Answer:
6 days
Step-by-step explanation:
hope this helps
A librarian sorts 450 books at a constant rate. After 4 days, the librarian still has 150 books to sort. Then 6 days time does it take to sort the books from start to finish
What is Equation?Two or more expressions with an Equal sign is called as Equation.
The librarian sorted at a constant rate, then they sorted the same amount of books all 4 days.
450-150=300
If they still have 150 books left to sort, then they sorted 300 books over 4 days.
300/4=75
This means that they sorted 75 books per day.
150 divided by 75 is 2
So it will take 2 more days to finish sorting all the books.
So altogether, it will take 6 days to sort all of the books.
Hence 6 days time does it take to sort the books from start to finish
To learn more on Equation:
https://brainly.com/question/10413253
#SPJ5
I NEED SERIOUS HELP I WILL MARK BRAINLIEST IF U DO THE PAGE FOR ME PLZ HELP ITS DUE IN AN HOUR
Answer:
The rest are kinetic
Step-by-step explanation:
Potential: Standing at top of slide.
JUICE IN ORANGE
UNBURNED COAL
BATTERY
FROG SITTING
BOOK ON HIGH SHELF
PARKED CAR
the average number of phone inquiries per day at the emergency center is four. find the probability that it will receive five calls on a given day.
the probability that the emergency center will receive five calls on a given day is approximately 0.156, or 15.6%.
To find the probability of receiving five calls on a given day at the emergency center, we need to use the Poisson distribution formula:
\(P(x = 5) = (e^{-4})*\frac{(4^5)}{(5!)}\)
Where:
- x = number of phone inquiries
- e = Euler's number (approximately 2.71828)
- ! = factorial (i.e. 5! = 5*4*3*2*1)
Given that the average number of phone inquiries per day is four, we can use that as our lambda (λ) value in the Poisson distribution formula, since lambda represents the mean number of events in a specific time interval:
λ = 4
Now we can substitute these values into the formula and solve:
P(x = 5) = (e^-4)*(4^5)/(5!) = (2.71828^-4)*(1024)/(120) ≈ 0.156
Therefore, the probability that the emergency center will receive five calls on a given day is approximately 0.156, or 15.6%.
learn more about Poisson distribution formula:
https://brainly.com/question/30388228
#SPJ11
The probability that the emergency center will receive five calls on a given day is approximately 0.1755 or 17.55%.
To find the probability that the emergency center will receive five calls on a given day, given that the average number of phone inquiries per day is four, we can use the Poisson distribution formula.
Identify the average rate (λ): In this case, λ = 4 calls per day.
Identify the desired number of events (k): In this case, k = 5 calls.
Use the Poisson distribution formula: \(P(X = k) = (e^(-λ) \times (λ^k)) / k!\)
e is the base of the natural logarithm (approximately 2.71828)
λ is the average rate
k is the desired number of events
k! is the factorial of k
Plug in the values and calculate the probability:
\(P(X = 5) = (e^{(-4)} \TIMES (4^5)) / 5!\)
\(P(X = 5) = (0.0183 \times 1024) / 120\)
P(X = 5) ≈ 0.1755
So, the probability that the emergency center will receive five calls on a given day is approximately 0.1755 or 17.55%.
for such more question on probability
https://brainly.com/question/24756209
#SPJ11
Solve the System: Y=3x-7 Y=2x+5
I need help ASAP please and thank you!!!
Claire is 5 years older than her sister .
a. Write an equation that defines her sister's age, s, as a function of Claire's age, C
The required equation that defines her sister's age, s, as a function of Claire's age, C is C = s + 5.
Given that,
Claire is 5 years older than her sister.
To determine an equation that defines her sister's age, s, as a function of Claire's age, C.
Functions are the relationship between sets of values. e g y=f(x), for every value of x there is its exists in a set of y. x is the independent variable while Y is the dependent variable.
Here,
Let the sister's age be s and Claire's age be C,
Now, accoding to the question.
C = s + 5
Thus, the required equation that defines her sister's age, s, as a function of Claire's age, C is C = s + 5.
Learn more about function here:
brainly.com/question/21145944
#SPJ2
Help pls!
Simplify arctan 5 + arctan 6
(round to the nearest degree).
a. 21°
b. 159°
c. 201°
The simplified expression is -22 degrees (rounded to the nearest degree).
What is Trigonometry?
