A deliverable at the lowest level of each branch of a work breakdown structure is known as:________.

Answers

Answer 1

A deliverable at the lowest level of each branch of a work breakdown structure is known as: Work Packages

The work breakdown structure (WBS) in project management and systems engineering is the deliverable division of a project into smaller components. The work breakdown structure is an important workable project that organizes a team's work into manageable chunks. The Project Management Knowledge Body (PMBOK 5) defines a work breakdown structure as "the hierarchical breakdown of the total scope of work that the project team will perform to achieve the project objectives and create the necessary jobs".

A Work Package is a group of related tasks in a project. Because they look like projects themselves, they are often thought of as subprojects within a larger project. Work packages are the smallest unit of work that a project can be broken down into when creating your work breakdown structure (WBS). Tasks are often grouped into work packages based on geography, engineering majors, technology, or the time it takes to complete them.

To learn more about Work Package:

https://brainly.com/question/19866249

#SPJ4


Related Questions

On 1 October 2020, ABC Limited sold three machines to a customer for a total amount of R1900000. The three machines were delivered to the premises of the customer on the same day. Included in the sales contract are 1-year warranties for all three of the machines. A warranty for each of these machines may cost R 20000 to obtain. The customer received a trade discount of 10% for both tractors. ABC Limited awards a settlement discount of 6% to any customer who settles their account in full within 30 days of making a purchase. This particular customer often buys machinery from ABC Limited and based on past dealings with the customer ABC Limited expects that the customer will settle their account within 30 days. The customer settled their account in full on 3 November 2020. How many performance obligations are contained in the contract? 1 2 3 6

Answers

There are three performance obligations contained in the contract.

What are performance obligations? Performance obligations are commitments to deliver goods or services to customers. The company specifies which of these obligations are present in the arrangement with the customer by conducting a review of the goods or services they promised to offer, either separately or as a group.

A performance obligation is identified in the arrangement as a distinct promise to supply goods or services or a combination of the two that is separate from other obligations in the agreement, and ABC Limited is committed to fulfilling these obligations. Performance Obligation in the Contract In the given case, ABC Limited sold three machines for R1900000 to a customer on 1 October 2020 and delivered them on the same day.

All three machines are covered by 1-year warranties. A warranty for each of the three machines may cost R 20000 to obtain. Additionally, the customer received a 10% discount, and a 6% discount was awarded by ABC Limited for full settlement within 30 days. As a result, there are three performance obligations in the contract, one for each machine sold.

To know more about performance visit:

https://brainly.com/question/30164981

#SPJ11

Total sales: $60,230 Rate of commission: 6% on first $40,000
7% on next $10,000;
8% on sales over $50,000
Income: ?

Answers

Answer:

1000000 wdnjdkdidhxh fdjjxifid

according to the aicpa code of professional conduct, what would a covered member most appropriately do upon learning that another member of an attest engagement team is considering employment with the client?

Answers

According to the AICPA code of professional conduct, the covered member should notify an appropriate person in the firm upon learning that another member of an attest engagement team is considering employment with the client.

What is AICPA code of professional conduct?

The American Institute of Certified Public Accountants published the AICPA Code of Professional Conduct, which is a set of codified statements outlining a CPA's ethical and professional obligations. The code outlines requirements for auditor independence, objectivity, and integrity as well as obligations to customers and coworkers and behaviors that are detrimental to the accounting profession. The code must be written, revised, and reissued by the AICPA every year on June 1. In his speech to the American Association of Public Accountants' annual meeting in 1907, Joseph Edmund Sterrett discussed the controversy and problems surrounding the creation of a code of professional conduct.

To know more about AICPA refer:

https://brainly.com/question/17190947

#SPJ4

Why did Patagonia change their mission statement?

Answers

“Build the best product, cause no unnecessary harm, use business to inspire and implement solutions to the environmental crisis.”That's why Patagonia changed its previous mission statement.

