Access points (AP) are discovered using WEP. The ciphertext sent by an AP is encrypted with the same key and cipher used by its stations. Which authentication method is being used

Answers

Answer 1

The authentication method being used in this scenario is WEP (Wired Equivalent Privacy).

In the given scenario, the access points (AP) are discovered using WEP, and the ciphertext sent by an AP is encrypted with the same key and cipher used by its stations. This indicates that the authentication method being used is WEP.

WEP is an encryption protocol used to secure wireless networks. It was widely used in the early days of Wi-Fi but has been largely deprecated due to significant security vulnerabilities. However, for the purpose of understanding the authentication method in this scenario, we can consider WEP.

WEP uses a shared key authentication method, where both the AP and the wireless stations share a common key. The key is used to encrypt the data packets transmitted between the AP and the stations. In this case, the AP and its stations are using the same key and cipher to encrypt and decrypt the data.

While WEP provided some level of security initially, it has proven to be weak against various attacks, and its use is strongly discouraged. Modern Wi-Fi standards, such as WPA (Wi-Fi Protected Access) and WPA2, offer stronger security mechanisms and encryption algorithms to ensure the confidentiality and integrity of wireless communications.

In summary, the authentication method being used in this scenario is WEP, which utilizes a shared key between the AP and its stations to encrypt and decrypt data. However, it is important to note that WEP is an outdated and insecure authentication method that should be replaced with more robust alternatives like WPA2.

To learn more about  authentication Click Here: brainly.com/question/30699179

#SPJ11


Related Questions

why does elephant has thicker legs? Explain in terms of breaking stress?​

Answers

Answer:

Since volume is proportional to area, volume is inversely proportional to pressure.

An elephant has a greater weight towards Earth's surface, so it has a larger legs of larger volume which exerts less pressure on Earth's surface in order to prevent it from immersing in soil, or soft land

With respect to iot security, what term is used to describe the digital and physical vulnerabilities of the iot hardware and software environment?
a. Traffic Congestion
b. Device Manipulation
c. Attack Surface
d. Environmental Monitoring

Answers

Answer: Answer Surface

Explanation:

Posts that you delete _____.

cannot ever be shared

will be released in five years

are still visible to others

may already have been shared

Answers

May have already been shared

Answer: Below

Explanation:

Posts that you delete _____.cannot ever be sharedwill be released in five yearsare still visible to othersmay

rolulzoss
A. State three positive uses of computers in the government sector​

Answers

Answer:

1) it's easier to keep documents

what are you win your good at tech

Answers

Answer:

Dude

Explanation:

Say this again but not in gibberish.

Answer:

Tech savvy!

Explanation:

The question is a bit unclear, but from what I am understanding a person who is considered good with anything to do with technology is called TECH SAVVY.

A scanner connected to your mac is giving problems and you suspect corrupted device drivers. What should you do first? second?.

Answers

The first thing you should do is to download and install drivers from the scanner manufacturer and then update your macOS.

What is a scanner?

A scanner can be defined as a type of input device that is designed and developed to access, read, scan, or store (memorize) information about a physical object such as a paper-document, especially through the use of a light beam.

In this scenario, the first thing you should do is to download and install drivers from the scanner manufacturer's website and then update your computer's operating system (macOS).

Read more on input devices here: brainly.com/question/5430107

#SPJ1

The first step is to obtain and install scanner drivers, followed by a macOS update.

What is an input device?

An input device is any piece of hardware that sends data to the computer.

A scanner connected to your mac is giving problems and you suspect corrupted device drivers.

A scanner is a sort of input machine that enables a laser beam to view, read, scan, or store (memorize) details about a physical product such as a printed document.

In this case, the first step you should go to the scanner company's website and simply download drivers, then install your computer or network.

More about the input device link is given below.

https://brainly.com/question/13014455

#SPJ4

Q4. Create an HTML page with following specifications:
1) Title should be about myCity
2) Place your City name at the top of the page in large text and in blue color
3) Add names of landmarks in your city each in a different color, style and typeface One of the landmark
4) Yourschool name should be blinking
5) Add scrolling text with a message of your choice

Answers

The example of an HTML page that meets your specificationsin regards to  Title should be about myCity, and others is given in the code attached.

What is the HTML page?

The <title> tag is used to tell the browser what name to show at the top of the page. The <style> tag is where you can put rules for CSS, which is used to style things on your HTML page.