Trigonometry is a branch of mathematics that deals with the relationships between the sides and angles of triangles, and the functions that describe those relationships. It has applications in fields such as engineering, physics, astronomy, and navigation.
We can use the following trigonometric identity to simplify the expression:
arctan(x) + arctan(y) = arctan[(x+y) / (1-xy)]
In this case, we can substitute x = 5 and y = 6 to get:
arctan 5 + arctan 6 = arctan[(5+6) / (1 - 5*6)]
Simplifying the denominator, we get:
arctan 5 + arctan 6 = arctan(11/-29)
To find the degree measure of this angle, we can use a calculator to evaluate the inverse tangent of -11/29 and convert the result to degrees.
The result is approximately -22 degrees (rounded to the nearest degree).
Therefore, the simplified expression is:
arctan 5 + arctan 6 = -22 degrees (rounded to the nearest degree).
To learn more about Trigonometry from thee given link
https://brainly.com/question/24349828
#SPJ1
An unbiased coin is tossed 15 times. In how many ways can the coin land tails either exactly 7 times or exactly 2 times
Answer:
6688877887
Step-by-step explanation:
The recipe for a signature pizza uses `3` cups of cheese, `\frac{3}{4}` cup of olives, and `1\frac{1}{2}` cups of ham. How much cheese, olives, and ham is needed to make `10` signature pizzas?
You would need 30 cups of cheese, 7.5 cups of olives, and 15 cups of ham to make 10 signature pizzas.
To determine the amount of cheese, olives, and ham needed to make 10 signature pizzas, we need to multiply the amounts given in the recipe by the number of pizzas.
1. Cheese:
The recipe calls for 3 cups of cheese per pizza. To find the total amount of cheese needed for 10 pizzas, we multiply the amount per pizza by the number of pizzas:
3 cups/pizza * 10 pizzas = 30 cups of cheese
So, you would need 30 cups of cheese to make 10 signature pizzas.
2. Olives:
The recipe requires 3/4 cup of olives per pizza. To find the total amount of olives needed for 10 pizzas, we multiply the amount per pizza by the number of pizzas:
3/4 cup/pizza * 10 pizzas = 7.5 cups of olives
So, you would need 7.5 cups of olives to make 10 signature pizzas.
3. Ham:
The recipe specifies 1 1/2 cups of ham per pizza. To find the total amount of ham needed for 10 pizzas, we multiply the amount per pizza by the number of pizzas:
1 1/2 cups/pizza * 10 pizzas = 15 cups of ham
So, you would need 15 cups of ham to make 10 signature pizzas.
Learn more about cheese here:
https://brainly.com/question/29550156
#SPJ11
50 POINTS PLEASE HELP
find the area of quadrilateral RSTU
Answer:
29.5
Step-by-step explanation:
First, you find the area of a 7 by 5 rectangle.
Then you subtract the two triangles that are the access pieces.
What is the slope of the line shown below?
(6,6) and (1,-4)
Answer:
2(C)
Step-by-step explanation:
You can use the slope formula to answer this which is y₁ - y₂ divided by x₁ - x₂. Let's say that (x₁, y₁) is (6,6) and the (x₂, y₂) is (1, -4). We can then substitute these values into the formula.
This would become 6- (-4) divided by 6-1.
This can be further simplified as shown:
=6+4 divided by 5
=10/5
=2
Therefore, 2 is the slope of the line
The probability of passing the math class of Professor Chesley is 58%, the probability of passing Professor Lacava's physics class is 24%, and the probability of passing both is 19%What is the probability of passing one or the other?
The probability of passing one test or the other is given by:
0.63 = 63%.
What is a Venn probability?In a Venn probability, two non-independent events are related with each other, as are their probabilities.
The "or probability" between these two events is given by the rule presented as follows:
P(A or B) = P(A) + P(B) - P(A and B)
In the context of this problem, these events are given as follows:
Event A: Passing the math class of Professor Chesley.Event B: Passing the physics class of Professor Lacava.The probabilities of each event and the and probability are listed as follows:
P(A) = 0.58, P(B) = 0.24, P(A and B) = 0.19.
Hence the probability of passing one test or the other is calculated as follows:
P(A or B) = P(A) + P(B) - P(A and B)
P(A or B) = 0.58 + 0.24 - 0.19 = 0.63 = 63%.
More can be learned about a probability at https://brainly.com/question/24372153
#SPJ1
How do you identify outliers in regression?