Patagonia is a sparsely populated region located at the southern end of South America, mostly shared by Argentina and Chile. It covers an area of approximately 1,043,076 square kilometers (402,000 square miles) and includes diverse landscapes such as mountains, glaciers, forests, and grasslands.

Patagonia is known for its rugged beauty and outdoor recreation opportunities, including hiking, skiing, fishing, and kayaking. It is also home to several indigenous communities and a variety of unique wildlife, including pumas, guanacos, and condors. The name Patagonia is derived from the word "patagón," which was used by the explorer Ferdinand Magellan to describe the tall natives he encountered in the region.

To learn more about Patagonia here:

brainly.com/question/30408171

#SPJ4

What impression does it give if you are text messaging or listening to music while waiting to be called into an interview?

Answers

It would give me the impression that you’re not interested in the interview. If someone walked into an interview while doing the above personally I would see them as “having better things to do”

Anyways, Hope this somehow helps!

Which of the following is NOT a common goal of a strategic compensation policy?
a. To reward employees' past performance
b. To mesh employees' past performance with organizational goals
c. To remain competitive in the labor market
d. To attract new employees

Answers

The option that is NOT a common goal of a strategic compensation policy is:
b. To mesh employees' past performance with organizational goals.
A strategic compensation policy typically aims to reward employees' past performance (a), remain competitive in the labor market (c), and attract new employees (d). However, meshing employees' past performance with organizational goals (b) is not a common objective, as it focuses on past actions rather than aligning employee performance with future goals and growth of the organization. A successful compensation policy should encourage and incentivize employees to achieve future organizational objectives rather than merely evaluating their past contributions.

To know more about policy visit:

https://brainly.com/question/13036064

#SPJ11

the cost-benefit principle evaluates _____ costs and benefits, and willingness-to-pay considerations quantify _____ costs and benefits.

Answers

the cost-benefit principle evaluates both monetary and nonmonetary costs and benefits, and willingness-to-pay considerations quantify nonmonetary costs and benefits.

something which a buyer must pay for a product that is not money; the nonmonetary costs of buying a product includes the time spent looking for it and the risk taken that it will provide the desired results. A client who purchases a product does not just spend money; he also spends time and resources. A non-monetary issue often denotes the fact that the claimant certification was approved but has not yet been payable due to a problem that has to be resolved first. Non-financial consequences, such as those on the environment, society, or health, are often included in assessments but are difficult to quantify economically. The UIA is required to look into any problem, circumstance, or condition that has an impact on the claimant's entitlement to benefits.

learn more about nonmonetary costs here

https://brainly.com/question/15038228

#SPJ4

Which of the following might experience a factor of failure related to expansion?
A. A hair salon that hires new employees immediately after it opens
B. A restaurant that doesn't have a website
C. A shoe store located near another popular shoe store
D. A grocery store with employees who miss company meetings

Answers

Answer:

a

Explanation:

cggm nauseousness hfff fallen

The application of scientific knowledge to the development and improvement of goods and services is generally referred to as ______. Multiple choice question. technology information production

Answers

Answer:

Technology.

Explanation:

As the definition is seen above, these qualities are directed towards technology. Technology has advanced produce and sales of goods and services a lot. It shows itself in fastening and making production easier. And also in different other forms that come as advertising, E-commerce, communication etc. Orders of certain goods are been sent thousands miles away from the producing country and are seen to be received safe and sound at the other end of the purchase country. Also adverts can be seen of a Chinese product in far away Africa through television commercials and also internet.

Terrance has just signed a contract with a bank to get a loan to buy a new house. What is TRUE about this contract? A. Both the bank and Terrance share power of attorney. B. Terrance has participated in a guarantee of gain. C. Both parties now have an obligation to their agreement. D. Terrance is required to submit a verbal agreement.

Answers

Answer: C. Both parties now have an obligation to their agreement.

Explanation:

When parties get into a contract, they have a legal obligation to each other to fulfill their part of the agreement or the other party will be able to seek redress in a court of law.