Therefore, The <h1> tag with the class name "city-name" is used to show the city name at the top of the webpage. The text says that in the CSS section, there is a class which has a big font size of 32 and blue color.

Learn more about   HTML page  from

https://brainly.com/question/4056554

#SPJ1

Q4. Create an HTML page with following specifications:1) Title should be about myCity2) Place your City
Q4. Create an HTML page with following specifications:1) Title should be about myCity2) Place your City

Your company emphasizes the important of conserving (not wasting)
resources. How can you support that value when you print an 8-page report
you were asked to bring to your department's monthly meeting?
A. Use the Save option to choose a format readers can open.
B. Post the report online before printing it.
C. Use the Print option to create extra copies.
D. Use the Print option for two-sided printing.
SUBMIT

Answers

Answer:

D. Use the Print option for two-sided printing.

Explanation:

ape x

Answer:

D

Explanation:

Calcule la carga que puede levantar un cabrestante si la manivela mide 40 cm y el El radio del molinete es una tercera parte de la manivela, si hacemos un fuerza en el mango de 250 N

Answers

Answer:

C

Explanation:

because...

What is the confirmation or validation of an event or object?a.Fact.b.Data.c.Information technology.d.All of the above.

Answers

Fact is the Confirmation or validation refers to the process of verifying that an event or object is true or accurate.

Fact is a statement or piece of information that can be verified and is considered to be true. It is a confirmed or validated event or object. Facts can be supported by evidence and documentation, and they are an important part of understanding and explaining the world around us. They are different from opinions or beliefs, which are subjective and may not be supported by evidence. In scientific research, facts are the foundation of theories and hypotheses, and are subject to testing and verification to establish their validity.

Confirmation or validation refers to the process of verifying that an event or object is true or accurate. This is often done through the use of evidence or other forms of documentation. In this context, a "fact" would be the confirmation or validation of an event or object, as it is a piece of information that can be verified and is considered to be true. While data and information technology may be used to confirm or validate facts, they do not represent the confirmation or validation itself.

Learn more about Validation here:

https://brainly.com/question/14356883.

#SPJ4

Which of these tools can best be used as a self assessment for career planning purposes? a personality test an asset analysis a self-directed learning experience a goal development checklist

Answers

Answer:

C - a self-directed learning experience

Explanation:

The tool that can best be used as a self-assessment for career planning purposes is a self-directed learning experience. Thus the correct option is C.

What is a Career?

A career is referred to what an individual chooses as a profession to earn something. A career of an individual is based on his talents, skills, and abilities which help him to seek growth and development and achieve the goals of life.

Self-directed learning encourages the organic growth of personality, creativity, persistence, and life happiness. It promotes students' options, independence, ambition, and the development of various abilities for lifetime learning.

Finding your skills, values, hobbies, and interests is the first step in the career development process. From there, one may decide what kinds of roles might be interesting to both you and a good fit.

Therefore, option C is appropriate.

Learn more about career, here:

https://brainly.com/question/2160579

#SPJ2

a device that allows you to speak to and hear the voice of someone far away

Answers

The device that allows you to speak to and hear the voice of someone far away is commonly known as a "telephone."

A telephone is a communication device that converts sound into electrical signals, transmits them over a network or a telephone line, and then converts them back into sound at the receiver's end. It enables individuals to have real-time conversations with people who are located in different geographic locations.

Modern telephones come in various forms, including landline telephones, mobile phones, and Voice over Internet Protocol (VoIP) phones. These devices use different technologies and networks to facilitate voice communication over short or long distances.

The invention of the telephone by Alexander Graham Bell in the late 19th century revolutionized communication, allowing people to connect and interact with each other regardless of physical distance. Since then, telephones have evolved significantly, incorporating advanced features such as video calling, messaging, and internet connectivity, making communication even more versatile and convenient.

Learn more about telephone:

https://brainly.com/question/23433108

#SPJ11

which is the correct one ​

which is the correct one

Answers

Reconfiguring a router --> network collisions

Repeariring a faulty network adpater ->>> a network slowdown

Resloving IP address conflicts --> connectivity issues

Setting the correct permissions --> problems with accessing shared resources

**hope it helps you :)

Which parameter can be used with the ping command to send a constant stream of packets when using a Windows device?
a. -f
b. -p
c. /all
d. -g
e. -t

Answers

The correct response is (e) i.e. -t. When using a Windows device, the ping command can be used with the -t argument to deliver a continuous stream of packets.