Outliers in regression can be identified by looking for data points that are far away from the overall trend of the data. These points are usually evaluated by calculating the distance from the regression line to the point and comparing it to the standard deviation of the model.
Outliers in regression can be identified by looking for data points that are far away from the overall trend of the data. These points will often have a much larger or smaller value than the rest of the data, so they can be easily spotted by eye. However, to make sure that a point is truly an outlier, it is important to calculate the distance from the regression line to the point and compare it to the standard deviation of the model. If the distance is greater than two or three times the standard deviation, then the point is likely an outlier. Outliers can have a significant effect on the outcome of a regression analysis, so it is important to identify and address them appropriately.
Learn more about regression here
https://brainly.com/question/28178214
#SPJ4
Suppose that the random variable X is the time taken by a garage to service a car. These times are distributed between 0 and 10 hours with a cumulative distribution function
F (x) = A + B ln(3x + 2) for 0 ≤ x ≤ 10.
(a) Find the values of A and B and sketch the cumulative distribution function.
(b) What is the probability that a repair job takes longer than two hours?
(c) Construct and sketch the probability density function.
(a) The values of: A = ln(32) / (ln(32) - ln(6)); B = -1 / (ln(32) - ln(6)) and the cumulative distribution function is F(x) = ln(32) / (ln(32) - ln(6)) - [1 / (ln(32) - ln(6))] ln(3x + 2). (b) The probability is 0.102. (c) The probability density function is only defined on the interval [0, 10].
(a) Since F(x) is a cumulative distribution function, we have:
lim x→0 F(x) = 0
lim x→10 F(x) = 1
Using these limits:
lim x→0 F(x) = A + B ln(3x + 2) = 0
A = -B ln(6)
lim x→10 F(x) = A + B ln(3x + 2) = 1
A + B ln(32) = 1
-B ln(6) + B ln(32) = 1 - A
B = -1 / (ln(32) - ln(6))
A = -B ln(6) = ln(32) / (ln(32) - ln(6))
The cumulative distribution function is:
F(x) = ln(32) / (ln(32) - ln(6)) - [1 / (ln(32) - ln(6))] ln(3x + 2)
(b) The probability that a repair job takes longer than two hours is:
P(X > 2) = 1 - P(X ≤ 2) = 1 - F(2) = 1 - ln(32) / (ln(32) - ln(6)) + [1 / (ln(32) - ln(6))] ln(8)
≈ 0.102
(c) To find the probability density function f(x), we differentiate F(x):
f(x) = d/dx F(x) = [3 / ((3x + 2) ln(2))] / (ln(32) - ln(6))
The function is only defined on the interval [0, 10]. The graph of f(x) is decreasing on [0, 2] and increasing on [2, 10].
Know more about probability here:
https://brainly.com/question/13604758
#SPJ11
The alpha level for each hypothesis test made on the same set of data is called ______.
a. testwise alpha
b. experimentwise alpha
c. pairwise comparison
d. the Bonferroni procedure
The alpha level for each hypothesis test made on the same set of data is called B. experimentwise alpha
What is experimentwise alpha?When numerous suppositions are examined concurrently, the likelihood of committing at least one type I mistake grows.
In order to manage the probability of erroneously rejecting the null hypothesis in all tests, scientists usually modify the alpha level for each test, with the purpose of maintaining an experimentwise alpha that reflects the probability of making a type I error in the entire set of tests.
The Bonferroni procedure is a technique utilized to regulate the experimentwise error rate by adjusting the alpha level for each hypothesis test.
Learn more about hypothesis at: https://brainly.com/question/606806
#SPJ1
Write an expression that would represent the number of bags of Reese’s( three more than the number of bags of lollipops)
Answer:
1
Step-by-step explanation:
i don;t know
A bowling alley and a skating rink both offer birthday party rentals. The bowling alley costs $5 per person plus a $15 room rental fee. The skating rink costs $3 per person plus a $20 room rental fee. You have $50. If you want to invite as many people as possible, which location should you choose?
Follow the steps to decide on the party location.
1. Write an expression for the amount you would spend on a birthday party at the bowling alley. Let x represent the number of people you invite. (2 points)
2. Write an expression for the amount you would spend on a birthday party at the skating rink. (2 points)
3. How many people could you invite to the bowling alley? Show how you found your answer. (2 points)
4. How many people could you invite to the skating rink? Show your work. (2 points)
5. To which location could you afford to invite more people? (2 points)
Answer:
I'll try my best B r u h ....