Terrance and the bank are now parties to an agreement to provide Terrence with a loan to buy a house. The bank will have to fulfill this obligation by giving Terrence the loan and Terrence will fulfill his side of the agreement by making payments as stipulated in the loan covenant.

MegaMouth Inc. Produces two megaphone models, the Boomer and the Blaster. The company makes 15,000 units of the Boomer model and 16,400 of the Blaster model each year. MegaMouth inspects 1 Boomer for every 100 produced and 1 Blaster for every 80 produced. The company expects $11,360 in total inspecting costs for the coming year. What amount of the inspecting costs should be allocated to the Blaster model under activity-based costing

Answers

The amount that should be allocated to the Blaster model under activity-based costing is $6560.

How to calculate the costing?

Firstly, the total inspections for Boomer will be:

= 1/100 × 15000

= 150.

The total inspections for Blaster will be:

= 1/80 × 16400

= 205

Total inspections = 150 + 205 = 355

Therefore, the cost will be:

= $32 × (11360/355)

= $6560

Learn more about costing on:

https://brainly.com/question/25109150

Justify how dstv has been regarded as an example of a monopoly with following characteristics of monopoly natural of product access/entry to the market

Answers

Justification of a monopolist, DSTV as an example.

What is a monopoly?

Monopoly is a market structure that consist of a single seller of a product, who at the same time have control over price of the product.

DStv as a monopolist is unique in terms of product offering hence have no close substitute. Here, Dstv has control over the market and entry to the market is blocked because of being the sole producer or seller of the product.

Learn more about monopoly here: https://brainly.com/question/5832236

#SPJ4

Ted's property is in foreclosure, but he has some equity in his property. An investor suggests that she and Ted enter into a sales contract for a substantially higher price than the investor would actually pay. The investor pockets the cash and allows the house to be foreclosed on. What sort of scheme is this

Answers

Based on the given information the sort of scheme is: Equity skimming.

What is Equity skimming?

Equity skimming can be defined as the way in which an investor defraud or steal a person property equity  because the property is in foreclosure.

Since the investor pockets the cash he received from Ted and allow the house to be foreclosed the investor is engaging in what is called  equity  skimming which is fraudulent acts.

Inconclusion  the sort of scheme is: Equity skimming.

Learn more about Equity skimming here:https://brainly.com/question/1957305

If a seller sells its merchandise with the shipping terms FOB shipping point, it credits Revenue when the merchandise is ______.
ordered by the customer
shipped from the seller's place of business
paid for by the customer
received by the customer

Answers

If a seller sells its merchandise with the shipping terms FOB shipping point, it credits Revenue when the merchandise is shipped from the seller's place of business. The correct option is B.

What is FOB?

FOB stands for Free on Board, and it is a delivery term that specifies when the ownership and liability of goods are transferred from the seller to the buyer.

In a transaction involving FOB shipping point, the buyer is responsible for the goods when they are in transit, and the seller is responsible for the goods until they leave the facility. The term indicates where responsibility for the products has been transferred to the buyer.

The FOB is a phrase that is often used in shipping agreements, where it indicates that the seller has fulfilled his or her responsibility for goods once they have been delivered to a shipping company.

Therefore, the correct option is B.

Learn more about FOB here:

https://brainly.com/question/14527257

#SPJ11

What actions can people take to reduce hunger in local and global settings? Explain in details pls

Answers

Answer:

Kindly check explanation

Explanation:

Hunger often stems from poverty, Famine, inflation, war and so on. However, factors which often has a direct impact on food and coukd lead to hunger include poverty and Famine. To reduce or forestall this problem on a local and global scale, necessary steps which should be taken are those which tends to address the issue of food security. Which includes the empowerment of farmers and good funding and monitoring of the agricultural sector. Through this food cultivation could be done on a multi dimensional scale by providing support in terms of machinery, low interest loans in otter to enable farmers and other related stakeholders get access to the needs d capital for the development of their agricultural business. Also, good road network for easy transportation of farm produce. Alternative methods of watering such as irrigation farming should be upgraded as this could prove vital during periods of Rainfall shortage. The distribition of foods including adequate regularozation of prices is also key in other to prevent artificial inflation or scarcity in a bid to accrue higher profit.

the authors suggest the primary reward for an entrepreneur should be _______.

