equation" refers to mathematical statements that have at least two terms with variables or integers that are equal.
The equation is below which is given in the question,
4 = 2(-2 - a) + a
Apply the distributive property of multiplication,
4 = 2 × -2 - a × 2 + a
4 = - 4 - 2a + a
Rearrange the likewise terms and apply the arithmetic operation,
- 2a + a = 4 + 4
- a = 8
Multiply by the (-) sign on both sides to get the answer,
a = -8
Hence, the required value of variable "a" is -8.
Learn more about the equations here:
brainly.com/question/10413253
#SPJ1
A bicycle repair shop offers two service packages to its customers: a tune up or a complete overhaul, which includes the tune up plus some additional services. All bicycles go through wheel balancing before leaving the shop. The repair shop is open 60 hours per week and receives an average of 180 bicycles each week. The shop employs three "tune up" technicians, one "additional services" technician, and two wheel balancing" specialists. Past data indicates that 25% of customers opt for the "additional services" option. Wheel Tune Up Balancing T = 75 T= 20 minutes minutes Additional Services T = 72 minutes a) Create a demand matrix for this process b) What will be the daily capacity at each stage of the process? c) Find the implied utilizations for each stage of the process. d) What will be the weekly capacity of the process? e) Is the flow rate of this process capacity-constrained or demand-constrained?
A bicycle repair shop that offers two service packages: a tune-up and a complete overhaul.
The shop operates for 60 hours per week and receives an average of 180 bicycles each week. To analyze the capacity and utilization of the process, we need to consider the time taken at each stage and the demand for each service option. We'll break down the problem into multiple parts and provide a detailed explanation using mathematical terms.
a) Creating the Demand Matrix:
To create a demand matrix, we need to determine the number of bicycles going through each stage of the process. Let's denote the demand for tune-up as T and the demand for additional services as A.
Given that the average number of bicycles received per week is 180 and 25% of customers opt for additional services, we can calculate the demands as follows:
Demand for tune-up (T) = Total demand - Demand for additional services
T = 180 - (0.25 * 180)
T = 180 - 45
T = 135
Demand for additional services (A) = 0.25 * Total demand
A = 0.25 * 180
A = 45
Now, we can create a demand matrix based on the demand for each service option:
Demand Matrix:
Tune-up Additional Services Wheel Balancing
Tune-up [135 0 0]
Additional [0 45 0]
Services
Total [ 135 45 0 ]
The demand matrix shows the number of bicycles flowing through each stage of the process.
b) Daily Capacity at Each Stage:
To calculate the daily capacity at each stage, we need to consider the time taken for each service option. Given that the shop operates for 60 hours per week, we can calculate the daily capacity at each stage:
Tune-up technician time per bicycle (\(T_{tuneup}\)) = 75 minutes
Additional services technician time per bicycle (\(T_{additional}\)) = 72 minutes
Wheel balancing specialist time per bicycle (\(T_{balancing}\)) = 20 minutes
Daily Capacity (C) = (60 hours * 60 minutes) / (\(T_{tuneup}\) + \(T_{additional}\) + \(T_{balancing}\))
Substituting the given values:
C = (60 * 60) / (75 + 72 + 20)
C = 21600 / 167
C ≈ 129.34 bicycles per day
Therefore, the daily capacity at each stage of the process is as follows:
Tune-up: 129 bicycles per day
Additional Services: 129 bicycles per day
Wheel Balancing: 129 bicycles per day
c) Implied Utilizations:
To find the implied utilizations, we need to compare the demand and the capacity at each stage of the process. Utilization can be calculated as the demand divided by the capacity.
Implied Utilization (U) = Demand / Daily Capacity
For the Tune-up stage:
\(U_{tuneup}\) = 135 / 129 ≈ 1.05
For the Additional Services stage:
\(U_{additional}\) = 45 / 129 ≈ 0.35
For the Wheel Balancing stage:
\(U_{balancing}\) = 0 / 129 = 0
The implied utilizations show how efficiently each stage of the process is being utilized. Utilization values greater than 1 indicate that the stage is operating beyond its capacity.
d) Weekly Capacity of the Process:
To calculate the weekly capacity of the process, we multiply the daily capacity by the number of days the shop is open per week:
Weekly Capacity = Daily Capacity * Number of days shop is open per week
Given that the shop is open for 60 hours per week, the number of days the shop is open per week can be calculated as follows:
Number of days shop is open per week = 60 hours / 24 hours per day = 2.5 days
Therefore, the weekly capacity of the process is:
Weekly Capacity = Daily Capacity * Number of days shop is open per week
Weekly Capacity = 129 bicycles per day * 2.5 days
Weekly Capacity = 322.5 bicycles per week
e) Flow Rate and Constraint Analysis:
To determine if the flow rate of the process is capacity-constrained or demand-constrained, we compare the weekly capacity to the demand for each service option.