The Packet InterNet Groper is the full name of PING. It is software used to evaluate the network communication between two devices, either as a network management system or as a utility. The main TCP/IP command used to assess connectivity, reachability, and name resolution is ping. This command shows Help information when used without any parameters. This command can be used to check the computer's IP address as well as its name. The reaction time of your connection, or how quickly your device receives a response after you send out a request, is known as latency.

Learn more about PING here:

https://brainly.com/question/29974328

#SPJ4

Subject: Cyber Security
Q.how to generate protocol layer attack?

Answers

In order to generate a protocol layer attack, a number of steps need to be followed. Here are the steps for generating protocol layer attack:

Step 1: Reconnaissance This is the first stage of a protocol-layer attack. The attacker will attempt to learn as much as possible about the target network before launching an attack. This may involve passive data gathering, such as port scanning, network mapping, and protocol identification.

Step 2: Identify the target protocol Once the reconnaissance stage is complete, the attacker will determine which protocol to attack. The attacker must be familiar with the protocol's weaknesses in order to exploit them. The attacker will use a variety of tools and techniques to determine the target protocol's vulnerabilities.

Step 3: Analyze the protocol The attacker will conduct a protocol analysis to identify potential vulnerabilities and the best methods to exploit them. The attacker will scrutinize the protocol's functionality to determine if there are any flaws that can be exploited.

Step 4: Plan the attack Once the reconnaissance, target identification, and protocol analysis have been completed, the attacker will plan the attack. This may include choosing the appropriate exploit, preparing the payload, and selecting the most appropriate attack vector.Step 5: Launch the attackThe attacker will launch the attack after it has been planned and tested. The attack will be launched using a variety of methods, including port scanning, brute force attacks, and man-in-the-middle (MitM) attacks. The attack will be launched with the aim of disrupting or exploiting the target protocol.

Learn more about Cyber Security here:

https://brainly.com/question/30724806

#SPJ11

Challenge 1
Create a flowchart that takes two integer values from a user and evaluates and displays which one is the smallest value.

Challenge 2
Create a flowchart that asks the user to guess a random number populated by the program between 1 and 100. Use a logic flow arrow to create a loop that returns the user back into the program to continue guessing.

Challenge 3
Create a flowchart that asks the user for a number 10 separate times and adds all the numbers together. At the end, have the program display the sum.

Answers

Using the knowledge in computational language in python it is possible to write a code that create a flowchart that asks the user to guess a random number populated by the program between 1 and 100

Writting the code:

import random

def main():

randomNumber = random.randint(0,100)

count =0

while True:

guess = input("Guess?")

if(guess == randomNumber):

count = count+1

print "Congratulations found guessed correct number and number of guesses are ",count

break

elif guess >100 or guess <0:

print "Input should be in between 0 and 100"

elif guess > randomNumber:

count = count+1

print "Too high, try again."

elif guess < randomNumber:

count = count+1

print "Too low, try again."

if __name__=='__main__':

main()

See more about python at brainly.com/question/16757242

#SPJ1

Challenge 1Create a flowchart that takes two integer values from a user and evaluates and displays which

The table below provides the parameters for a new current state value stream map for the family of retainers at the Jensen Bearings Inc. firm described in the chapter. This table depicts the value stream after Kline Steel agrees to accept daily orders for steel sheets and also agrees to deliver on a daily basis. Calculate each component of the new value? stream's reduced lead time. Jensen Bearings operates 5 days per week. 1 Click the icon to view the data from the new current state value stream map at Jensen Bearings Inc.Overall Process Average demand: 2,700/week (1,400 "L 1,300 "S) Attributes Batch size: 1,000 Number of shifts per day: 1 Availability: 8 hours per shift with two 30 minute lunch breaks Press Process Step 1 Cycle time= 6 seconds Setup time= 2 hours Uptime= 90% Operators 1 Every Part Every= 1 week WIP= 1 day of sheets (before Press) Process Step 2 Pierce & Form Cycle time 27 seconds Setup time= 30 minutes Uptime= 100% Operators 1 WIP= 1.000 "L", 1.350 "S" (before Pierce & Form) Process Step 3 Finish Grind Cycle time 40 seconds Setup time= 45 minutes Uptime= 100% Operators 1 WIP= 300 "L", 1.550 "S" (before Finish Grind) WIP= 600 "L", 1.300 "S" (after Finish Grind) Process Step 4 Supplier Information Information Flow Ship One shipment a day in trays of 60 pieces ping All communications from customer are electronic 180/90/60/30/day Forecasts Daily Order All communications to supplier are electronic 4-week Forecast Weekly Fax There is a weekly schedule manually delivered to Press, Pierce & Form, and Finish Grind and a Daily Ship Schedule manually delivered to Shipping All material is pusheda. How many days of raw material does the? Bearing's plant now? hold? The plant holds _____ days of raw material. ?(Enter your response rounded to one decimal? place.)
b. How many days of work in process inventory is held between Press and Pierce? & Form? The inventory is held _____ days. ?(Enter your response rounded to one decimal? place.)
c. How many days of work in process inventory is held between Pierce? & Form and Finish? Grind? The inventory is held ____ days. ?(Enter your response rounded to one decimal? place.)
d. How many days of work in process inventory is held between Finish Grind and? Shipping? The inventory is held _____ days. ?(Enter your response rounded to one decimal? place.)
e. What is the new value? stream's production lead? time? The production lead time is ______ days. ?(Enter your response rounded to one decimal? place.)
f. What is the new value? stream's processing? time? The processing time is _____ seconds. ?(Enter your response as a whole? number.)