Answers

"financial success and personal fulfillment."the primary reward for an entrepreneur should be a combination of financial success and personal fulfillment.

Financial success refers to the monetary rewards gained from their business ventures, such as profits, revenue growth, and wealth accumulation. It serves as a measure of their business acumen and validates their entrepreneurial skills. However, personal fulfillment goes beyond financial gains and encompasses the satisfaction derived from pursuing their passions, making a positive impact on society, achieving personal goals, and experiencing a sense of purpose and accomplishment. Both financial success and personal fulfillment together form a holistic reward system that motivates and drives entrepreneurs to continue their entrepreneurial journey.

Learn more about entrepreneurial here:

https://brainly.com/question/30103080

#SPJ11

Which criteria would be the ranked most important when an organization is choosing off-the-shelf software

Answers

The two most important criteria are functionality and ease of installation

One of the most powerful predictors of entrepreneurial intent is that most future entrepreneurs possess a personality A. gregarious B. reactive O C. introverted OD. proactive

Answers

A. gregarious. Research suggests that individuals with a gregarious and extroverted personality tend to have higher entrepreneurial intent and are more likely to engage in entrepreneurial activities.

Openness to experience: Entrepreneurs are typically open-minded, curious, and willing to explore new ideas and opportunities.

Self-confidence: Entrepreneurs often exhibit high levels of self-confidence and self-belief, which helps them overcome challenges and take risks.

Need for achievement: Individuals with a strong need for achievement are driven by goals and a desire to excel, making them more likely to pursue entrepreneurial endeavors.

Proactive personality: Entrepreneurs tend to have a proactive approach to problem-solving, taking initiative and seizing opportunities rather than waiting for them to arise.

It's important to note that while certain personality traits can be predictors of entrepreneurial intent, they are not the sole determinants. Other factors such as prior experience, education, access to resources, and environmental influences also play a significant role in entrepreneurial decision-making and success.

Learn more about Entrepreneurs here:

https://brainly.com/question/31010585

#SPJ11

Zoowawa's nominal GDP rose by 6% between 2017 and 2018. If its inflation rate was 2.5%, by how much did its real GDP increase?

Answers

Answer:

3.5%.

Explanation:

Real GDP is understood to be that which arises from the difference between the economic growth (that is, of the GDP) of a country during a given period, and the inflation that occurred during that period. That is to say, inflation is subtracted from said economic growth.

Thus, since Zoowawa's nominal GDP grew by 6 percent, while inflation was 2.5 percent, the real GDP of that nation grew by 3.5 percent (6 - 2.5) during the mentioned period.

Examine the four different companies in the table, which shows their yearly
income and their tax rate. Which type of taxation does this table best
represent?
Tax rate
20%
Total income
$50 million
$100 million
$150 million
$200 million
Company A
Company B
Company C
Company D
15%
12%
10%
A. Regressive
B. Progressive
C. Indirect
D. Proportional

Answers

The Type of taxation this table represent is Option A Regressive Tax.

Type of Taxation

There are mainly four types of Taxes, these are Regressive, progressive, Indirect, and Proportional. In the given question the Regressive Taxation system is represented.

A Regressive Taxation system is one where Companies which have lower income have higher tax rate in comparison to big companies. In the given question the company which have lowest income is giving 15% of total income, while the largest company is giving 10% of their income.

Learn More about Taxation System here:

https://brainly.com/question/782502

Answer:proportional

Explanation:just took the testt

PLEASE HELP QUICK!!!
Which of the following is an advantage of buying your home over renting?
(1 point)
O You do not have to worry about the housing market in your area.
O The amount you pay each month is set by the terms of your mortgage.
O If something breaks, you have to fix it or pay to have it fixed.
O Your mortgage payments will far exceed the value of your home.