Demand for Tune-up (\(T_{demand}\)) = 135 bicycles per week
Demand for Additional Services (\(A_{demand}\)) = 45 bicycles per week
Comparing the demands with the weekly capacity:
\(T_{demand}\) < Weekly Capacity (135 < 322.5)
\(A_{demand}\) < Weekly Capacity (45 < 322.5)
Since both the demands for tune-up and additional services are less than the weekly capacity, the flow rate of the process is demand-constrained. This means the shop has the capacity to handle the current demand without operating beyond its limits.
To know more about Demand Matrix here
https://brainly.com/question/13012912
#SPJ4
I need help with this
Answer:
yes they are congruent.
Step-by-step explanation:
first flip the A-D shape over the y axis and then the x axis and you should have the same shape.
The specifications for a manifold gasket that installs between two engine parts calls for a thickness of 2.500 mm + 020 mm. The standard deviation of the process is estimated to be 0.004 mm. The process is currently operating at a mean thickness of 2.50 mm. (a) What are the upper and lower specification limits for this product? (b) What is the Cp for this process? (c) The purchaser of these parts requires a capability index of 1.50. Is this process capable? Is this process good enough for the supplier? (d) If the process mean were to drift from its setting of 2.500 mm to a new mean of 2.497, would the process still be good enough for the supplier's needs? R
The upper specification limit is 2.520 mm, and the lower specification limit is 2.480 mm. The process is not capable according to the purchaser's requirement of a capability index of 1.50.
(a) The upper specification limit (USL) is calculated by adding the process mean (2.500 mm) to the upper tolerance (0.020 mm), resulting in 2.520 mm. The lower specification limit (LSL) is calculated by subtracting the lower tolerance (0.020 mm) from the process mean, resulting in 2.480 mm.
(b) The process capability index (Cp) is calculated by dividing the tolerance width (USL - LSL) by six times the standard deviation. In this case, the tolerance width is 0.040 mm (2.520 mm - 2.480 mm) and the standard deviation is 0.004 mm. Therefore, Cp = 0.040 mm / (6 * 0.004 mm) = 1.25.
(c) The purchaser requires a capability index (Cpk) of 1.50, which measures how well the process meets the specification limits. Since Cp (1.25) is less than the desired Cpk (1.50), the process is not capable according to the purchaser's requirement. It is not good enough for the supplier either, as the Cp is less than the desired level.
(d) If the process mean were to drift to 2.497 mm, the Cp value would remain the same at 1.25. Since the Cp value is still less than the desired Cpk of 1.50, the process would still not be good enough for the supplier's needs, even with the changed process mean.
Learn more about standard deviation here:
https://brainly.com/question/29115611
#SPJ11
What is the p-value for a z-statistic of 1.97
for a two-tailed test?
What is the z-statistic in a hypothesis test for a single
population mean given the following data? (rounded to the
nearest hundred
The p-value for a z-statistic of 1.97 in a two-tailed test is 0.05. Without the necessary data, it is not possible to determine the specific value of the z-statistic in a hypothesis test for a single population mean.
To determine the p-value for a z-statistic of 1.97 for a two-tailed test, we need to calculate the area under the standard normal distribution curve beyond the z-statistic in both tails.
Using a standard normal distribution table or a statistical software, we can find that the area to the right of a z-statistic of 1.97 is approximately 0.025.
Since this is a two-tailed test, we need to consider both tails, so the p-value is twice the area in one tail, which is 0.025 * 2 = 0.05. Therefore, the p-value for a z-statistic of 1.97 in a two-tailed test is 0.05.
Regarding the z-statistic in a hypothesis test for a single population mean given specific data, the question does not provide the necessary information such as the sample mean, population mean, and standard deviation. Without this information, it is not possible to calculate the z-statistic accurately.