Answers

a. To calculate the number of days of raw material inventory, we need to consider the average demand and the batch size.

The average demand per week is 2,700 sheets, and the batch size is 1,000 sheets. Since the plant operates 5 days per week, the plant holds (2,700/5) / 1,000 = 0.54 days of raw material inventory.

b. The work in process inventory between Press and Pierce & Form consists of the batch size of 1,000 sheets. Since the batch size is the same as the work in process inventory, the inventory held between Press and Pierce & Form is 1 day

c. The work in process inventory between Pierce & Form and Finish Grind is given as 300 sheets for "L" and 1,550 sheets for "S" before Finish Grind. After Finish Grind, the inventory is 600 sheets for "L" and 1,300 sheets for "S". Therefore, the inventory held between Pierce & Form and Finish Grind is (600+1,300) - (300+1,550) = 50 sheets.

d. The work in process inventory between Finish Grind and Shipping is not explicitly provided in the given information. Therefore, we cannot determine the number of days of work in process inventory between these two steps.

e. The new value stream's production lead time is calculated by adding the days of raw material inventory, the days of work in process inventory, and the days of finished goods inventory. Since the finished goods inventory is not provided, we cannot determine the production lead time.

f. The processing time for the new value stream is the sum of the cycle times for all process steps: 6 seconds + 27 seconds + 40 seconds = 73 seconds.

Learn more about Value Stream Mapping here:

https://brainly.com/question/14395945

#SPJ11

―Connectivity is Productivity‖- Explain the statements.

Answers

connectivity is productivity. It’s true for a modern office, and also for any place – for an undeveloped village.

the cardinality of one cardinal raised to the power of another is just the cardinality of the functions from the latter to the former

Answers

The power set of the naturals has a cardinal that is unknown; we only know that it is larger than aleph 0 and that aleph 1 is the smallest infinite set larger than aleph 0.

According to the continuum hypothesis, the cardinal of the reals is at aleph 1. Finding their order is difficult, whereas demonstrating that one infinity is larger than another is simple. I'm also unsure of how to demonstrate what aleph 1 is. In other words, while I'm not certain the naturals' power set is aleph 1, it is unquestionably greater than aleph 0 and may be aleph 1. A cardinal number, also known as a counting number, is typically a number used in counting, such as 1, 2, or 3.

Learn more about number here-

https://brainly.com/question/19797595

#SPJ4

true/false. a java servlet class needs to process any type of http requests.

Answers

False. A Java Servlet class does not need to process any type of HTTP requests. The processing of specific types of HTTP requests is determined by the servlet's implementation and configuration.

In Java Servlet programming, a servlet class can be designed to handle specific types of HTTP requests, such as GET, POST, PUT, DELETE, etc. The servlet can be mapped to specific URL patterns or configured to handle requests based on HTTP methods.For example, a servlet can be designed to handle only GET requests and ignore other types of requests. This allows developers to create specialized servlets that handle specific types of requests and delegate other types of requests to different servlets or components.Therefore, a Java Servlet class can be designed to process specific types of HTTP requests based on the requirements of the application it is being developed for.