Answers

The amount you pay each month is set by the terms of your mortgage.

Answer:

The amount you pay each month is set by the terms of your mortgage.

Explanation:

connexus

if we want to model a random stock price, we should do so with an unbounded symmetric probability distribution.

Answers

Yes, an unbounded symmetric probability distribution is the best option for modeling a random stock price. This type of probability distribution can generate a wide range of outcomes that could represent the volatility of the stock market.

To model a random stock price with an unbounded symmetric probability distribution, you can use the following steps:


1. Calculate the expected return for the stock.
2. Calculate the variance of the stock’s returns.
3. Generate a random variable that follows an unbounded symmetric probability distribution.
4. Scale the random variable to the expected return and variance of the stock.
5. Simulate the stock's price using the random variable.

To know more about probability distribution refer here:

https://brainly.com/question/14210034#
#SPJ11

true/false. the time needed to produce the last unit declines by a constatn percentage

Answers

False. The time needed to produce the last unit does not necessarily decline by a constant percentage.

In fact, it may not decline at all and could even increase as production increases. This is due to a phenomenon known as diminishing marginal returns, which means that as more units are produced, the additional output gained from each additional unit decreases.

This can lead to a situation where it takes longer to produce each additional unit as production increases, rather than less time. Therefore, it is important to carefully monitor production processes and optimize them in order to minimize the effects of diminishing marginal returns and ensure that production remains efficient.

This can involve strategies such as investing in new technology, improving workflows, and optimizing supply chains. By doing so, businesses can improve their productivity and maintain a competitive edge in their markets.

To know more about constant percentage refer here:

https://brainly.com/question/26765608#

#SPJ11

which expression finds enzos net worth

Answers

"The expression that finds Enzo's net worth is $127100 - $88500. Enzo's net worth = Enzo's assets - Enzo's liabilities. The resulting number is his net worth." The correct option is A

To find Enzo's net worth, you would add up all of his assets and subtract from that all of his liabilities. The resulting number is his net worth.

The first thing by  definition that we have to do is:

net worth = Assets - liabilities

Thus, substituting the values we have:

net worth = 127100 - 88500

Enzo's net worth is:

$ 127100 - $ 88500. The correct option is A.

Complete question-

which expression finds enzos net worth

A. $127,100-$88,500

B. $127,100/$88,500

C. $88,500+$127,100

D. $88,500-$127,100

To know more about Enzo's net worth click below:

brainly.com/question/30053557

#SPJ1

whats the difference between leasing and financing a car?

Answers

Although it's difficult to compare, renting is frequently less expensive in the short run. The benefit of financing a vehicle is that, after your auto loan is repaid, all you have to pay for is gas and maintenance.

What differentiate leasing and financing?

When opposed to financing, leasing has a cheaper down payment and lower monthly payments for people who are watching their cash flow.

With a lease, you only pay for the depreciation of the car, rather than its full worth. A car is more cheap if the lease payment is smaller.

Therefore,  as opposed to lessees who must either continue leasing or buy their own vehicles. In the near run, leasing is frequently cheaper.

Learn more about financing here:

https://brainly.com/question/13810164

#SPJ4

state ant Three activities that took place during the forming stage

Answers

Answer:

Each stage plays a vital part in building a high-functioning team. In 1965, a psychologist named Bruce Tuck-man said that teams go through 5 stages of development: forming, storming, norning, performing and adjourning.

Explanation:

Hem and Nem are partners in a firm sharing profits in the ratio of 3:2. Their capitals were 80,000 and 60,000 respectively. They admitted Sam on Jan 1, 2019 as a new partner for 1/5th share in the future profits. Sam brought 60,000 as his capital.Calculate the value of goodwill of the firm and record necessary journal entries when Sam brings his share of goodwill in cash.