To know more about p-value refer here:
https://brainly.com/question/30078820#
#SPJ11
Two points are g phedo the comdinate plane.
2
-1
-6
-5
-4
-3
-2
1
2
>
4
1 a
-1
S
6
7
-2
-3
A А
4
--5
-6
-7 기
-8
9
B
-10)
What is the distance between the two points? Enter the answer in the box
units
< Previous
Answer:
b
Step-by-step explanation:
yp
Answer:
huh
Step-by-step explanation:
plz help :(
1.Your brother and some of his friends, all under 12 years old, went to the movies. They paid $60 for their tickets. What equation could describe the situation?
2.Another family went to the movies. They bought some child tickets and some adult tickets and spent $96 altogether.
What equation could describe the situation?
How would the equation change if a child’s ticket cost $10?
How would the original equation change if the total price spent on the tickets were $156?
Answer:
1. 60=12y
60=5*12 y=5
2. a) 96=16x+12y
b) the 12y would be changed to 10y so, 96=16x+10y
c) 156=16x+12y the number of tickets will change if the total price goes up
Step-by-step explanation:
x= adult tickets
y=child tickets
im not sure but i think is bAnswer:
Step-by-step explanation:
b
b
b
b
bbb
b
b
b
b
b
b
b
b
b
b
b
b
b
b
b
b
b
b
b
Write the number "five hundredths, six thousandths, forty-two millionths" as a decimal.
Answer:
0.0560042
Step-by-step explanation:
Which equation could be solved using this application of the quadratic formula? A. -2x2 â’ 8 = 10x â’ 3 B. 3x2 â’ 8x â’ 10 = 4 C. 3x2 8x â’ 10 = -8 D. -2x2 8x â’ 3 = 4.
The given question can be solve using quadratic formula.
The correct option is (c) \(3x^2 +8x -10=-8\).
Given:
The given equation is,
\(x=\dfrac{-8\pm\sqrt{8^2-4(3)(-1)}} {2(3)}\)---------------------------(1)
Write the general quadratic equation.
\(ax^2 + bx +c=0\)
Write the quadratic formula.
\(x =\dfrac {-b \pm \sqrt{(b^2 - 4ac)} } {2a}\)------------------------------- (2)
Compare equation (1) and (2).
\(a=3\\b=8\\c=-2\)
Substitute the value of \(a\), \(b\) and \(c\) in general quadratic.
\(3x^2 +8x -2=0\)
Subtract \(8\) from each side of above equation.
\(3x^2 +8x -2 -8=0-8\\3x^2 +8x -10=-8\)
Thus, the correct option is (c) \(3x^2 +8x -10=-8\).
Learn more about quadratic equation here:
https://brainly.com/question/17177510
need help in these 2 last questions!!!
Question 9
The point (30,15) means that x = 30 and y = 15 pair up together.
Similarly, (40,25) means we have x = 40 and y = 25 paired up.
Apply the slope formula to get
m = (y2-y1)/(x2-x1)
m = (25-15)/(40-30)
m = 10/10
m = 1
The slope is 1.
It tells us that each time y goes up by 1, x is also increasing by 1.
slope = rise/run = 1/1
rise = 1, run = 1
The rise is the change in y, the run is the change in x.
This means the plant's height (y) goes up by 1 cm each time the number of days (x) goes up by 1.
In short, the plant's height is increasing by 1 cm per day
Answer: Choice D========================================================
Question 10
y varies directly with x, so y = kx for some constant k.
We're then told that x = -1 and y = -2 pair up together.
Let's find k based on those items
y = kx
y/x = k
k = y/x
k = -2/(-1)
k = 2
So y = kx becomes y = 2x
Then we're asked to find x when y = -4
y = 2x
y/2 = x
x = y/2
x = -4/2
x = -2
Answer: Choice DProve the following conjecture " A square number is either measurable by 4 or will be after the removal of a unit" Is the conjecture still valid if 4 is replaced by 3 ? 3. Prove or disprove the following conjecture: "The double of the sum of three consecutive triangular number is either measurable by 3 , or it will be after adding one unit"
The conjecture "A square number is either measurable by 4 or will be after the removal of a unit" is true. If a number is a perfect square, it can be expressed as either 4k or 4k+1 for some integer k.