Step-by-step explanation:
Bowling:
15+5x where x is the number of people
Skating:
20+3x
We have 50 dollars so the amount must be less than or equal to 50
Bowling
15+5x≤50
Subtract 15 from each side
15-15+5x≤50-15
5x ≤35
Divide each side by 5
5x/5 ≤35/5
x ≤7
She can have 7 or less people
Skating
We have 50 dollars so the amount must be less than or equal to 50
20+3x ≤50
Subtract 20 from each side
20-20+3x ≤50-20
3x ≤30
Divide each side by 3
3x/3 ≤30/3
x ≤10
She can have up to 10 people
She can invite more people skating
Hope this helped.
999A number one followed by one hundred zeros is known by what name.
Answer:
its called a googol
Step-by-step explanation:
You dont need one
segment jk has coordinates j(3 -6) and k(-3 2). Find the coordinates of the midpoint M. Find the distance between the endpoints of JK.
The coordinates of the midpoint M of segment JK are (-0. 3). The distance between the endpoints of JK is sqrt(104) or approximately 10.198.
To find the coordinates of the midpoint M of segment JK, we can use the midpoint formula, which states that the x-coordinate of the midpoint is the average of the x-coordinates of the endpoints and the y-coordinate of the midpoint is the average of the y-coordinates of the endpoints. So, for segment JK with endpoints J(3, -6) and K(-3, 2), the x-coordinate of the midpoint is (-3+3)/2 = 0 and the y-coordinate of the midpoint is (-6+2)/2 = -2. Therefore, the coordinates of the midpoint M are (0, -2).
To find the distance between the endpoints of JK, we can use the distance formula, which states that the distance between two points with coordinates (x1, y1) and (x2, y2) is given by the square root of [(x2-x1)^2 + (y2-y1)^2]. So for segment JK with endpoints J(3, -6) and K(-3, 2), the distance is sqrt[(-3-3)^2 + (2-(-6))^2] = sqrt[36 + 64] = sqrt(100) = 10. Therefore, the distance between the endpoints of JK is approximately 10.198.
Learn more about Midpoint Formula here: brainly.com/question/17685913
#SPJ11
guys please help this is a math question
Answer:
81.5
Step-by-step explanation:
<G and <H are congruent
<F and <I are congruent
so the last two angles in both triangles must also be congruent
this means that <K and <J are congruent
so we can create this equation: <K = <J
substitute the angles with what we know: 4\(y^{2}\) = 6\(y^{2}\) - 40
add 40 to both sides and subtract 4\(y^{2}\) from both sides: 40 = 2\(y^{2}\)
you get: 20 = \(y^{2}\)
root square on both sides: \(\sqrt{20}\) = \(\sqrt{y^{2} }\)
you get: y ≈ 4.5
substitute this into one of the equations for a missing variable:
6\(y^{2}\) -----> 6 (4.5 x 4.5) - 40
6 ( 20.25) - 40
121.5 - 40
81.5
A company determines that its weekly online sales, Upper S (t ), in hundreds of dollars, t weeks after online sales began can be estimated by the equation below. Find the average weekly sales for the first 3 weeks after online sales began. Upper S (t )equals2 e Superscript t
Answer:
$1272.36 ( average weekly sales for first 3 weeks )
Step-by-step explanation:
weekly online sales = S(t)
Determine average weekly sales for first 3 weeks
S(t) = 2e^t
total sales = ∫ S(t) dt
∴ Average weekly sales for first 3 weeks ( note : S(t) = 2e^t )
= \(\int\limits^3_0 {2e^t \, dt / ( 3 - 0 )\)
= 2 [ e^t ] ³₀ / 3 = 2 ( e^3 - e^0 ) / 3 = 2 ( 6.3618 ) = 12.7236 hundreds
= $1272.36 ( average weekly sales for first 3 weeks )
i cant figure out how to do this question plz help!