Answers

Answer:

Sam's capital account = $60,000 (for 1/5 of the firm)

the firm's total value = $60,000 x 5 = $300,000

goodwill = $300,000 - ($60,000 + $80,000 + $60,000) = $100,000

Hem's share of goodwill = ($80,000 / $140,000) x $100,000 = $57,143

Nem's share of goodwill = $100,000 - $57,143 = $42,857

the journal entry used to record goodwill:

Dr Goodwill 100,000

    Cr Hem, capital, 57,143

    Cr Nem, capital, 42,857

When interviewing, you should always try to lean towards the more formal side. In general, you would want to dress one step higher than those who currently work there

Answers

Answer: False, it'll be right to appear moderate and coperate

Explanation:

When attending interviews it's advised you put on your best behavior and look good. It won't be encouraging to out-dress the existing workers, it won't speak fantastic to dress better bit it's required to look good and moderate

Joe Coyle is the managing director of Easter Feast Ltd ("Easter Feast"), a food and beverage chain located in Singapore. The company is looking to expand its business and exploring the possibility of acquiring Winter Delight Pte Ltd ("Winter Delight"). The latter had been facing financial difficulties due to reduced sales attributed to the pandemic. The following points were raised in a recent management meeting to discuss the proposed acquisition of Winter Delight: (a) Easter Feast's financial controller proposed that the company take a 30% stake in Winter Delight. However, Joe is adamant that Easter Feast needs to buy over 50% of Winter Delight's issued share capital in order for it to be a subsidiary of Easter Feast. Discuss the validity of Joe's opinion with reference to the relevant financial reporting standard(s). (13 marks) (b) Some members of Easter Feast's management team noted that Winter Delight has a large bank loan balance owing to KWC Bank ("KWC"). The loan contract has a clause that requires Winter Delight seek approval from KWC for purchases above $1,000 should Winter Delight default on any loan repayments. Joe is worried that this means KWC has control over Winter Delight even after the acquisition by Easter Feast. Advise Joe if his concern is warranted and should be addressed. (4 marks) (c) Summer Ray Ltd ('Summer Ray') currently holds 20% of the shares in Winter Delight. In an effort to raise funds for a new project, Winter Delight is issuing convertible bonds that can be converted to ordinary shares at the bondholders' discretion. Summer Ray has indicated its interest in acquiring a significant number of the bonds. Discuss the possible impact that this may have on Easter Feast's plan to acquire Winter Delight. (8 marks)

Answers

a) The validity of Joe's opinion with reference to the relevant financial reporting standards is correct as it complies with FRS 110. b) Joe's concern is valid, and it should be addressed. c) The possible impact of Summer Ray acquiring a significant number of Winter Delight's convertible bonds should be considered in Easter Feast's decision to acquire Winter Delight.

a) Joe's opinion is valid with reference to the relevant financial reporting standard. According to FRS 110 Consolidated Financial Statements, control is defined as the power to govern the financial and operating policies of an entity so as to obtain benefits from its activities. Control arises when the investor has the power to govern the financial and operating policies of the entity under consideration. In order to be considered a subsidiary, the investor must hold more than 50% of the voting rights of the entity under consideration. As a result, Joe's opinion is valid, as Easter Feast will only have control over Winter Delight if it acquires more than 50% of its issued share capital. Joe believes that purchasing over 50% of Winter Delight's issued share capital would make it a subsidiary of Easter Feast and would enable it to exercise control over Winter Delight's financial and operating policies. Thus, Joe's opinion is consistent with FRS 110.

b) According to FRS 110, control is defined as the power to govern the financial and operating policies of an entity so as to obtain benefits from its activities. In this case, if KWC Bank has control over Winter Delight, Easter Feast's control over Winter Delight will be impacted. As a result, Joe's concern is warranted, and the acquisition should be structured in a way that addresses the control issue.

c) If Summer Ray acquires a significant number of Winter Delight's convertible bonds, it may have an impact on Easter Feast's plan to acquire Winter Delight. If Summer Ray acquires enough bonds to have control over Winter Delight's financial and operating policies, Easter Feast's ability to control Winter Delight may be impacted. This is because control is defined as the power to govern the financial and operating policies of an entity so as to obtain benefits from its activities. If Summer Ray has the power to govern Winter Delight's financial and operating policies, then Easter Feast's control over the entity will be diminished.