However, if 4 is replaced by 3 in the conjecture, it is no longer valid. Counterexamples can be found where square numbers are not necessarily divisible by 3.
To prove the conjecture that a square number is either divisible by 4 or will be after subtracting 1, we can consider two cases:
Case 1: Let's assume the square number is of the form 4k. In this case, the number is divisible by 4.
Case 2: Let's assume the square number is of the form 4k+1. In this case, if we subtract 1, we get 4k, which is divisible by 4.
Therefore, in both cases, the conjecture holds true.
However, if we replace 4 with 3 in the conjecture, it is no longer valid. Counterexamples can be found where square numbers are not necessarily divisible by 3. For example, consider the square of 5, which is 25. This number is not divisible by 3. Similarly, the square of 2 is 4, which is also not divisible by 3. Hence, the conjecture does not hold when 4 is replaced by 3.
Learn more about conjecture here : brainly.com/question/29381242
#SPJ11
Ben measured the math table using his linking cube stick to determine how many cubes long the table was. This is an example of using: a. A standard measure to determine the length of an object. b. A non-standard measure to determine the length of an object. c. An expression of Ben’s creativity.
Answer:
A
Step-by-step explanation:
The given statement is an example of a standard measure to determine the length of an object.
What is the standard measure of length?The standard unit for measurement of length exists meter. Apart from the meter, we have different units such as a meter, kilometer, millimeter, feet, inches, and so on. Meter stands are also named the SI unit of length or base unit of length.
Therefore, the correct answer is option a. A standard measure to determine the length of an object.
To learn more about standard measures
https://brainly.com/question/17262133
#SPJ2
Below are Eddie's quiz scores for Mrs. Adams' Chemistry class.
82, 78, 82, 80, 100, 96, 75, 91
Mrs. Adams gives her students different options to report their quiz grades for the grading period.
Calculate the mean, median, mode and range of the set of Eddie's quiz scores.
Be sure to have a total of four (4) answers!!!
Answer:
Mean: 85.5%
Median: 82%
Mode: 82%
Range: 100-75=25
Step-by-step explanation:
Mean: Add all the numbers and divide by how many you use
Median: Is the middle number
Mode: The number that occurs often
Range: The biggest number minus the smallest number
( I hope this helped)
Therefore , the solution of the given problem of median comes out to be the range is 25, the mode is 82, the mode score is 82, and the mean score is 85.375.
Describe median.The median value of an organized group is the precise value that makes up the mean. In this case, the ratio between the lowest and highest 50% of the sample is a probability measurement rather than a typical measurement. To find any strange or even amounts of values, different techniques may be used to find the center and mode.
Here,
We add up all the scores and split by the total number of scores to determine the mean:
=> (82 + 78 + 82 + 80 + 100 + 96 + 75 + 91) / 8 = 85.375
So, 85.375 is the mean result.
We must arrange the scores in ascending sequence before we can determine the median:
=> 75, 78, 80, 82, 82, 91, 96, 100
The median is the average of the two middle values, which are 82 and 91, out of a total of 8 scores:
=> (82 + 91) / 2 = 86.5
The average rating is 86.5.
We deduct the lowest number from the highest score to determine the range:
=> 100 - 75 = 25
Thus, the limit is 25.
As a result, the range is 25, the mode is 82, the mode score is 82, and the mean score is 85.375.
To know more about median , visit
brainly.com/question/28060453
#SPJ1
What are the vertices of triangle ABC'if triangle ABC is dilated by a scale factor of 3?
Answer:
where is the picture
Step-by-step explanation:
I need the triangle to be able to solve this for you
When looking at a rate table for supplemental term life insurance, what are the rates based on?
a. where the insured was born
b. the marital status of the insured
c. where the insured lives
d. the age of the insured
Answer:
d. the age of the insured
Step-by-step explanation:
The primary unit for figuring out a life insurance rate is the rate per thousand
Callie has 3,264 beads. She wants to divide the beads evenly to make 32 necklaces. How many beads will be
used for each necklace?
Answer:
102 beads will be used for each necklace.
Step-by-step explanation:
3,264/32=102
1. Identify and explain one way in which the movie portrays historical facts accurately in the movie (History vs. Hollywood).