Answer:
\( slope (m) = \frac{1 - (-5)}{2 - (-1)} \)
\( = \frac{1 + 5}{2 + 1} \)
\( = \frac{6}{3} = 2 \)
Step-by-step explanation:
Find the slope (m) using the two points given, (-1, -5) and (2, 1):
\( slope (m) = \frac{rise}{run} = \frac{y_2 - y_1}{x_2 - x_1} \)
Let,
\( (-1, -5) = (x_1, y_1) \)
\( (2, 1) = (x_2, y_2) \)
Plug in the values into the equation:
\( slope (m) = \frac{1 - (-5)}{2 - (-1)} \)
\( = \frac{1 + 5}{2 + 1} \)
\( = \frac{6}{3} = 2 \)
y= -3/4x + 9
please help me with my homework
Find the value of x
First person to answer correctly gets brainliest.
Answer:
x is 54
Step-by-step explanation:
90-36=54
How do you divide fast without a calculator?
The simplest way to perform a division is long division and synthetic division.
What is division?
Division in mathematics is the process of dividing an amount into equal parts. For instance, we may split a group of 20 people into four groups of 5, five groups of 4, and so on.
There are two methods to perform division:
Long division: The mathematical procedure for splitting big numbers into more manageable groups or sections is known as long division. A difficulty can be solved by breaking it down into manageable parts. Dividends, divisors, quotients, and remainders all exist in long divisions.
Synthetic division: In algebra, synthetic division is a technique for manually dividing polynomials according to Euclid, requiring less writing and calculation than long division. Although the approach can be applied to division by any polynomial, it is often taught for division by linear monic polynomials.
To learn more about division, click on below link:
https://brainly.com/question/11781269
#SPJ4
Multiply. Express your answer in simplest form.
1
5
х
8
6
Answer:
1290
Step-by-step explanation:
15 x 86 = 1290
(16+2)(3)-5(-5+3) please whoever answers first gets brainlesst
Answer:
64
Step-by-step explanation:
lmk if you need explanation :)
Answer:
64
Step-by-step explanation:
(16+2)(3)-5(-5+3)
= (18)(3) - 5(-2)
= 54 + 10
= 64
Hope it helps!
Brainliest?
what is 1/4+3/8+1/2+5/8+3/4+7/8+1+1 1/4
Answer:
5.625 which is 5 5/8.
Step-by-step explanation:
what can 15 and 3 both be divided by
Answer: 15 and 3 can both be divided by 3 and 1
Answer:
tres y uno
Step-by-step explanation:
Tekan-Tekan Sdn. Bhd. has order for 200 Model AS-120 calculator for delivery on day 200. The calculator consists of three parts. Components 2 and 3 form subassembly 1 . Sub-assembly 1 and component 4 form the final assembly. Following are the work centers and times of each operation. Table Q3(a) shows routine file of the operation. Assuming: - Only one machine is assigned to each operation - The factory works on 8-hour shift, 5 days a week - All parts move in one lot of 200. (a) Illustrate the backward schedule based on the information given above. (12 marks) (b) Identify when component 3 must be started to meet the delivery date. (2 marks)
Component 3 must be started on day 197 to meet the delivery date of day 200.
To illustrate the backward schedule, we need to start from the delivery date (day 200) and work our way backward, taking into account the lead times and dependencies of each operation.
(a) Backward schedule:
Operation | Work Center | Time (hours) | Start Day
--------------------------------------------------------
Final Assembly | Work Center 1 | 1 | 200
Sub-assembly 1 | Work Center 2 | 2 | 199
Component 4 | Work Center 3 | 3 | 197
Component 2 | Work Center 4 | 4 | 196
Component 3 | Work Center 5 | 3 | ????
(b) To identify when component 3 must be started to meet the delivery date, we need to consider its dependencies and lead times.
From the backward schedule, we see that component 3 is required for sub-assembly 1, which is scheduled to start on day 199. The time required for sub-assembly 1 is 2 hours, which means it should be completed by the end of day 199.
Since component 3 is needed for sub-assembly 1, we can conclude that component 3 must be started at least 2 hours before the start of sub-assembly 1. Therefore, component 3 should be started on day 199 - 2 = 197 to ensure it is completed and ready for sub-assembly 1.
Hence, component 3 must be started on day 197 to meet the delivery date of day 200.
Learn more about Scheduling here:
brainly.com/question/30012511
#SPJ4
area of a circle
mathematics
Answer:
C
Step-by-step explanation:
Area of circle = \(\pi r^2\)
15/2 = 7.5
7.5 = radius
Plug 7.5 into the formula:
\(\pi 7.5^2\) = 176.71
Closest answer to 176.71 = 176.625
Answer would be C.
Triangle proofs level 2 please help!!!