Learn more about FRS 110 here: https://brainly.com/question/14615122

#SPJ11

What best describes the main purpose of a budget

Answers

Explanation:

A budget helps create financial stability. By tracking expenses and following a plan, a budget makes it easier to pay bills on time, build an emergency fund, and save for major expenses such as a car or home. Overall, a budget puts a person on stronger financial footing for both the day-to-day and the long term.

Other Questions
in the film atonement, which of the following does not accurately represent a comparison of the elegy theme and the war theme? group of answer choices a key feature of an oligopoly is that the competing firms in the industry blank , meaning the actions of any one firm will influence the behaviors of the other firms. multiple choice question. A purchasing consortium: a. consists of two or more independent organizations that combine their requirements for materials, services and capital goods to gain better pricing, service and technology from suppliers. b. speeds up the purchasing process, but does not usually result in price concessions from suppliers. c. results in price concessions from suppliers, but usually does not speed up the purchasing process. d. consists of two or more divisions of the same organization that combine their requirements for materials, services and capital goods to gain better pricing, service and technology from suppliers.e. is a form of collaborative purchasing used only by the public sector to deliver a wider range of services at a lower total cost. 12 yd.5 yd.What is the length of the hypotenuse? If necessary, round to the nearest tenth.C=yards please help tysm and no links the mass of solute per 100 ml of solution is abbreviated as (m/v). mass is not technically the same thing as weight, but the abbreviation (w/v) is also common. The shape of star dunes is mostly due to ___.variable wind speedsthe amount of vegetationvariable wind directionsthe amount of sand Read the following passage:He was the clear winner of the snowboard halfpipe championship. Hanyu won after he performed more snowboard tricks thanthe people who didn't win. Unlike them, Hanyu got more height off the snow. The winner did the most difficult snowboardtricks.Which revision below most effectively uses referents to create coherence?Hanyu was the clear winner of the snowboard halfpipe championship. To begin with, he won for performing more tricksO than his competitors. Next, he showed a higher degree of difficulty than them. Finally, he got more height off the snow thanthe rest.O He was the winner of the snowboard halfpipe championship by performing more, higher, harder tricks.OHanyu was the clear winner of the snowboard halfpipe championship. He performed more tricks than his competitors, andwith a higher degree of difficulty. Hanyu also got more height off the snow than anyone else.Hanyu was the clear winner of the snowboard halfpipe championship. He performed more snowboard tricks. He had moreheight. He did the most difficult tricks. will mark as brainliest if correct for both questions / chemistry monthly rent on a factory building is a ________. answer a) variable cost b) fixed cost c)mixed cost d)high-low cost Use the order of operations to find the value of the following expression.102 - 2 (8) + 119515155795 During the reign of Justinian, the people of Constantinople MOST LIKELY thought of themselves aswhich of the following?ARomansBTurksOttomansDByzantines Which types of food and drinks with the nurse provide to the patient is recovering from a full thickness burn ? consumer backlash against price discrimination often focuses on the issue of consumers' needs versus their wants. fairness. honesty. profit. Which of the following executive departments have the largest roles in shaping United States foreign policy?State and Defense Anyone help? dont understand this question? Some kids are playing with a jump rope. they notice that they can make transverse waves when they shake the rope up and down. they shake it quickly and notice that the wave that forms appears to be holding still. what type of wave interaction is this? let x1...Xn ~ Poisson() be iid and let = 2.find the maximum likelihood estimator of and compute the bias of this estimator (). is this estimator consistent? HELP ME ON THIS LAB REPORT PLEASE!!! What is a3+11=-5 and how to doit with steps?