Learn more about Java Servlets here

https://brainly.com/question/12978122

#SPJ11

Which are the following 4 things something must be able to do in order to be a computer? *

Answers

Answer:

There are four main equipment functions of a computer system: Input, Processing, Storage and Output.

Explanation:

T/F: any server that is not using smtp for legitimate email transfers should have port

Answers

False. Not all servers that are not using SMTP for legitimate email transfers should have port 25 closed. While port 25 is commonly associated with SMTP (Simple Mail Transfer Protocol), it is not the only protocol used for email transfers.

Other protocols like Submission (port 587) and Secure SMTP (port 465) are also used for email transmission. Therefore, if a server is using alternative email transfer protocols, it may still need to have the corresponding ports open.

Closing port 25, which is the default port for SMTP, is a common security measure to prevent unauthorized email relaying and spam. However, it is important to consider the specific email transfer requirements and protocols used by the server before determining which ports should be open or closed. Adhering to best practices and following appropriate security configurations based on the server's email transfer setup is crucial.

Learn more about Simple Mail Transfer Protocol here:

https://brainly.com/question/32272205

#SPJ11

Calculate the formula unit mass if Al(NO3)3.(Al=27,N=14,O=16)​

Answers

Answer:

Explanation:

EMAIL query ? comment or request a type of GCSE calculation not covered? ... atomic masses are Al = 27 and O = 16; so the relative formula mass RFM or Mr = (2 x 27) + (3 x 16) = 102

The aesthetics of a game relate to the look and feel that the game has.

True

False

Answers

The aesthetics of a game relate to the look and feel that the game has.

True

False

Match each of the following terms to its definition: I. web-based II. open source III. project management IV. personal information manager V. proprietary A. software used to keep track of appointments B. software that is hosted on a website C. software used to track tasks and coordinate resources D. software which must be purchased E. software code that is freely available

Answers

Answer:

A. Personal information manager.

B. Web-based.

C. Project management.

D. Proprietary.

E. Open source.

Explanation:

A software can be defined as a set of executable instructions (codes) or collection of data that is used typically to instruct a computer how to perform a specific task and to solve a particular problem.

Simply stated, it is a computer program or application that comprises of sets of code for performing specific tasks on the system.

Basically, softwares are categorized into the following categories;

A. Personal information manager: software used to keep track of appointments. It can be used to schedule and manage schedules easily.

B. Web-based: software that is hosted on a website. It works based on cloud computing services and as such requires the use of internet for use at all times.

C. Project management: software used to track tasks and coordinate resources.

D. Proprietary: software which must be purchased. It also known as a closed-source software and can be defined as any software application or program that has its source code copyrighted and as such cannot be used, modified or distributed without authorization from the software developer. Thus, it is typically published as a commercial software that may be sold, licensed or leased by the software developer (vendor) to the end users with terms and conditions.

Some examples of proprietary software are Microsoft Windows, macOS, Adobe photoshop etc.

E. Open source: software code that is freely available. It is typically published as a free software that may be downloaded on various platforms by the end users.

Following is the matched solution for the given question.

I. Web-based - B. software that is hosted on a websiteII. Open source - E. software code that is freely availableIII. Project management - C. software used to track tasks and coordinate resourcesIV. Personal information manager - A. software used to keep track of appointmentsV. Proprietary - D. software which must be purchased.

I. Web-based software refers to applications or programs that are accessed and used through a web browser. Instead of being installed on individual computers, the software is hosted on a server and accessed remotely over the internet.

II. Open source software refers to software whose source code is made available to the public. It can be freely used, modified, and distributed by anyone.

III. Project management software is designed to help teams and individuals manage projects efficiently. It assists in planning, organizing, and tracking tasks, resources, and timelines.

IV. Personal information manager (PIM) software is used to organize personal information such as appointments, contacts, notes, and tasks. It helps individuals manage their schedules, track important dates, and maintain personal productivity.

V. Proprietary software refers to software that is privately owned and controlled by a company or individual. It is typically distributed under licensing agreements, and users must purchase or obtain the necessary licenses to use the software.

Learn more about web-based software here:

brainly.com/question/4560046

#SPJ6

Which code results in a ValueError?

int('seven')
float(2.5)
int(7)
8 / 0

Answers

Answer:

Int(‘seven’)

Explanation:

Took one edg

Answer: int('seven')

The guy above is correct.

Exceptions of Java's RunTimeException class are thrown when a standard run-time program error occurs.
Group of answer choices
True
False

Answers

The superclass of objections that can be triggered during regular Java Virtual Machine execution is called Runtime Exception. Unchecked exceptions include Runtime Exception and its subclasses.

The correct answer is :true.

Why do we use executable exception in Java?

When a user invokes a method incorrectly, it's standard practise to raise a Runtime Exception. For instance, a method can determine whether one of its parameters is actually null. The method may raise a Null Pointer Exception, an ignored exception, if a parameter is null.

What distinguishes an exception from a runtime exception?

The parent class of all the Java code exceptions that are predicted to cause the programme or application to break or fail is known as the Runtime Exception. Unlike exceptions that are not recognised as Java Exceptions, Runtime Exceptions were not checked

To know more about Machine visit:

https://brainly.com/question/2641982

#SPJ4

A Review Constants Learning Goal: To practice Problem Solving Strategy 24.1 Equivalent Capacitance. Consider the capacitor connection shown in the picture below, where C1=C2=C3 = 16.0 uF and C4 = 36.0 uF. Determine the equivalent capacitance of the entire combination. (Figure 1) Part A The four capacitors shown in the diagram are neither all in series nor all in parallel. You can, however, identify portions of the arrangement that are either in series or parallel, as described in the following statements. Which of these statements are correct for this problem? Figure < 1 of 1 Check all that apply. C3 is in series with C4. C C3 is in parallel with C1 and C2. C4 is in series with Ci and C2. C3 HH O C1 is in series with C2. Submit Request Answer a b Learning Goal: A Review Constants Part 2 To practice Problem Solving Strategy 24.1 Equivalent Capacitance. Consider the capacitor connection shown in the picture below, where C1=C2=C3 = 16.0 uF and C4 = 36.0 uF. Determine the equivalent capacitance of the entire combination. (Figure 1) Suppose that you are given another network of the same form as the one analyzed in Part B, but with different values for the individual capacitances. How would you expect the equivalent capacitance Ceq to compare to the values of each individual capacitor in the network? Choose the statement below that is true regardless of the actual values for the individual capacitors. Figure < 1 of 1 > ► View Available Hint(s) Ceq must be less than C1 + C2 . C Ceq must be less than C4. The value of Ceq is not bounded by the value of any individual capacitance in the network. H. Ceq must be less than C3. "T Submit a

Answers

Correct statements for Part A: C3 is in series with C4, C1 is in series with C2.

Statement for Part B: The value of Ceq is not bounded by the value of any individual capacitance in the network.

Part A: The correct statements for this problem are: C3 is in series with C4, C1 is in series with C2, and C3 is in parallel with C1 and C2.

Part B: Regardless of the actual values for the individual capacitors, the statement that is true is: The value of Ceq is not bounded by the value of any individual capacitance in the network. The equivalent capacitance can be greater or smaller than any of the individual capacitances in the network, depending on the specific arrangement of series and parallel connections.

Learn more about series with C4 from

brainly.com/question/12904470

#SPJ1

write the steps to insert date and time in a cell​

Answers

Answer:

Do one of the following:

To insert the current date, press Ctrl+; (semi-colon).

To insert the current time, press Ctrl+Shift+; (semi-colon).

To insert the current date and time, press Ctrl+; (semi-colon), then press Space, and then press Ctrl+Shift+; (semi-colon).

You manage a network that uses a single switch. All ports within your building connect through the single switch. In the lobby of your building are three RJ45 ports connected to the switch. You want to allow visitors to plug into these ports to gain internet access, but they should not have access to any other devices on your private network. Employees connected throughout the rest of your building should have both private and internet access. Which feature should you implement

Answers

Answer:

VLANs

Explanation:

Virtual LANs (VLANs) are a type of network connection or arrangement of network devices in the same broadcast domain. They are called Virtual LANs because they represent fractions or subgroups in the switch ports found in an Ethernet LAN.

Indeed, because of their topological arrangement, this reduces the security risk of unauthorized access to sensitive data or devices since the host can be placed on a different VLAN. Hence, in this scenario, using this network feature would allow visitors to plug into these ports to gain internet access, but they would not have access to any other devices on the private network.

Other Questions
In a bag of 10 marbles, there are 4 blue, 3 red, 2 green,and 1 yellow. What is the probability that you draw onemarble that is red, replace it, and draw another marble thatis yellow?a. 2-5b. 3100C. 130O d. 310 Please be quick I need to pass this class From the timeline, on the left choose one subgenre of jazz and discuss what elementsare found in this type of music. in the long run, a firm will exit a competitive industry if question 4 options: a) total revenue exceeds total cost. b) the price exceeds average total cost. c) average total cost exceeds the price. d) both a and b are correct. in the tree of life, fungi are most closely related to: group of answer choices archaea bacteria viruses plants animals budget reports comparing actual results with planned objectives should be prepared only once a year. true or false Convert the following data block into a Hamming Code, of adequate size, using even parity: 1101001. Show all steps for full credit A rigid tank of volume 0.2 m^3 is connected through a closed valve to a horizontal cylinder fitted with a frictionless moveable piston of area 0.025 m^2. A linear spring is attached to the piston to constrain the piston movement. The ambient pressure in the vicinity is 100kPa. At the initial State 1 , the tank contains air at 300kPa and 30C, and the piston is in equilibrium with the spring uncompressed while trapping 0.002 m^3 of air at 30C in the cylinder. Although the valve is closed, a slow leak occurs through the valve, causing the air from the tank to flow slowly into the cylinder, pushing the piston thus compressing the spring. This process continues for a long period until the air pressure in whole connected system falls to 282kPa at State 2 where the piston finally comes to a new equilibrium position. Throughout this process, the air temperature in the tank and the cylinder remains constant at 30C. The ideal gas behaviour can be assumed for the air with R=0.287 kJ/kg.K. (a) Calculate the mass of air transferred from the tank to cylinder from State 1 to State 2. Ignore any air in the passage connecting the tank to the cylinder. (b) Find the volume of air in the cylinder at State 2. (c) Calculate the spring stiffness.(d) Determine the work done in the process from State 1 to State 2. It is given that the stored energy E in a spring with a spring constant k due to compression x is given by E=1/2 kx^2 Pls I need it fast , its for my homework and I cant find it 1) The change in temperature from Wednesday to Thursday was -10F. Thechange in temperature from Thursday to Friday was -7F. Which representsa greater change in temperature?The change from Wednesday to Thursday represents a bigger change in temperature.The change from Thursday to Friday represents a bigger change in temperature.They are the same. what term did weber use to describe his fear that bureaucracies would become both dehumanizing and pervasive in society? Plz, help. In the picture below. what california mountain range was the source of the gold rush? What is another name for corn snow, hominy snow, or soft hail?. the statement that cancer will afflict one-out-of-three people sometime during their lifetime is what type of an expression? Which of the following elements are capable of forming compounds in which the indicated atom has more than four valence electron pairs? That is, which can form compounds with five or six valence shell electron pairs? (Select all that apply.)ClSnSeFPBCO Do not round your intermediate calculations. Round your answer to 1 decimal place. f. If one additional worker could be hired, to which resource should the additional resources be assigned? Calculate the process capacity. Do not round your intermediate calculations. Round your answer to 1 decimal place units per hour. g. If they could take 1 minute of task time from one resource and give it to another resource (so the labor content remains the same), What would be the new capacity of the process (units per hour)? Assume that there is still only 1 worker per station. Do not round your intermediate calculations. Round your answer to 1 decimal place. units per hour h. What would be the capacity of the process if they integrated the work so that all workers do all three tasks (units per hour)? Assume that there is still only 1 worker per station. units per hour Consider a process consisting of three resources. Assume there exists unlimited demand for the product, and that all activities are always performed in the following sequence.Resource 1 has a processing time of 6 minutes per unit.Resource 2 has a processing time of 3 minutes per unit.Resource 3 has a processing time of 5 minutes per unit.All three resources are staffed by one worker and each worker gets paid $14 per hour please help!! my grades dying 15 points Find the length of side a.sorry for the bad quality, camera is broken. the one on top is 13 and the one below is 12. After being chased by zombies, T-Dog is finally able to use the restroom and eat the food they found the abandoned house. His _ nervous system is responsible for making this happenA. SomaticB. ParasympatheticC. AutonomicD. Sypathetic Which of the following statements is true of the social responsibilities of a business? Multiple Choice Legal responsibilities are often subsumed under the idea of corporate citizenship, reflecting the notion of voluntarily giving back to society. A firms ethical responsibilities go beyond its legal responsibilities. Shareholders mandatorily require a firm to perform its ethical and philanthropic responsibilities. Ethical responsibilities are the foundational building block of a firms social responsibility.